194-80044932 A4-P 1.0 en
194-80044932 A4-P 1.0 en
DG KHAN Hub
Department 194
80044932
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE
Chapter
0 Y Y - Special Cable
1 C C - Signal Cable
2 I I - Inst. Safe
3 M M - Control Cable
4 W W - Power Cable
5 H H - High Tens. Cable
6
7
8
9
131 Lime stone additive storage 0.00 0.00 0.00 100.00 0.00
143 Additive transport from stora 0.00 0.00 0.00 100.00 0.00
211 Coal intake and crusher 0.00 0.00 0.00 100.00 0.00
341 Raw meal silo/ Kiln feed 0.00 0.00 0.00 100.00 0.00
421 Cyclone preheater & Kiln 0.00 0.00 0.00 100.00 0.00
481 Clinker storage and transport 0.00 0.00 0.00 100.00 0.00
711 Oil intake/Unloading and stora 0.00 0.00 0.00 100.00 0.00
762 Water Dist, Pump and Cool sys 0.00 0.00 0.00 100.00 0.00
801 AUX & CCR Dept 0.00 0.00 0.00 100.00 0.00
Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane
194-1-0001 - 194-1-0002 TWDS 194 DEPT 5.30 180 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW
194-1-0001 - 194-1-0013 TWDS 194 DEPT 6.30 0 0 300 THBC 100 THBM 200 LHBW
194-1-0002 - 194-1-0003 TO 101LG400X05/EX11B 1.76 90 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW
194-1-0003 - 194-1-0004 TWDS 401CS320A01/A02 1.11 90 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW
194-1-0004 - 194-1-0005 TWDS 401CS320A01/A02 0.33 178 0 100 THBY 100 THBM 200 LHBW
194-1-0004 - 194-1-0006 TWDS 101LG400A01 1.38 90 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW
194-1-0005 - 194-2-0003 TWDS 401CS320A01/A02 2.42 0 90 100 TRBY 100 TRBM 200 LRBW
194-1-0006 - 194-1-0007 TO 101LG400A01 3.55 0 0 100 THBY 300 THBM 600 LHBW
194-1-0006 - 194-1-0022 TWDS 194 DEPT 4.25 90 0 100 THBY 300 THBC 300 THBM 600 (x2) LHBW
194-1-0007 - 194-1-0037 TO 194UP110G02 1.75 0 0 100 THBY 100 THBM 300 LHBW
194-1-0008 - 194-1-0012 TWDS 401CS310A01 2.50 0 0 300 THBC 100 THBM 300 LHBW
194-1-0010 - 194-1-0011 TO 211AF060U01/U02, 0.92 0 0 100 THBY 100 THBC 100 THBM 300 LHBW
211SH062U0
194-1-0011 - 194-1-0008 TO 401CS310A01 2.25 0 0 100 THBY 100 THBC 100 THBM 300 LHBW
194-1-0012 - 194-1-0013 TWDS 194 DEPT 4.25 -90 0 300 THBC 100 THBM 200 LHBW
194-1-0012 - 194-1-0014 TWDS 101LV400T01-SEC 2.95 90 0 100 THBC 100 THBM 300 LHBW
194-1-0016 - 194-1-0018 TWDS 101LG400X09/EX13 0.30 -90 0 100 TRBM 200 LRBW
194-1-0020 - 194-1-0027 TWDS 101LV400T01-PRI 0.60 90 0 100 TRBC 100 TRBM 300 LRBW
194-1-0020 - 194-1-0034 TO 101LV400-BA02 5.55 180 0 100 TRBC 100 TRBM 200 LRBW
Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane
194-1-0021 - 194-1-0033 TO 101LV400BA04 1.00 180 0 100 TRBC 100 TRBM 200 LRBW
194-1-0022 - 194-1-0023 TWDS 194 DEPT 0.60 90 0 100 THBY 300 THBC 300 THBM 600 (x2) LHBW
194-1-0023 - 194-1-0032 TO 101LV400-FA04 4.05 0 0 100 THBY 300 THBC 600 (x2) LHBW
194-1-0024 - 194-1-0025 TO 101LV400-FA02 1.00 0 0 100 THBY 100 THBC 600 LHBW
194-1-0026 - 194-1-0027 TWDS 101LV400T01-PRI 4.55 0 0 100 THBC 100 THBM 300 LHBW
194-1-0032 - 194-1-0024 TO 101LV400-FA03 1.00 0 0 100 THBY 100 THBC 600 (x2) LHBW
194-1-0033 - 194-1-0022 TWDS 101LV300FA04 4.05 180 0 100 TRBC 100 TRBM 200 LRBW
194-1-0034 - 194-1-0021 TO 101LV400-BA03 1.00 180 0 100 TRBC 100 TRBM 200 LRBW
194-1-0037 - 194-1-0010 TO 194UP110G01 0.62 0 0 100 THBY 100 THBC 100 THBM 300 LHBW
194-2-0003 - 194-2-0004 TWDS 401CS320A01/A02 0.93 89 0 100 TRBY 100 TRBM 200 LRBW
Y Tray Segment Quantities & Fill Area - Table of Contents 80044932 04.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE
Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)
194-1-0001 - 194-1-0002 TWDS 194 DEPT 100 THBY 5.30 0,0 0,370 6 2
194-1-0006 - 194-1-0022 TWDS 194 DEPT 100 THBY 4.25 0,0 1,085 18 7
194-1-0022 - 194-1-0023 TWDS 194 DEPT 100 THBY 0.60 0,0 1,085 18 7
C Tray Segment Quantities & Fill Area - Table of Contents 80044932 05.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE
Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)
194-1-0001 - 194-1-0002 TWDS 194 DEPT 300 THBC 5.30 0,0 3,427 21 29
194-1-0001 - 194-1-0013 TWDS 194 DEPT 300 THBC 6.30 0,0 5,678 32 64
194-1-0006 - 194-1-0022 TWDS 194 DEPT 300 THBC 4.25 0,0 3,427 21 29
194-1-0012 - 194-1-0013 TWDS 194 DEPT 300 THBC 4.25 0,0 5,678 32 64
194-1-0022 - 194-1-0023 TWDS 194 DEPT 300 THBC 0.60 0,0 3,090 19 26
M Tray Segment Quantities & Fill Area - Table of Contents 80044932 06.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE
Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)
194-1-0001 - 194-1-0002 TWDS 194 DEPT 300 THBM 5.30 0,0 4,500 21 22
194-1-0001 - 194-1-0013 TWDS 194 DEPT 100 THBM 6.30 0,0 3,185 40 17
194-1-0006 - 194-1-0022 TWDS 194 DEPT 300 THBM 4.25 0,0 7,387 36 29
194-1-0012 - 194-1-0013 TWDS 194 DEPT 100 THBM 4.25 0,0 3,185 40 17
194-1-0022 - 194-1-0023 TWDS 194 DEPT 300 THBM 0.60 0,0 4,762 25 14
Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)
W Tray Segment Quantities & Fill Area - Table of Contents 80044932 07.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE
Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)
194-1-0001 - 194-1-0002 TWDS 194 DEPT 600 (x3) LHBW 5.30 0,0 76,315 50 41
194-1-0001 - 194-1-0013 TWDS 194 DEPT 200 LHBW 6.30 0,0 3,910 34 3
194-1-0003 - 194-1-0004 TWDS 401CS320A01/A02 600 (x3) LHBW 1.11 0,0 80,925 53 43
194-1-0004 - 194-1-0006 TWDS 101LG400A01 600 (x3) LHBW 1.38 0,0 81,125 53 44
194-1-0006 - 194-1-0022 TWDS 194 DEPT 600 (x2) LHBW 4.25 0,0 67,731 70 39
194-1-0012 - 194-1-0013 TWDS 194 DEPT 200 LHBW 4.25 0,0 3,910 34 3
Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)
194-1-0022 - 194-1-0023 TWDS 194 DEPT 600 (x2) LHBW 0.60 0,0 63,861 66 37
Cable Tray & Ladder Installation - Cable Tray & Ladder Code 80044932 08.1
PIC1_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE
Cable Tray & Ladder Installation - Routing Symbols & Cable Code 80044932 08.2
PIC2_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE
Cable Tray & Ladder Installation - Guidelines for Node Numbers 80044932 08.3
PIC3_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 194 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Coal intake substation Init. DIOE
Cable Tray & Ladder Installation - Guidelines for Laying Cables 80044932 08.4
PIC4_UK_B.RPT