DAFTAR HARGA SATUAN UPAH

KEGIATAN : Penyediaan Jasa Kebersihan Kantor


PEKERJAAN : Belanja Pemeliharaan ( Cleaning Servis ) Tengku maharatu
LOKASI : Kabupaten Siak
TAHUN ANGGARAN : 2013

NO URAIAN SATUAN HARGA KET

I I. UPAH KERJA
1 Manager Lapangan Org/ Bulan 3,021,000.00
2 Supervisor Org/ Bulan 2,071,000.00
3 Clening Servis Org/ Bulan 1,520,000.00

II II. DATA HARGA PERALATAN


1 Sponge/ Tapas Buah 109,250.00
2 Floor Duster Biru Buah 71,250.00
3 Tangki Floor Duster Alum + Frame Buah 1,187,500.00
4 Mop Cotton Buah 104,500.00
5 Tangki Mop Cotton Alummunium Buah 1,520,000.00
6 Hand Sprayer Buah 114,000.00
7 Lap Kanebo Buah 23,750.00
8 Dust Pan Plastik Buah 102,125.00
9 Sapu Nylon Buah 13,775.00
10 Floor Wiper Buah 12,825.00
11 Ember Press Buah 33,440.00
12 Kape Buah 114,000.00
13 Furniture Polish Liquit Galon 128,250.00
14 Kemoceng Buah 114,950.00
15 Kain Manjun Buah 74,100.00
16 Signed/ Caution Wet Floor Buah 114,000.00
17 Window Washert 35 Cmm Buah 150,100.00
18 Window Wiper 35 Cmm Buah 137,750.00
19 ReplacmanRubber Squzee Mtr 11,115.00
20 Plastik Sampah Lbr 11,970.00
21 Hand Brus Nylon Buah 35,625.00
22 Kop Wc Buah 15,675.00
23 Rak Ball Nylon Buah 107,350.00
24 Lap Pel Buah 26,125.00
25 Skop Sampah Unit 16,644.00
26 Gerobak Sorong Unit 194,750.00
27 Sapu Lidi Unit 6,175.00

III III. BAHAN MATERIAL


1 Pembersih Lantai Galon 166,250.00
2 Tissu Kotak 87,875.00
3 Pengharum Ruangan Klg 71,250.00
4 Class Cleaneer Golon 120,650.00
5 Detergen Kg 16,625.00
6 Vim Btl 107,350.00

IV IV. CAPEX
1 Wet & Dry Vaccum Cleaner Unit 128,250.00
2 Double Bucket + Pres Mop Unit 213,750.00
3 Schafffolding " 7 Trap " Ls 1,140,000.00
4 Tangga Multi Fingtion Unit 308,750.00
5 Tangga 2 Meter Unit 176,700.00
6 Long Stik 3 Metr Unit 211,850.00
7 Long Stik 6 Metr Unit 427,500.00
8 Hand Draiyer Unit 164,350.00
9 Kabel Roll 50 M' Roll 332,500.00
ANALISA HARGA SATUAN
KEGIATAN : Penyediaan Jasa Kebersihan Kantor
PEKERJAAN : Belanja Pemeliharaan ( Cleaning Servis ) Tengku maharatu
LOKASI : Kabupaten Siak
TAHUN ANGGARAN : 2013

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4

1 An. 1 M2 Pembersihan Ruangan & Furniture


a Biaya Tenaga
Manager Lapangan 0.000270 Org/ Bln
Supervisor 0.000440 Org/ Bln
Clening Servis 0.003300 Org/ Bln

b Biaya Material
Sponge/ Tapas 0.000148 Buah
Floor Duster Biru 0.000837 Buah
Tangki Floor Duster Alum + Frame 0.000418 Buah
Mop Cotton 0.000837 Buah
Tangki Mop Cotton Alummunium 0.000418 Buah
Hand Sprayer 0.000418 Buah
Lap Kanebo 0.000418 Buah
Dust Pan Plastik 0.000418 Buah
Sapu Nylon 0.000418 Buah
Floor Wiper 0.000418 Buah
Ember Press 0.000418 Buah
Kape 0.000418 Buah
Furniture Polish Liquit 0.000650 Galon
Kemoceng 0.000790 Buah
Kain Manjun 0.000400 Buah
Signed/ Caution Wet Floor 0.000200 Buah

c Bahan Pembersih
Pembersih Lantai 0.000420 Galon
Tissu 0.004000 Kotak
Class Cleaneer 0.000714 Klg
Detergen 0.002090 Kg
Vim 0.002090 Btl

d Capex
Wet & Dry Vaccum Cleaner 0.000418 Unit
Double Bucket + Pres Mop 0.000418 Unit

Total

2 An. 1 M2 Pembersihan Dinding, Gorden, Plapond


a Biaya Tenaga
Manager Lapangan 0.000500 Org/ Bln
Supervisor 0.000800 Org/ Bln
Clening Servis 0.003500 Org/ Bln

b Biaya Material
Sponge/ Tapas 0.000148 Buah
Lap Kanebo 0.000418 Buah
Window Washert 35 Cmm 0.001040 Buah
Window Wiper 35 Cmm 0.001040 Buah
ReplacmanRubber Squzee 0.001040 Mtr
Kape 0.000418 Buah
Kain Manjun 0.000400 Buah
Plastik Sampah 0.000520 Lbr
Kemoceng 0.000790 Buah

c Bahan Pembersih
Class Cleaneer 0.001290 Galon
Detergen 0.002090 Kg
Vim 0.002090 Btl

d Capex
Schafffolding " 7 Trap " 0.000520 Ls
NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
Tangga Multi Fingtion 0.000520 Unit
Tangga 2 Meter 0.000520 Unit
Long Stik 3 Metr 0.000520 Unit
Long Stik 6 Metr 0.000520 Unit

Total
NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4

3 An. 1 M2 Pembersihan Toilet


a Biaya Tenaga
Manager Lapangan 0.000500 Org/ Bln
Supervisor 0.000800 Org/ Bln
Clening Servis 0.004000 Org/ Bln

b Biaya Material
Sponge/ Tapas 0.004000 Buah
Mop Cotton 0.006000 Buah
Tangki Mop Cotton Alummunium 0.000500 Buah
Hand Sprayer 0.005000 Buah
Lap Kanebo 0.003000 Buah
Hand Brus Nylon 0.020000 Buah
Floor Wiper 0.004000 Buah
Ember Press 0.010000 Buah
Kop Wc 0.010000 Buah
Rak Ball Nylon 0.008000 Buah
Kape 0.008000 Buah
Lap Pel 0.010000 Lbr
Kain Manjun 0.002000 Kg
Plastik Sampah 0.001000 Lbr

c Bahan Pembersih
Pembersih Lantai 0.002000 Galon
Detergen 0.001000 Kg

d Capex
Hand Draiyer 0.001100 Unit

Total

4 An. 1 M2 Pembersihan Lantai


a Biaya Tenaga
Manager Lapangan 0.000250 Org/ Bln
Supervisor 0.000450 Org/ Bln
Clening Servis 0.003500 Org/ Bln

b Biaya Material
Sponge/ Tapas 0.000148 Buah
Floor Duster Biru 0.000837 Buah
Hand Sprayer 0.000418 Buah
Lap Kanebo 0.000418 Buah
Dust Pan Plastik 0.000418 Buah
Sapu Nylon 0.000418 Buah
Floor Wiper 0.000418 Buah
Furniture Polish Liquit 0.000650 Galon
Kemoceng 0.000790 Buah
Kain Manjun 0.000400 Buah
Plastik Sampah 0.001000 Lbr

c Bahan Pembersih
Tissu 0.004000 Kotak
Pengharum Ruangan 0.000714 Klg

d Capex
Wet & Dry Vaccum Cleaner 0.000418 Unit
Double Bucket + Pres Mop 0.000418 Unit
Kabel Roll 50 M' 0.000460 Roo

Total

5 An. 1 M2 Pembersihan dan Perawatan Taman


a Biaya Tenaga
Manager Lapangan 0.000040 Org/ Bln
Supervisor 0.000070 Org/ Bln
Clening Servis 0.000210 Org/ Bln

b Biaya Material
Skop Sampah 0.001000 Unit
NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
Gerobak Sorong 0.000500 Unit
Sapu Lidi 0.002000 Unit
Plastik Sampah 0.001000 Lbr
Peralatan Pendukung Lainya 0.001000 Ls

Total
NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4

6 An. 1 M2 Pembersihan Pelataran / Jalan / Trotoar


a Biaya Tenaga
Manager Lapangan 0.000040 Org/ Bln
Supervisor 0.000070 Org/ Bln
Clening Servis 0.000210 Org/ Bln

b Biaya Material
Skop Sampah 0.001000 Unit
Gerobak Sorong 0.000500 Unit
Sapu Lidi 0.001800 Unit
Plastik Sampah 0.001000 Lbr

Total
TUAN

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
5 6

3,021,000.00 815.67
2,071,000.00 911.24
1,520,000.00 5,016.00

109,250.00 16.17
71,250.00 59.64
1,187,500.00 496.38
104,500.00 87.47
1,520,000.00 635.36
114,000.00 47.65
23,750.00 9.93
102,125.00 42.69
13,775.00 5.76
12,825.00 5.36
33,440.00 13.98
114,000.00 47.65
128,250.00 83.36
114,950.00 90.81
74,100.00 29.64
114,000.00 22.80

166,250.00 69.83
87,875.00 351.50
120,650.00 86.14
16,625.00 34.75
107,350.00 224.36

128,250.00 53.61
213,750.00 89.35

9,347.08

3,021,000.00 1,510.50
2,071,000.00 1,656.80
1,520,000.00 5,320.00

109,250.00 16.17
23,750.00 9.93
150,100.00 156.10
137,750.00 143.26
11,115.00 11.56
114,000.00 47.65
74,100.00 29.64
11,970.00 6.22
114,950.00 90.81

120,650.00 155.64
16,625.00 34.75
107,350.00 224.36

1,140,000.00 592.80
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
5 6
308,750.00 160.55
176,700.00 91.88
211,850.00 110.16
427,500.00 222.30

10,591.09
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
5 6

3,021,000.00 1,510.50
2,071,000.00 1,656.80
1,520,000.00 6,080.00

109,250.00 437.00
104,500.00 627.00
1,520,000.00 760.00
114,000.00 570.00
23,750.00 71.25
35,625.00 712.50
12,825.00 51.30
33,440.00 334.40
15,675.00 156.75
107,350.00 858.80
114,000.00 912.00
26,125.00 261.25
74,100.00 148.20
11,970.00 11.97

166,250.00 332.50
16,625.00 16.63

164,350.00 180.79

15,689.63

3,021,000.00 755.25
2,071,000.00 931.95
1,520,000.00 5,320.00

109,250.00 16.17
71,250.00 59.64
114,000.00 47.65
23,750.00 9.93
102,125.00 42.69
13,775.00 5.76
12,825.00 5.36
128,250.00 83.36
114,950.00 90.81
74,100.00 29.64
11,970.00 11.97

87,875.00 351.50
71,250.00 50.87

128,250.00 53.61
213,750.00 89.35
332,500.00 152.95

8,108.45

3,021,000.00 120.84
2,071,000.00 144.97
1,520,000.00 319.20

16,644.00 16.64
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
5 6
194,750.00 97.38
6,175.00 12.35
11,970.00 11.97
97,375.00 97.38

820.72
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
5 6

3,021,000.00 120.84
2,071,000.00 144.97
1,520,000.00 319.20

16,644.00 16.64
194,750.00 97.38
6,175.00 11.12
11,970.00 11.97

722.11
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : Penyediaan Jasa Kebersihan Kantor
PEKERJAAN : Belanja Pemeliharaan ( Cleaning Servis )
LOKASI : Kabupaten Siak
TAHUN ANGGARAN : 2013

NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN


(Rp)
1 2 3 4 5

A. BELANJA PEMELIHARAAN (CLEANING SERVICE )


KANTOR BUPATI SIAK

I PEKERJAAN PENDAHULUAN
1 Pek. Persiapan 1.00 Ls 6,863,750.00

II PEMBERSIHAN JALAN, TROTOAR & PELATARAN


1 Pembersihan Jalan 7,561.01 M2 722.11
2 PembersihanTrotoar 3,642.10 M2 722.11
3 Pembersihan Pelataran Parkir 7,628.00 M2 722.11

III PEMBESIHAN LANTAI


1 Pembersihan Lantai Pos Satpam 130.00 M2 9,347.08
2 Pembersihan Lantai Ruangan Lantai I 1,606.42 M2 9,347.08
3 Pembersihan Lantai Ruangan Lantai II 2,609.24 M2 9,347.08
4 Pembersihan Koridor Lantai I 1,035.00 M2 8,108.45
5 Pembersihan Koridor Lantai II 2,078.08 M2 8,108.45
6 Pembersihan Selasar Lantai I 455.40 M2 8,108.45
7 Pembersihan Selasar Lantai II 255.30 M2 8,108.45
8 Pembersihan WC/ KM Lantai I 165.50 M2 15,689.63
9 Pembersihan WC/ KM Lantai II 165.50 M2 15,689.63
10 Pembersihan Lantai Tangga 137.00 M2 8,108.45

B BELANJA PEMELIHARAAN (PEMBERSIHAN DAN


PERWATAN TAMAN) KANTOR BUPATI SIAK

I PEKERJAAN PENDAHULUAN
1 Pek. Persiapan 1.00 Ls 1,463,000.00

II PEMBERSIHAN & PERAWATAN TAMAN


1 Pembersihan dan Perawatan Taman 25,450.00 M2 820.72

C BELANJA PEMELIHARAAN (CLEANING SERVICE)


KANTOR DEKRANASDA

I PEKERJAAN PENDAHULUAN
1 Pek. Persiapan 1.00 Ls 1,505,750.00

II PEMBERSIHAN JALAN, TROTOAR & PELATARAN


1 Pembersihan Jalan 1,100.00 M2 722.11
2 Pembersihan Pelataran Parkir 1,400.00 M2 722.11

III PEMBESIHAN LANTAI


1 Pembersihan Lantai Ruangan 1,500.00 M2 9,347.08
2 Pembersihan Selasar 200.00 M2 8,108.45

D. BELANJA PEMELIHARAAN (CLEANING SERVICE)


MESS PEMDA

I PEKERJAAN PENDAHULUAN
1 Pek. Persiapan 1.00 Ls 1,220,750.00

II PEMBERSIHAN & PERAWATAN TAMAN


1 Pembersihan dan Perawatan Taman 3,973.20 M2 820.72

III PEMBERSIHAN JALAN, TROTOAR & PELATARAN


1 Pembersihan Jalan 60.33 M2 722.11
2 Pembersihan Pelataran Parkir 1,434.61 M2 722.11

IV PEMBESIHAN LANTAI
1 Pembersihan Lantai Ruangan 462.25 M2 9,347.08
2 Pembersihan Lantai Ruangan Kamar 208.80 M2 9,347.08
3 Pembersihan Koridor 169.18 M2 8,108.45
E BELANJA PEMELIHARAAN (CLEANING SERVICE)
GEDUNG TENGKU MAHARATU

I PEKERJAAN PENDAHULUAN
1 Pek. Persiapan 1.00 Ls 2,636,250.00

II PEMBERSIHAN & PERAWATAN TAMAN


1 Pembersihan dan Perawatan Taman 6,055.69 M2 820.72
III PEMBERSIHAN JALAN, TROTOAR & PELATARAN
1 Pembersihan Pelataran Parkir 1,465.10 M2 722.11

IV PEMBESIHAN LANTAI
1 Pembersihan Lantai Ruangan 1,123.80 M2 9,347.08

F BELANJA PEMELIHARAAN (CLEANING SERVICE)


WORKSHOP

I PEKERJAAN PENDAHULUAN
1 Pek. Persiapan 1.00 Ls 1,596,000.00

II PEMBERSIHAN JALAN, TROTOAR & PELATARAN


1 Pembersihan Jalan 213.95 M2 722.11
2 Pembersihan Pelataran Parkir 770.90 M2 722.11

III PEMBESIHAN LANTAI


1 Pembersihan Lantai Ruangan 1,410.60 M2 9,347.08

JUMLAH (A+B+C+D+E+F) Rp
PPn 10 % Rp
TOTAL UNTUK 1 BULAN Rp
TOTAL UNTUK 9 BULAN Rp
DIBULATKAN Rp

Terbilang : Satu milyar delapan ratus lima puluh enam juta delapan ratus empat puluh empat ribu rupiah
HARGA
(Rp)
6

6,863,750.00
6,863,750.00

5,459,911.18
2,630,011.40
5,508,285.59
13,598,208.17

1,215,120.28
15,015,334.76
24,388,772.59
8,392,249.17
16,850,014.63
3,692,589.63
2,070,088.13
2,596,633.77
2,596,633.77
1,110,858.10
77,928,294.82

1,463,000.00
1,463,000.00

20,887,425.80

1,505,750.00
1,505,750.00

794,325.40
1,010,959.60
1,805,285.00

14,020,618.61
1,621,690.66
15,642,309.27

1,220,750.00
1,220,750.00

3,260,900.60
43,565.14
1,035,951.97
1,079,517.10

4,320,687.30
1,951,670.11
1,371,788.13
7,644,145.54
2,636,250.00
2,636,250.00

4,970,050.12

1,057,969.22

10,504,247.46
10,504,247.46

1,596,000.00
1,596,000.00

154,496.29
556,677.68
711,173.97

13,184,989.74
13,184,989.74

187,560,016.80
18,756,001.68
206,316,018.48
1,856,844,166.34
1,856,844,000.00