PROJECT NAME:
CONSTRUCTION OF OFFICE AND WAREHOUSE OF GENERAL SERVICE OFFICE
4" CHB'S WITH MORTAR AND FILLER AND PLASTAR 828.00 SQM 1,165.91 965,372.96
X SUB-TOTAL - 965,372.96
5.0 REINFORCEMENT WORKS
A. 16MM DEFORMED STEEL BAR 1,006.00 KGS 87.21 87,728.34
B. 12MM DEFOFORMED STEEL BAR 410.00 KGS 86.54 35,481.56
C. 10MM DEFORMED STEEL BARS 2,796.00 KGS 81.38 227,535.34
E. TIE WIRE # 16 410.00 KGS 132.84 54,465.68
X SUB-TOTAL - 405,210.92
6.0 STEEL DECKING WORKS
1,492.81 261,241.34
C. 2"X4" C 6M C-PURLINS 175.00 PCS
612.22 52,038.60
D. 16MM SAG ROD 85.00 PCS
301.92 9,057.48
E. TURN BUCKLE 30.00 SETS
X SUB-TOTAL - 1,330,978.94
8.0 ROOFING WORKS
LONG SPAN, DURATILE ROFFING SHEETS, WITH RIDGE ROLL,
1,320.48 970,552.50
FLASING GUTTER AND OTHER ACCESSORIES 735.00 SQM
X SUB-TOTAL - 970,552.50
9.0 ELECTRICAL WORKS
PROJECT NAME:
CONSTRUCTION OF OFFICE AND WAREHOUSE OF GENERAL SERVICE OFFICE
PROJECT NAME:
CONSTRUCTION OF OFFICE AND WAREHOUSE OF GENERAL SERVICE OFFICE
1,542.35 749,583.06
HARDIFLEX BOARD ON METAL FRAMINGS WITH ACCESSORIES 486.00 SQM
X SUB-TOTAL - 749,583.06
13.0 TILE WORKS
PROJECT NAME:
CONSTRUCTION OF OFFICE AND WAREHOUSE OF GENERAL SERVICE OFFICE
PROJECT NAME:
CONSTRUCTION OF OFFICE AND WAREHOUSE OF GENERAL SERVICE OFFICE S-CURVE AND WORK SCHEDULE
199,360.00 0.09 0.08 0.17 33,891.20 27,990.14 61,881.34 261,241.34 1,492.81 261,241.34 159,488.00
C. 2"X4" C 6M C-PURLINS 175.00 PCS
39,712.00 0.09 0.08 0.17 6,751.04 5,575.56 12,326.60 52,038.60 612.22 52,038.60
D. 16MM SAG ROD 85.00 PCS 31,769.60
6,912.00 0.09 0.08 0.17 1,175.04 970.44 2,145.48 9,057.48 301.92 9,057.48 5,529.60
E. TURN BUCKLE 30.00 SETS
X SUB-TOTAL 1,015,704.32 - - - - - - - - 1,330,978.94 1,015,704.32 Ok 13% PLAN 95,069.92 95,069.92 95,069.92 95,069.92 95,069.92 95,069.92 95,069.92
ACTUAL
8.0 ROOFING WORKS
LONG SPAN, DURATILE ROFFING
SHEETS, WITH RIDGE ROLL, FLASING 735.00 SQM 740,653.62 0.09 0.08 0.17 125,911.12 103,987.77 229,898.88 970,552.50 1,320.48 970,552.50 629,555.58 0.85
GUTTER AND OTHER ACCESSORIES
X SUB-TOTAL 740,653.62 - - - - - - - - 970,552.50 740,653.62 Ok 10% PLAN
ACTUAL
9.0 ELECTRICAL WORKS
51,840.00 0.09 0.08 0.17 8,812.80 7,278.34 16,091.14 67,931.14 7,547.90 67,931.14 31,104.00 0.6
WOODEN PANEL DOOR 800mmX2100mm 9.00 SETS
WOODEN PANEL DOOR
8,544.00 0.09 0.08 0.17 1,452.48 1,199.58 2,652.06 11,196.06 11,196.06 11,196.06 5,126.40 0.6
1000mmX2100mm 1.00 SETS
51,840.00 0.09 0.08 0.17 8,812.80 7,278.34 16,091.14 67,931.14 33,965.57 67,931.14 31,104.00 0.6
ALUMINUM SLIDING ROLLED UP DOOR 2.00 SETS
X SUB-TOTAL 128,352.00 - - - - - - - - 168,192.46 128,352.00 Ok 2% PLAN
ACTUAL
TUBULAR STEEL INSTALLATION ON
- - - - - - - - -
16.0 STAIR RAILINGS
TUBULAR STEEL INSTALLATION ON
72,692.68 0.09 0.08 0.17 12,357.76 10,206.05 22,563.81 95,256.49 37.40 95,256.49
STAIR RAILINGS 2,547.00 KGS
X SUB-TOTAL 72,692.68 - - - - - - - - 95,256.49 72,692.68 Ok 1% PLAN 31,752.16 31,752.16
ACTUAL
17.0 WATERPROOFING WORKS
CEMENTITIOUS WATERPROFFING
COMPOUND ON SECOND FLOOR 20,217.65 0.09 0.08 0.17 3,437.00 2,838.56 6,275.56 26,493.21 816.43 26,493.21
COMFORT ROOMS 32.45 SQM
X SUB-TOTAL 20,217.65 - - - - - - - - 26,493.21 20,217.65 Ok 0% PLAN
ACTUAL
- - - - - - - - - -
GRAND TOTAL 3,563,133.18 7,642,542.87 - - - - - - - - 10,014,788.18 10,014,788.18 100%
TOTAL 342,779.13 224,206.52 224,206.52 319,276.44 319,276.44 319,276.44 319,276.44 251,741.29 244,432.54 276,785.10 402,073.08 402,073.08
overhead 3,204,732.22 PLAN CUMMULATIVE 342,779.13 566,985.65 791,192.17 1,110,468.61 1,429,745.05 1,749,021.49 2,068,297.93 2,320,039.22 2,564,471.76 2,841,256.86 3,243,329.94 3,645,403.02
29% profit 1,001,478.82 % WEIGHT 0.03 0.06 0.08 0.11 0.14 0.17 0.21 0.23 0.26 0.28 0.32 0.36
Expenses 5,808,577.14
Total 10,014,788.18
Prepared by:
130 140 150 160 170 180 190 200 210 220 230 240 250 260 270
51,302.16 51,302.16
62,465.26 62,465.26 62,465.26 62,465.26 62,465.26 62,465.26 62,465.26 62,465.26 62,465.26 62,465.26 62,465.26 62,465.26
31,752.16
26,493.21
464,538.34 400,433.61 495,029.76 529,988.00 684,193.27 716,545.83 783,531.21 526,010.47 451,609.79 451,609.79 451,609.79 200,659.31 71,208.67 71,208.67 71,208.67
4,109,941.36 4,510,374.97 5,005,404.73 5,535,392.73 6,219,585.99 6,936,131.82 7,719,663.04 8,245,673.50 8,697,283.29 9,148,893.08 9,600,502.87 9,801,162.18 9,872,370.85 9,943,579.51 10,014,788.18
0.41 0.45 0.50 0.55 0.62 0.69 0.77 0.82 0.87 0.91 0.96 0.98 0.99
Republic of the Philippines
PROVINCIAL GOVERNMENT OF LANAO DEL NORTE
Gov. Arsenio A. Quibranza Provincial Government center
Tubod, Lanao del Norte
EQUIPMENT SCHEDULE
PROJECT NAME:
CONSTRUCTION OF OFFICE AND WAREHOUSE OF GENERAL SERVICE OFFICE
N o s o f D a y s
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270
Manpower
1 BACKHOE 1 1 1
2 MINI DUMPTRUCK 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 BOOM TRUCK 1 1 1 1 1 1 1 1 1
4 1-BAGGER MIXER 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5 PORTA LIFT 1 1 1 1 1 1 1 1 1 1 1
6 HAND TOOLS 2 2 2 2 2 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 4 4 4 4 4
TOTAL MANPOWER 4 4 4 5 5 10 10 10 10 10 10 11 10 10 10 10 10 10 10 10 10 10 5 5 5 5 5
Republic of the Philippines
PROVINCIAL GOVERNMENT OF LANAO DEL NORTE
Gov. Arsenio A. Quibranza Provincial Government center
Tubod, Lanao del Norte
MANPOWER SCHEDULE
PROJECT NAME:
CONSTRUCTION OF OFFICE AND WAREHOUSE OF GENERAL SERVICE OFFICE
N o s o f D a y s
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270
Manpower
1 Project Manager 1 1 1 1 1 1 1 1 1 1 1
2 Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 Electrical Engineer 1 1 1 1 1
4 Electrician 1 1 1 1 1 1 1 1 1
5 General Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 Safety Officer 1 1 1 1 1 1 1 1
7 Plumber 1 1 1 1 1 1 1 1 1 1 1 1
8 Painter 5 5 5 5 5 5 5 5 5 5 5 5
9 Carpenter/Mason 5 5 5 5 5 5 5 8 8 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 3 3
10 Laborer 3 3 3 3 3 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 4 4 4 4 4 4 4
11 Operator/ Driver 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
TOTAL MANPOWER 13 12 12 14 12 16 18 20 20 22 22 21 24 21 22 26 25 24 27 19 16 18 16 16 17 17 17
Republic of the Philippines
PROVINCIAL GOVERNMENT OF LANAO DEL NORTE
Gov. Arsenio A. Quibranza Provincial Government center
Tubod, Lanao del Norte
CASH FLOW
PROJECT NAME:
CONSTRUCTION OF OFFICE AND WAREHOUSE OF GENERAL SERVICE OFFICE
CASH FLOW
12,000,000.00
10,000,000.00
8,000,000.00
6,000,000.00
4,000,000.00
2,000,000.00
- - - - - - - - - - - - - - -
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
TOTAL 342,779.13 156,671.36 156,671.36 251,741.29 251,741.29 251,741.29 251,741.29 251,741.29 284,953.63 317,306.20 442,594.17 442,594.17 505,059.43 440,954.70
CUMMULATIVE 342,779.13 499,450.49 656,121.86 907,863.14 1,159,604.43 1,411,345.72 1,663,087.01 1,914,828.29 2,199,781.93 2,517,088.12 2,959,682.29 3,402,276.47 3,907,335.90 4,348,290.60
% WEIGHT 0.03 0.05 0.07 0.09 0.12 0.14 0.17 0.19 0.22 0.25 0.30 0.34 0.39 0.43
TOTAL 535,550.85 570,509.09 724,714.36 757,066.92 783,531.21 526,010.47 451,609.79 451,609.79 451,609.79 200,659.31 71,208.67 71,208.67 71,208.67
CUMMULATIVE 4,883,841.45 5,454,350.54 6,179,064.90 6,936,131.82 7,719,663.04 8,245,673.50 8,697,283.29 9,148,893.08 9,600,502.87 9,801,162.18 9,872,370.85 9,943,579.51 10,014,788.18
% WEIGHT 0.49 0.54 0.62 0.69 0.77 0.82 0.87 0.91 0.96 0.98 0.99 - -
Republic of the Philippines
PROVINCIAL GOVERNMENT OF LANAO DEL NORTE
Gov. Arsenio A. Quibranza Provincial Government center
Tubod, Lanao del Norte
BID SUMMARY
PROJECT NAME:
CONSTRUCTION OF OFFICE AND WAREHOUSE OF GENERAL SERVICE OFFICE
1.00
Total Labor Cost 450,800.80
Total Equipment and Labor Cost 473,340.84
C Output = 1
D Unit Cost, Equipment + Labor /Output = 473,340.84