é PT PERUSAHAAN GAS NEGARA (Persero) Tbk
PMO INFRASTRUKTUR
PST pRoVEK JAWA BAGIAN BARAT DAN SUMATERA BAGIAN SELATAN
LEMBAR DISPOSISI
‘Tanggal Penerimaen : 22-Apr-19 No.Agenda 20182950
Dari PT PGAS Solution No. Surat
Dtuukan Kepada = PM Pengemibangen JB No. Dokumen PGAS.CA-A02-QCT-PR.0002 Rev A
0s, Tol. SuratDok. > 18-Apr-19
No. Tranemifal 03281-PGAS-TM-CA2019
Tipe Dokumen Pengadaan MRS Due Date 29-Apr-18
Perial FAT Procedure - Pengedeon MRS P3E1-1/1-4/2-10.3-50/26-G.16 - PT Graha Utama Development (Hote! Santha
Radia) - Palembang
KEPADA PARAF | TANGGAL | PARAF | TANGGAL
IPM Pengombangan ia
1
Vy
JPM Kehancalan
DISPOSISI
“TReview DiBahas “Untuk diselesaikan/atndaklanjut Di Ketahul
DISPOSISI IT LEADER JBB
PROGRAM:
PM PENGEMBANGAN JARINGAN JBB :
Bee ete H4/ny + Me
let koma he, 4 Sb fe
PM KEHANDALAN JARINGAN JBB :PT. Perusahaan Gas Negara.Tbk Dp: SOLUTION
pen "Bessey action for excellence
em PT PGAS SOLUTION
FACTORY ACCEPTANCE TEST (FAT) PROCEDURE
DOCUMENT NO. Rev
PGAS-CA-A802-GCT-PR-0002 A Page Tonle:
PEMILIK PEKERIAAN 1 PT PERUSAHAAN GAS NEGARA Tbk
NAMA PEKERIAAN 1 KERIASAMA PENYALURAN GAS KE CALON PELANGGAN
‘TERMASUK FASILITAS, BARANG, MAUPUN PERALATAN YANG
TERKAIT (CUSTOMER ATTACHMENT) TAHUN 2018 AREA
PALEMBANG — PT GRAHA UTAMA DEVELOPMENT (HOTEL
SANTIKA RADIAL PALEMBANG)
NOMOR KONTRAK
065700.PK/HK.02/PMI.PI/2018
7 G2 Wo comments, Work may prosced
| coos ayfinor comments, Work may proce
| Glow pons rs cocoon par oon
cots Ca ec at rie Ts ia donut,
| Information only
| Approval of this document does not reliove contractor of
‘ign responsibilty of lability the applicable contract
A Issued for Review 16/04/19 INS INS APH
By cHko | apvo | apvo
Rev, DESCRIPTION DATE
PGAS PGNé PT. Perusahaan Gas Negara.Tbk p SOLUTION
pen Teesesy ae
egy tore PT PGAS SOLUTION
[ FACTORY ACCEPTANCE TEST (FAT) PROCEDURI eee
DOCUMENT NO. Rev Pages eid
PGAS-CA-A902-QCT-PR-0002 A ane 20
LEMBAR KRONOLOGIS REVISI DOKUMEN
Rev No
Date
Description
16/04/19 _| Issued for Review