DEPARTMENT OF MECHANICAL ENGINEERING

DYNAMICS OF MACHINERY LAB

LAB INCHARGE : Mr.G.PALANIVEL DATE: 17.07.2019


LAB ASSISTANT : Mr.S.VEERABATHIRAN

SL. NO. NAME OF MACHINE OP. STATUS TYPE OF FAULT REMARKS


SPRING MASS SYSTEM –SERIES 1 WORKING
1 - -
&PARALLEL SET UP (UNDAMPED)

NATURAL FREQ. OF UNDAMPED 1 WORKING


2 - -
SINGLE/DOUBLE ROTOR SYSTEM

COMPOUND PENDULUM & BI- 1 WORKING


3 - -
FILAR SUSPENSION

4 TRI-FILAR SUSPENSION METHOD 1 WORKING - -


UNIVERSAL GOVERNOR (WATT, 1 WORKING
5 PORTER,PROELL & HARTNELL SET - -
UP)

6 SINGLE ROTOR SYSTEM 1 WORKING - -


7 TWO ROTOR SYSTEM 1 WORKING - -
8 SPRING MASS SYTEM ( DAMPED) 1 WORKING - -
9 MOTORISED GYROSCOPE 1 WORKING - -
10 WHIRLING OF SHAFTS 1 WORKING - -
11 GEAR PARAMETERS WORKING - -
STATIC AND DYNAMIC 1 NOT WORKING MOTOR PROBLEM SERVICE
12
BALANCING REQUIRED

CAM MOTION ANALYSER 1 NOT WORKING POWER NOT SUPPLY SERVICE


13
REQUIRED

JOURNAL BEARING APPARATUS 1 NOT WORKING OIL LEAKAGE SERVICE


14
REQUIRED

LAB INCHARGE HOD OM PRINCIPAL


DEPARTMENT OF MECHANICAL ENGINEERING
MANUFACTURING PROCESS LAB

LAB INCHARGE: Mr.S.SUGUMAR DATE: 17.07.2019


LAB ASSISTANT: Mr.G.SRINIVASAN

SL.
NAME OF MACHINE QTY. STATUS TYPE OF FAULT REMARKS
NO.

1 ALL GEARED LATHE 2 WORKING -

2 CONE PULLY LATHE 3 WORKING - -


CAPSTAN LATHE 1 NOT WORKING DEMO PURPOSE ONLY SERVICE NOT
3
REQUIRED
4 LIGHT DUTY LATHE 2 WORKING -
UNIVERSAL MILLING 1 WORKING
5 -
MACHILNE
6 PILLAR DRILLING MACHILNE 1 WORKING -
7 UNIVERSAL DRILLING MACHINE 1 WORKING -
8 SHAPING MACHINE 1 WORKING -
9 POWER HACKSAW MACHINE 1 WORKING -
10 BENCH GRINDING MACHINE 1 WORKING -
11 CYLINDRICAL GRINDILNG M/C WORKING -
12 GEAR HOBBING MACHINE 1 WORKING

CNC LATHE MACHINE 1 WORKING LUBRICATOR NOT SERVICE


13
WORKING REQUIRED
CNC MILLING MACHINE 1 NOT WORKING SOFTWARE FAULT SERVICE
14
REQUIRED

LAB INCHARGE HOD OM PRINCIPAL


DEPARTMENT OF MECHANICAL ENGINEERING
BASIC WORKSHOP LAB

LAB INCHARGE: Mr.C.MANIKANDAN DATE: 17.07.2019


LAB ASSISTANT: Mr.G.SRINIVASAN

SL.
NAME OF MACHINE QTY. STATUS TYPE OF FAULT REMARKS
NO.

1 CARPENTRY VICE 11 NOT WORKING DAMAGE TO BE CHANGE

2 SNIP (SHEET METAL CUTTER) 11 NOT WORKING WORN OUT TO BE CHANGE

WING NUT AND


3 HACKSAW FRAME 14 BLADE IS NOT
NOT WORKING BOLT TO BE
TEIGHTENING
CHANGE

4 WELDING TRANSFORMER 2 POWER SUPPLY


NOT WORKING ELECTRIC FAULT
TO BE CHECK.

LAB INCHARGE HOD OM PRINCIPAL


DEPARTMENT OF MECHANICAL ENGINEERING
CAD/CAM LAB

LAB INCHARGE : Mr.S.RAVINDRAN DATE: 17.07.2019


LAB ASSISTANT : Mr.S.VEERABATHIRAN

SL. NO. NAME OF MACHINE OP. STATUS TYPE OF FAULT REMARKS


SERVICE
1 COPUTER SYSTEM 36 6 - NOT WORKING BOOTING PROBLEM
REQUIRED

LAB INCHARGE HOD OM PRINCIPAL

Dear Sir,
Please find the attachment of final year mechanical student name list and the faculties
accompanying the students for one day industrial visit to Rane Brake Lining Limited, Thirubuvanai,
Puducherry on 23/7/19.

The faculties are: Mr. S.Ravindran AP/MECH , Mr.M. Nataraj AP/MECH, Mr.C. Manikandan
AP/MECH

With Regards,
RAVINDRAN.S
Assistant Professor,
Placement Co-ordinator / Mech
Sri Venkateshwaraa College of Engg & Technology
Ariyur
Puducherry.
Mobile No: 9790672303

You might also like