FILE: STANDARD: DoFrontF.

rpt FLS DIOE 1 04/10/2016 06/10/2016

DG KHAN Hub

DG KHAN Hub Cement

Cable Tray\ Ladder Installation

Department 194

Coal intake substation

194 Cable Tray\ Ladder Installation

80044932
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Chapter

Tray Level Specification ............................................ ........................................( 1 04/10/2016)................... 01


Tray Area Specification ............................................. ........................................( 1 04/10/2016)................... 02
Tray Type Specification ............................................. ........................................( 1 04/10/2016)................... 03
Y Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 04
C Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 05
M Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 06
W Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 07
Cable Tray & Ladder Installation .................................... ........................................( 1 04/10/2016)................... 08

Title: Document: Page:

Table of Contents 80044932 0.1


DOCONT.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Table of Contents Page


01 Tray Level Specification ..................................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 01.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 01.1

Title: Document: Page:

Tray Level Specification - Table of Contents 80044932 01.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Level Level Definition Cable Group

0 Y Y - Special Cable
1 C C - Signal Cable
2 I I - Inst. Safe
3 M M - Control Cable
4 W W - Power Cable
5 H H - High Tens. Cable
6
7
8
9

Title: Document: Page:

Tray Level Specification - List 80044932 01.1


(PLTLAYSB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Table of Contents Page


02 Tray Area Specification ...................................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 02.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 02.1

Title: Document: Page:

Tray Area Specification - Table of Contents 80044932 02.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Area ID Area Description X0 Y0 Z0 X1 Y1


(m) (m) (m) (m) (m)

051 Main Cable Route 0.00 0.00 0.00 100.00 0.00

111 Limestone crusher 0.00 0.00 0.00 100.00 0.00

112 Clay/Bauxite/Gypsum/Puz CR 0.00 0.00 0.00 100.00 0.00

121 Limestone transport 0.00 0.00 0.00 100.00 0.00

131 Lime stone additive storage 0.00 0.00 0.00 100.00 0.00

143 Additive transport from stora 0.00 0.00 0.00 100.00 0.00

191 Limestone Crushing SS 0.00 0.00 0.00 100.00 0.00

193 Limestone storage SS 0.00 0.00 0.00 100.00 0.00

194 Coal Intake SS 0.00 0.00 0.00 100.00 0.00

211 Coal intake and crusher 0.00 0.00 0.00 100.00 0.00

231 Coal storage 0.00 0.00 0.00 100.00 0.00

291 Gypsum Crusher SS 0.00 0.00 0.00 100.00 0.00

331 Exhaust gas conditioning 0.00 0.00 0.00 100.00 0.00

341 Raw meal silo/ Kiln feed 0.00 0.00 0.00 100.00 0.00

421 Cyclone preheater & Kiln 0.00 0.00 0.00 100.00 0.00

441 Clinker cooler 0.00 0.00 0.00 100.00 0.00

465 Blower Room 0.00 0.00 0.00 100.00 0.00

471 Clinker transport to storage 0.00 0.00 0.00 100.00 0.00

481 Clinker storage and transport 0.00 0.00 0.00 100.00 0.00

491 Sub-station for Kiln 0.00 0.00 0.00 100.00 0.00

492 Sub-station for Cooler 0.00 0.00 0.00 100.00 0.00

711 Oil intake/Unloading and stora 0.00 0.00 0.00 100.00 0.00

741 Compressor room 0.00 0.00 0.00 100.00 0.00

Title: Document: Page:

Tray Area Specification - List 80044932 02.1


(PLAREALB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Area ID Area Description X0 Y0 Z0 X1 Y1


(m) (m) (m) (m) (m)

762 Water Dist, Pump and Cool sys 0.00 0.00 0.00 100.00 0.00

791 Substation For Utilities 0.00 0.00 0.00 100.00 0.00

801 AUX & CCR Dept 0.00 0.00 0.00 100.00 0.00

891 Main Substation 0.00 0.00 0.00 100.00 0.00

Title: Document: Page:

Tray Area Specification - List 80044932 02.2


(PLAREALB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Table of Contents Page


03 Tray Type Specification ...................................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 03.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 03.1

Title: Document: Page:

Tray Type Specification - Table of Contents 80044932 03.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

194-1-0001 - 194-1-0002 TWDS 194 DEPT 5.30 180 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW

194-1-0001 - 194-1-0013 TWDS 194 DEPT 6.30 0 0 300 THBC 100 THBM 200 LHBW

194-1-0002 - 194-1-0003 TO 101LG400X05/EX11B 1.76 90 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW

194-1-0002 - 194-1-0035 TWDS 194SJ990A01 1.55 -90 0 200 LHBW

194-1-0003 - 194-1-0004 TWDS 401CS320A01/A02 1.11 90 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW

194-1-0004 - 194-1-0005 TWDS 401CS320A01/A02 0.33 178 0 100 THBY 100 THBM 200 LHBW

194-1-0004 - 194-1-0006 TWDS 101LG400A01 1.38 90 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW

194-1-0005 - 194-2-0003 TWDS 401CS320A01/A02 2.42 0 90 100 TRBY 100 TRBM 200 LRBW

194-1-0006 - 194-1-0007 TO 101LG400A01 3.55 0 0 100 THBY 300 THBM 600 LHBW

194-1-0006 - 194-1-0022 TWDS 194 DEPT 4.25 90 0 100 THBY 300 THBC 300 THBM 600 (x2) LHBW

194-1-0007 - 194-1-0037 TO 194UP110G02 1.75 0 0 100 THBY 100 THBM 300 LHBW

194-1-0008 - 194-1-0012 TWDS 401CS310A01 2.50 0 0 300 THBC 100 THBM 300 LHBW

194-1-0010 - 194-1-0011 TO 211AF060U01/U02, 0.92 0 0 100 THBY 100 THBC 100 THBM 300 LHBW
211SH062U0

194-1-0011 - 194-1-0008 TO 401CS310A01 2.25 0 0 100 THBY 100 THBC 100 THBM 300 LHBW

194-1-0012 - 194-1-0013 TWDS 194 DEPT 4.25 -90 0 300 THBC 100 THBM 200 LHBW

194-1-0012 - 194-1-0014 TWDS 101LV400T01-SEC 2.95 90 0 100 THBC 100 THBM 300 LHBW

194-1-0014 - 194-1-0015 TWDS 101LV400T01-SEC 1.27 0 90 100 THBM 300 LHBW

194-1-0014 - 194-1-0020 TWDS 101LV400-BA01 1.30 90 0 100 THBC 600 LHBW

194-1-0015 - 194-1-0016 TWDS 101LV400T01-SEC 2.60 0 0 100 TRBM 300 LRBW

194-1-0016 - 194-1-0017 TWDS 101LV400T01-SEC 0.57 90 0 300 LRBW

194-1-0016 - 194-1-0018 TWDS 101LG400X09/EX13 0.30 -90 0 100 TRBM 200 LRBW

194-1-0017 - 194-2-0002 TO 101LV400T01-SEC 3.55 0 90 300 LRBW

194-1-0018 - 194-1-0019 TWDS 101LG400X09/EX13 1.40 0 0 100 TRBM 200 LRBW

194-1-0019 - 194-2-0017 TO 101LG400X09/EX13 2.35 0 90 100 TRBM 200 LRBW

194-1-0020 - 194-1-0027 TWDS 101LV400T01-PRI 0.60 90 0 100 TRBC 100 TRBM 300 LRBW

194-1-0020 - 194-1-0034 TO 101LV400-BA02 5.55 180 0 100 TRBC 100 TRBM 200 LRBW

Title: Document: Page:


Tray Type Specification - List 80044932 03.1
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

194-1-0021 - 194-1-0033 TO 101LV400BA04 1.00 180 0 100 TRBC 100 TRBM 200 LRBW

194-1-0022 - 194-1-0023 TWDS 194 DEPT 0.60 90 0 100 THBY 300 THBC 300 THBM 600 (x2) LHBW

194-1-0023 - 194-1-0032 TO 101LV400-FA04 4.05 0 0 100 THBY 300 THBC 600 (x2) LHBW

194-1-0024 - 194-1-0025 TO 101LV400-FA02 1.00 0 0 100 THBY 100 THBC 600 LHBW

194-1-0025 - 194-1-0026 TO 101LV400-FA01 1.00 0 0 100 THBY

194-1-0026 - 194-1-0027 TWDS 101LV400T01-PRI 4.55 0 0 100 THBC 100 THBM 300 LHBW

194-1-0032 - 194-1-0024 TO 101LV400-FA03 1.00 0 0 100 THBY 100 THBC 600 (x2) LHBW

194-1-0033 - 194-1-0022 TWDS 101LV300FA04 4.05 180 0 100 TRBC 100 TRBM 200 LRBW

194-1-0034 - 194-1-0021 TO 101LV400-BA03 1.00 180 0 100 TRBC 100 TRBM 200 LRBW

194-1-0035 - 194-1-0036 TO 194SJ990A01 3.00 0 -90 200 LHBW

194-1-0037 - 194-1-0010 TO 194UP110G01 0.62 0 0 100 THBY 100 THBC 100 THBM 300 LHBW

194-2-0003 - 194-2-0004 TWDS 401CS320A01/A02 0.93 89 0 100 TRBY 100 TRBM 200 LRBW

194-2-0003 - 194-2-0010 TWDS 101LG400X04 3.70 0 90 100 TRBM

194-2-0004 - 194-2-0005 TO 401CS320A01/A02 1.20 0 90 100 TRBY 100 TRBM

194-2-0004 - 194-2-0006 TWDS 101LG400X07/X08 1.39 90 0 100 TRBM 200 LRBW

194-2-0006 - 194-2-0007 TO 101LG400X07/X08 1.20 0 90 100 TRBM 200 LRBW

194-2-0007 - 194-2-0008 TO 101LG400EX04/EX11A 2.50 0 90 100 TRBM

194-2-0008 - 194-2-0009 TO 101LG400X06 0.77 180 0 100 TRBM

194-2-0010 - 194-2-0011 TO 101LG400X04 0.99 -89 0 100 TRBM

194-2-0011 - 194-2-0012 TWDS 101LG400EX05 3.41 -90 0 100 TRBM

194-2-0012 - 194-2-0013 TWDS 101LG400EX05 15.21 0 0 100 TRBM

194-2-0013 - 194-2-0014 TO 101LG400EX05 2.50 0 -90 100 TRBM

194-2-0013 - 194-2-0015 TWDS 101LG400EX03 0.93 0 0 100 TRBM

194-2-0015 - 194-2-0016 TO 101LG400EX03 0.78 -90 0 100 TRBM

Title: Document: Page:


Tray Type Specification - List 80044932 03.2
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Table of Contents Page


04 Y Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 04.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 04.1

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - Table of Contents 80044932 04.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

194-1-0001 - 194-1-0002 TWDS 194 DEPT 100 THBY 5.30 0,0 0,370 6 2

194-1-0002 - 194-1-0003 TO 101LG400X05/EX11B 100 THBY 1.76 0,0 0,370 6 2

194-1-0003 - 194-1-0004 TWDS 401CS320A01/A02 100 THBY 1.11 0,0 0,370 6 2

194-1-0004 - 194-1-0005 TWDS 401CS320A01/A02 100 THBY 0.33 0,0 0,690 12 6

194-1-0004 - 194-1-0006 TWDS 101LG400A01 100 THBY 1.38 0,0 1,060 18 8

194-1-0005 - 194-2-0003 TWDS 401CS320A01/A02 100 TRBY 2.42 90,0 0,690 12 6

194-1-0006 - 194-1-0007 TO 101LG400A01 100 THBY 3.55 0,0 0,345 6 3

194-1-0006 - 194-1-0022 TWDS 194 DEPT 100 THBY 4.25 0,0 1,085 18 7

194-1-0007 - 194-1-0037 TO 194UP110G02 100 THBY 1.75 0,0 0,345 6 3

194-1-0010 - 194-1-0011 TO 211AF060U01/U02, 211SH062U0 100 THBY 0.92 0,0 0,345 6 3

194-1-0011 - 194-1-0008 TO 401CS310A01 100 THBY 2.25 0,0 0,185 3 1

194-1-0022 - 194-1-0023 TWDS 194 DEPT 100 THBY 0.60 0,0 1,085 18 7

194-1-0023 - 194-1-0032 TO 101LV400-FA04 100 THBY 4.05 0,0 0,160 3 2

194-1-0024 - 194-1-0025 TO 101LV400-FA02 100 THBY 1.00 0,0 0,160 3 2

194-1-0025 - 194-1-0026 TO 101LV400-FA01 100 THBY 1.00 0,0 0,160 3 2

194-1-0032 - 194-1-0024 TO 101LV400-FA03 100 THBY 1.00 0,0 0,160 3 2

194-1-0037 - 194-1-0010 TO 194UP110G01 100 THBY 0.62 0,0 0,345 6 3

194-2-0003 - 194-2-0004 TWDS 401CS320A01/A02 100 TRBY 0.93 0,0 0,690 12 6

194-2-0004 - 194-2-0005 TO 401CS320A01/A02 100 TRBY 1.20 90,0 0,690 12 6

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - List 80044932 04.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Table of Contents Page


05 C Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 05.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 05.1

Title: Document: Page:

C Tray Segment Quantities & Fill Area - Table of Contents 80044932 05.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

194-1-0001 - 194-1-0002 TWDS 194 DEPT 300 THBC 5.30 0,0 3,427 21 29

194-1-0001 - 194-1-0013 TWDS 194 DEPT 300 THBC 6.30 0,0 5,678 32 64

194-1-0002 - 194-1-0003 TO 101LG400X05/EX11B 300 THBC 1.76 0,0 3,427 21 29

194-1-0003 - 194-1-0004 TWDS 401CS320A01/A02 300 THBC 1.11 0,0 3,427 21 29

194-1-0004 - 194-1-0006 TWDS 101LG400A01 300 THBC 1.38 0,0 3,427 21 29

194-1-0006 - 194-1-0022 TWDS 194 DEPT 300 THBC 4.25 0,0 3,427 21 29

194-1-0008 - 194-1-0012 TWDS 401CS310A01 300 THBC 2.50 0,0 6,629 37 75

194-1-0010 - 194-1-0011 TO 211AF060U01/U02, 211SH062U0 100 THBC 0.92 0,0 0,057 1 1

194-1-0011 - 194-1-0008 TO 401CS310A01 100 THBC 2.25 0,0 0,894 15 10

194-1-0012 - 194-1-0013 TWDS 194 DEPT 300 THBC 4.25 0,0 5,678 32 64

194-1-0012 - 194-1-0014 TWDS 101LV400T01-SEC 100 THBC 2.95 0,0 0,951 15 11

194-1-0014 - 194-1-0020 TWDS 101LV400-BA01 100 THBC 1.30 0,0 0,894 15 10

194-1-0020 - 194-1-0027 TWDS 101LV400T01-PRI 100 TRBC 0.60 0,0 0,057 1 1

194-1-0020 - 194-1-0034 TO 101LV400-BA02 100 TRBC 5.55 0,0 0,837 14 9

194-1-0021 - 194-1-0033 TO 101LV400BA04 100 TRBC 1.00 0,0 0,337 6 3

194-1-0022 - 194-1-0023 TWDS 194 DEPT 300 THBC 0.60 0,0 3,090 19 26

194-1-0023 - 194-1-0032 TO 101LV400-FA04 300 THBC 4.05 0,0 3,090 19 26

194-1-0024 - 194-1-0025 TO 101LV400-FA02 100 THBC 1.00 0,0 1,265 24 11

194-1-0026 - 194-1-0027 TWDS 101LV400T01-PRI 100 THBC 4.55 0,0 0,057 1 1

194-1-0032 - 194-1-0024 TO 101LV400-FA03 100 THBC 1.00 0,0 2,070 39 18

194-1-0033 - 194-1-0022 TWDS 101LV300FA04 100 TRBC 4.05 0,0 0,337 6 3

194-1-0034 - 194-1-0021 TO 101LV400-BA03 100 TRBC 1.00 0,0 0,451 8 5

194-1-0037 - 194-1-0010 TO 194UP110G01 100 THBC 0.62 0,0 0,057 1 1

Title: Document: Page:

C Tray Segment Quantities & Fill Area - List 80044932 05.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Table of Contents Page


06 M Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 06.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 06.1

Title: Document: Page:

M Tray Segment Quantities & Fill Area - Table of Contents 80044932 06.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

194-1-0001 - 194-1-0002 TWDS 194 DEPT 300 THBM 5.30 0,0 4,500 21 22

194-1-0001 - 194-1-0013 TWDS 194 DEPT 100 THBM 6.30 0,0 3,185 40 17

194-1-0002 - 194-1-0003 TO 101LG400X05/EX11B 300 THBM 1.76 0,0 4,500 21 22

194-1-0003 - 194-1-0004 TWDS 401CS320A01/A02 300 THBM 1.11 0,0 4,918 23 24

194-1-0004 - 194-1-0005 TWDS 401CS320A01/A02 100 THBM 0.33 0,0 2,172 26 9

194-1-0004 - 194-1-0006 TWDS 101LG400A01 300 THBM 1.38 0,0 7,090 32 33

194-1-0005 - 194-2-0003 TWDS 401CS320A01/A02 100 TRBM 2.42 90,0 2,172 26 9

194-1-0006 - 194-1-0007 TO 101LG400A01 300 THBM 3.55 0,0 9,227 46 32

194-1-0006 - 194-1-0022 TWDS 194 DEPT 300 THBM 4.25 0,0 7,387 36 29

194-1-0007 - 194-1-0037 TO 194UP110G02 100 THBM 1.75 0,0 0,075 2 1

194-1-0008 - 194-1-0012 TWDS 401CS310A01 100 THBM 2.50 0,0 3,260 42 18

194-1-0010 - 194-1-0011 TO 211AF060U01/U02, 211SH062U0 100 THBM 0.92 0,0 0,075 2 1

194-1-0011 - 194-1-0008 TO 401CS310A01 100 THBM 2.25 0,0 0,075 2 1

194-1-0012 - 194-1-0013 TWDS 194 DEPT 100 THBM 4.25 0,0 3,185 40 17

194-1-0012 - 194-1-0014 TWDS 101LV400T01-SEC 100 THBM 2.95 0,0 0,075 2 1

194-1-0014 - 194-1-0015 TWDS 101LV400T01-SEC 100 THBM 1.27 90,0 0,075 2 1

194-1-0015 - 194-1-0016 TWDS 101LV400T01-SEC 100 TRBM 2.60 0,0 0,075 2 1

194-1-0016 - 194-1-0018 TWDS 101LG400X09/EX13 100 TRBM 0.30 0,0 0,075 2 1

194-1-0018 - 194-1-0019 TWDS 101LG400X09/EX13 100 TRBM 1.40 0,0 0,075 2 1

194-1-0019 - 194-2-0017 TO 101LG400X09/EX13 100 TRBM 2.35 90,0 0,075 2 1

194-1-0020 - 194-1-0027 TWDS 101LV400T01-PRI 100 TRBM 0.60 0,0 0,350 4 2

194-1-0020 - 194-1-0034 TO 101LV400-BA02 100 TRBM 5.55 0,0 0,350 4 2

194-1-0021 - 194-1-0033 TO 101LV400BA04 100 TRBM 1.00 0,0 2,625 32 15

194-1-0022 - 194-1-0023 TWDS 194 DEPT 300 THBM 0.60 0,0 4,762 25 14

194-1-0026 - 194-1-0027 TWDS 101LV400T01-PRI 100 THBM 4.55 0,0 0,350 4 2

194-1-0033 - 194-1-0022 TWDS 101LV300FA04 100 TRBM 4.05 0,0 2,625 32 15

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044932 06.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

194-1-0034 - 194-1-0021 TO 101LV400-BA03 100 TRBM 1.00 0,0 1,050 13 6

194-1-0037 - 194-1-0010 TO 194UP110G01 100 THBM 0.62 0,0 0,075 2 1

194-2-0003 - 194-2-0004 TWDS 401CS320A01/A02 100 TRBM 0.93 0,0 1,486 18 6

194-2-0003 - 194-2-0010 TWDS 101LG400X04 100 TRBM 3.70 90,0 0,686 8 3

194-2-0004 - 194-2-0005 TO 401CS320A01/A02 100 TRBM 1.20 90,0 0,350 4 2

194-2-0004 - 194-2-0006 TWDS 101LG400X07/X08 100 TRBM 1.39 0,0 1,136 14 4

194-2-0006 - 194-2-0007 TO 101LG400X07/X08 100 TRBM 1.20 90,0 1,136 14 4

194-2-0007 - 194-2-0008 TO 101LG400EX04/EX11A 100 TRBM 2.50 90,0 0,936 11 3

194-2-0008 - 194-2-0009 TO 101LG400X06 100 TRBM 0.77 0,0 0,500 5 1

194-2-0010 - 194-2-0011 TO 101LG400X04 100 TRBM 0.99 0,0 0,686 8 3

194-2-0011 - 194-2-0012 TWDS 101LG400EX05 100 TRBM 3.41 0,0 0,436 5 2

194-2-0012 - 194-2-0013 TWDS 101LG400EX05 100 TRBM 15.21 0,0 0,436 5 2

194-2-0013 - 194-2-0014 TO 101LG400EX05 100 TRBM 2.50 -90,0 0,218 3 1

194-2-0013 - 194-2-0015 TWDS 101LG400EX03 100 TRBM 0.93 0,0 0,218 3 1

194-2-0015 - 194-2-0016 TO 101LG400EX03 100 TRBM 0.78 0,0 0,218 3 1

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044932 06.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Table of Contents Page


07 W Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 07.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 07.1

Title: Document: Page:

W Tray Segment Quantities & Fill Area - Table of Contents 80044932 07.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

194-1-0001 - 194-1-0002 TWDS 194 DEPT 600 (x3) LHBW 5.30 0,0 76,315 50 41

194-1-0001 - 194-1-0013 TWDS 194 DEPT 200 LHBW 6.30 0,0 3,910 34 3

194-1-0002 - 194-1-0003 TO 101LG400X05/EX11B 600 (x3) LHBW 1.76 0,0 80,925 53 43

194-1-0002 - 194-1-0035 TWDS 194SJ990A01 200 LHBW 1.55 0,0 0,640 6 1

194-1-0003 - 194-1-0004 TWDS 401CS320A01/A02 600 (x3) LHBW 1.11 0,0 80,925 53 43

194-1-0004 - 194-1-0005 TWDS 401CS320A01/A02 200 LHBW 0.33 0,0 0,610 6 1

194-1-0004 - 194-1-0006 TWDS 101LG400A01 600 (x3) LHBW 1.38 0,0 81,125 53 44

194-1-0005 - 194-2-0003 TWDS 401CS320A01/A02 200 LRBW 2.42 90,0 0,610 6 1

194-1-0006 - 194-1-0007 TO 101LG400A01 600 LHBW 3.55 0,0 25,266 62 17

194-1-0006 - 194-1-0022 TWDS 194 DEPT 600 (x2) LHBW 4.25 0,0 67,731 70 39

194-1-0007 - 194-1-0037 TO 194UP110G02 300 LHBW 1.75 0,0 3,316 15 2

194-1-0008 - 194-1-0012 TWDS 401CS310A01 300 LHBW 2.50 0,0 7,330 71 13

194-1-0010 - 194-1-0011 TO 211AF060U01/U02, 211SH062U0 300 LHBW 0.92 0,0 0,730 9 2

194-1-0011 - 194-1-0008 TO 401CS310A01 300 LHBW 2.25 0,0 6,330 51 8

194-1-0012 - 194-1-0013 TWDS 194 DEPT 200 LHBW 4.25 0,0 3,910 34 3

194-1-0012 - 194-1-0014 TWDS 101LV400T01-SEC 300 LHBW 2.95 0,0 3,830 49 10

194-1-0014 - 194-1-0015 TWDS 101LV400T01-SEC 300 LHBW 1.27 90,0 27,150 68 12

194-1-0014 - 194-1-0020 TWDS 101LV400-BA01 600 LHBW 1.30 0,0 30,580 54 20

194-1-0015 - 194-1-0016 TWDS 101LV400T01-SEC 300 LRBW 2.60 0,0 27,150 68 12

194-1-0016 - 194-1-0017 TWDS 101LV400T01-SEC 300 LRBW 0.57 0,0 26,950 64 11

194-1-0016 - 194-1-0018 TWDS 101LG400X09/EX13 200 LRBW 0.30 0,0 0,610 6 1

194-1-0017 - 194-2-0002 TO 101LV400T01-SEC 300 LRBW 3.55 90,0 26,950 64 11

194-1-0018 - 194-1-0019 TWDS 101LG400X09/EX13 200 LRBW 1.40 0,0 0,610 6 1

194-1-0019 - 194-2-0017 TO 101LG400X09/EX13 200 LRBW 2.35 90,0 0,610 6 1

194-1-0020 - 194-1-0027 TWDS 101LV400T01-PRI 300 LRBW 0.60 0,0 26,950 64 11

194-1-0020 - 194-1-0034 TO 101LV400-BA02 200 LRBW 5.55 0,0 4,040 68 9

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044932 07.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

194-1-0021 - 194-1-0033 TO 101LV400BA04 200 LRBW 1.00 0,0 4,280 24 2

194-1-0022 - 194-1-0023 TWDS 194 DEPT 600 (x2) LHBW 0.60 0,0 63,861 66 37

194-1-0023 - 194-1-0032 TO 101LV400-FA04 600 (x2) LHBW 4.05 0,0 59,545 60 33

194-1-0024 - 194-1-0025 TO 101LV400-FA02 600 LHBW 1.00 0,0 13,640 39 12

194-1-0026 - 194-1-0027 TWDS 101LV400T01-PRI 300 LHBW 4.55 0,0 26,950 64 11

194-1-0032 - 194-1-0024 TO 101LV400-FA03 600 (x2) LHBW 1.00 0,0 43,430 40 22

194-1-0033 - 194-1-0022 TWDS 101LV300FA04 200 LRBW 4.05 0,0 4,280 24 2

194-1-0034 - 194-1-0021 TO 101LV400-BA03 200 LRBW 1.00 0,0 5,080 49 6

194-1-0035 - 194-1-0036 TO 194SJ990A01 200 LHBW 3.00 -90,0 0,640 6 1

194-1-0037 - 194-1-0010 TO 194UP110G01 300 LHBW 0.62 0,0 3,934 22 5

194-2-0003 - 194-2-0004 TWDS 401CS320A01/A02 200 LRBW 0.93 0,0 0,610 6 1

194-2-0004 - 194-2-0006 TWDS 101LG400X07/X08 200 LRBW 1.39 0,0 0,610 6 1

194-2-0006 - 194-2-0007 TO 101LG400X07/X08 200 LRBW 1.20 90,0 0,610 6 1

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044932 07.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Table of Contents Page


08 Cable Tray & Ladder Installation ............................................................. .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 08.0.1
Cable Tray & Ladder Code .................................................................... .................................. ( 1 04/10/2016)..... 08.1
Routing Symbols & Cable Code ................................................................ .................................. ( 1 04/10/2016)..... 08.2
Guidelines for Node Numbers ................................................................. .................................. ( 1 04/10/2016)..... 08.3
Guidelines for Laying Cables ................................................................ .................................. ( 1 04/10/2016)..... 08.4

Title: Document: Page:

Cable Tray & Ladder Installation - Table of Contents 80044932 08.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Cable Tray & Ladder Code 80044932 08.1
PIC1_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Routing Symbols & Cable Code 80044932 08.2
PIC2_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Guidelines for Node Numbers 80044932 08.3
PIC3_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Guidelines for Laying Cables 80044932 08.4
PIC4_UK_B.RPT