Professional Documents
Culture Documents
Work Programme For Maintenance Daily Roster For Handyman 2013
Work Programme For Maintenance Daily Roster For Handyman 2013
Clean drain around the kitchen area Admin and Teachers staff room
11:00 to 12:00 Clean and was foot path around the kitchen
LUNCH BREAK
12:00 to 1:00 pm
Check back and empty all bins also clean dining hall drains
1:00pm to 3:15 pm Assist technical staff
To perform any other duties
S. De Weever Dormitories 7:15 am to 9:30 am Remove cow dropping from lawns and walkways
R. Walcott Wash & Scrub cow dropping residue
Empty garbage bins and wash clean on ground floor
Clean drains around dorms
9:45 am to 11:45 am Empty garbage bins and wash clean from dorms top and middle flats
Heap up garbage disposable site for burring
1:15pm to 2:30 pm Cobb web passage ways front and back stairways’
Slashing with brush 7:00 to 9:00 am Road edges, welcome sign, along footpath, store and around admin building
cutter also line space.
CULVERT ROBERTSON
NAME AREAS TIME ACTIVITIES
T. Slowe Teaching Block No. 7:15 am to 9:30 am Check and clean walkways & passage ways of cow dropping other
A. Sa Silva 1,2 & Admin. debris
Clean tarmac and vehicle park of cow droppings wash of resident
Clean drains with spade and boss broom
11:00 to 12:00 Clean drain around the kitchen area Admin and Teachers staff room
Clean and was foot path around the kitchen
1:00pm to 3:15 pm Check back and empty all bins also clean dining hall drains
Assist technical staff
To perform any other duties