FILE: STANDARD: DoFrontF.

rpt FLS DIOE 1 04/10/2016 06/10/2016

DG KHAN Hub

DG KHAN Hub Cement

Cable Tray\ Ladder Installation

Department 492

Cooler substation

492 Cable Tray\ Ladder Installation

80044935
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Chapter

Tray Level Specification ............................................ ........................................( 1 04/10/2016)................... 01


Tray Area Specification ............................................. ........................................( 1 04/10/2016)................... 02
Tray Type Specification ............................................. ........................................( 1 04/10/2016)................... 03
Y Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 04
C Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 05
M Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 06
W Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 07
H Tray Segment Quantities & Fill Area ............................... ........................................( 1 04/10/2016)................... 08
Cable Tray & Ladder Installation .................................... ........................................( 1 04/10/2016)................... 09

Title: Document: Page:

Table of Contents 80044935 0.1


DOCONT.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Table of Contents Page


01 Tray Level Specification ..................................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 01.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 01.1

Title: Document: Page:

Tray Level Specification - Table of Contents 80044935 01.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Level Level Definition Cable Group

0 Y Y - Special Cable
1 C C - Signal Cable
2 I I - Inst. Safe
3 M M - Control Cable
4 W W - Power Cable
5 H H - High Tens. Cable
6
7
8
9

Title: Document: Page:

Tray Level Specification - List 80044935 01.1


(PLTLAYSB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Table of Contents Page


02 Tray Area Specification ...................................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 02.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 02.1

Title: Document: Page:

Tray Area Specification - Table of Contents 80044935 02.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Area ID Area Description X0 Y0 Z0 X1 Y1


(m) (m) (m) (m) (m)

051 Main Cable Route 0.00 0.00 0.00 100.00 0.00

111 Limestone crusher 0.00 0.00 0.00 100.00 0.00

112 Clay/Bauxite/Gypsum/Puz CR 0.00 0.00 0.00 100.00 0.00

121 Limestone transport 0.00 0.00 0.00 100.00 0.00

131 Lime stone additive storage 0.00 0.00 0.00 100.00 0.00

143 Additive transport from stora 0.00 0.00 0.00 100.00 0.00

191 Limestone Crushing SS 0.00 0.00 0.00 100.00 0.00

193 Limestone storage SS 0.00 0.00 0.00 100.00 0.00

194 Coal Intake SS 0.00 0.00 0.00 100.00 0.00

211 Coal intake and crusher 0.00 0.00 0.00 100.00 0.00

231 Coal storage 0.00 0.00 0.00 100.00 0.00

291 Gypsum Crusher SS 0.00 0.00 0.00 100.00 0.00

331 Exhaust gas conditioning 0.00 0.00 0.00 100.00 0.00

341 Raw meal silo/ Kiln feed 0.00 0.00 0.00 100.00 0.00

421 Cyclone preheater & Kiln 0.00 0.00 0.00 100.00 0.00

441 Clinker cooler 0.00 0.00 0.00 100.00 0.00

465 Blower Room 0.00 0.00 0.00 100.00 0.00

471 Clinker transport to storage 0.00 0.00 0.00 100.00 0.00

481 Clinker storage and transport 0.00 0.00 0.00 100.00 0.00

491 Sub-station for Kiln 0.00 0.00 0.00 100.00 0.00

492 Sub-station for Cooler 0.00 0.00 0.00 100.00 0.00

711 Oil intake/Unloading and stora 0.00 0.00 0.00 100.00 0.00

741 Compressor room 0.00 0.00 0.00 100.00 0.00

Title: Document: Page:

Tray Area Specification - List 80044935 02.1


(PLAREALB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Area ID Area Description X0 Y0 Z0 X1 Y1


(m) (m) (m) (m) (m)

762 Water Dist, Pump and Cool sys 0.00 0.00 0.00 100.00 0.00

791 Substation For Utilities 0.00 0.00 0.00 100.00 0.00

801 AUX & CCR Dept 0.00 0.00 0.00 100.00 0.00

891 Main Substation 0.00 0.00 0.00 100.00 0.00

Title: Document: Page:

Tray Area Specification - List 80044935 02.2


(PLAREALB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Table of Contents Page


03 Tray Type Specification ...................................................................... .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 03.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 03.1

Title: Document: Page:

Tray Type Specification - Table of Contents 80044935 03.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

492-1-0001 - 492-1-0002 TO 401MV200Q02 0.80 90 0 100 THBY 100 THBC 300 THBM 600 (x3) LHBW 600 LHBH

492-1-0002 - 492-1-0003 TO 401LV210Q01 0.80 90 0 100 THBY 100 THBC 300 THBM 600 (x2) LHBW 600 LHBH

492-1-0003 - 492-1-0004 TO 401MV200Q12 0.80 90 0 100 THBY 100 THBC 300 THBM 600 (x2) LHBW 600 LHBH

492-1-0004 - 492-1-0005 TO 441FN590Q01 0.80 90 0 100 THBY 100 THBC 300 THBM 600 (x2) LHBW 600 LHBH

492-1-0005 - 492-1-0006 TWDS 492 DEPT ENTRY 4.73 90 0 100 THBY 100 THBC 300 THBM 600 (x2) LHBW 600 LHBH

492-1-0006 - 492-1-0007 TWDS 492 DEPT ENTRY 1.25 180 0 100 THBY 500 THBC 300 THBM 300 LHBH

492-1-0006 - 492-1-0008 TWDS 492 DEPT ENTRY 0.95 0 0 100 THBY 500 THBC 300 THBM 600 (x2) LHBW 300 LHBH

492-1-0008 - 492-1-0009 TWDS 401LG200X09/EX12 4.15 0 0 100 THBY 500 (x2) THBC 300 THBM 600 (x4) LHBW 600 LHBH

492-1-0009 - 492-1-0010 TWDS 401LG200X09/EX12 1.35 0 90 100 TRBM 50 PRAW 300 LRBH

492-1-0009 - 492-1-0014 TO 401LV210-FA01 0.90 -90 0 100 THBY 300 THBC 100 THBM 600 (x2) LHBW

492-1-0009 - 492-1-0026 TWDS 401LV220-FA01 0.60 0 0 100 THBY 500 (x2) THBC 300 THBM 600 (x6) LHBW 600 LHBH

492-1-0010 - 492-1-0011 TWDS 401LG200X09/EX12 2.60 90 0 100 THBM 50 PRAW 300 LHBH

492-1-0011 - 492-1-0012 TWDS 401LG200X09/EX12 1.67 90 0 25 PRAM 50 PRAW

492-1-0011 - 492-1-0013 TWDS 401LV210T01-PRI 1.45 0 0 100 THBM 300 LHBH

492-1-0012 - 492-2-0001 TO 401LG200X09/EX12 2.15 0 90 25 PRAM 50 PRAW

492-1-0013 - 492-2-0002 TO 401LV210T01-PRI 3.36 0 90 100 TRBM 300 LRBH

492-1-0014 - 492-1-0015 TO 401LV210-FA02 0.80 -90 0 100 THBY 300 THBC 100 THBM 600 LHBW

492-1-0015 - 492-1-0016 TWDS 492UP100G01 3.90 -90 0 100 THBY 500 THBC 100 THBM 200 LHBW

492-1-0016 - 492-1-0017 TO 401CS200A01 1.40 -90 0 100 THBY 300 THBC 100 THBM 200 LHBW

492-1-0017 - 492-1-0018 TO 401CS200A02 1.20 -90 0 100 THBY 300 THBC 100 THBM 200 LHBW

492-1-0018 - 492-1-0019 TO 401CS200A03 1.20 -90 0 100 THBY 300 THBC 100 THBM 200 LHBW

492-1-0019 - 492-1-0020 TWDS 401LV210-BA02 2.25 -90 0 100 THBY 300 THBC 200 LHBW

492-1-0020 - 492-1-0021 TWDS 401LV210-BA02 0.60 0 0 100 THBY 300 THBC 300 THBM 600 (x5) LHBW 600 (x2) LHBH

492-1-0021 - 492-1-0023 TWDS 401LV210-BA02 9.95 90 0 100 THBC 200 LHBW

492-1-0021 - 492-1-0036 TWDS 441FN300U01 2.80 0 0 100 THBY 300 THBC 300 THBM 600 (x5) LHBW 600 (x2) LHBH

492-1-0023 - 492-1-0024 TO 401LV210-BA01 0.80 90 0 100 THBC 600 LHBW

Title: Document: Page:


Tray Type Specification - List 80044935 03.1
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

492-1-0024 - 492-1-0026 TWDS 401LV220-FA01 0.90 90 0 100 THBC 600 LHBW

492-1-0026 - 492-1-0027 TWDS 401LV220-FA01 2.80 0 0 100 THBY 500 THBC 100 THBM 600 (x6) LHBW 600 LHBH

492-1-0027 - 492-1-0028 TO 401LV220-FA01 0.90 -90 0 100 THBY 100 THBC 100 THBM 600 (x3) LHBW

492-1-0027 - 492-1-0049 TWDS 401LV210T01-SEC 0.60 0 0 100 THBY 500 THBC 100 THBM 600 (x6) LHBW 600 LHBH

492-1-0028 - 492-1-0029 TO 401LV220-FA02 0.80 -90 0 100 THBY 100 THBC 600 (x3) LHBW

492-1-0029 - 492-1-0030 TWDS 441FN310U01 2.80 -90 0 100 THBY 100 THBC 600 (x3) LHBW

492-1-0030 - 492-1-0031 TO 441FN315U01 1.11 -90 0 100 THBY 100 THBC 600 (x2) LHBW

492-1-0031 - 492-1-0032 TO 441FN325U01 1.11 -90 0 100 THBY 100 THBC 600 (x2) LHBW

492-1-0032 - 492-1-0033 TO 441FN335U01 1.10 -90 0 100 THBY 100 THBC 600 (x2) LHBW

492-1-0033 - 492-1-0034 TO 441FN345U01 1.11 -90 0 100 THBY 100 THBC 600 LHBW

492-1-0034 - 492-1-0035 TO 441FN355U01 1.10 -90 0 100 THBY 100 THBC 600 LHBW

492-1-0035 - 492-1-0036 TWDS 441FN300U01 1.62 -90 0 100 THBY 100 THBC 600 LHBW

492-1-0036 - 492-1-0037 TWDS 441FN300U01 0.60 0 0 100 THBY 300 THBC 300 THBM 600 (x5) LHBW 600 (x2) LHBH

492-1-0037 - 492-1-0038 TO 401LG200X06A/EX11B 2.17 0 0 100 THBY 300 THBC 300 THBM 600 (x4) LHBW 600 (x2) LHBH

492-1-0037 - 492-1-0040 TO 441FN300U01 1.62 90 0 100 THBY 100 THBC 600 LHBW

492-1-0038 - 492-1-0039 TWDS 401LG200X05/EX11A 0.28 -90 0 100 THBM 50 PRAW

492-1-0038 - 492-1-0076 TWDS 401LG200A01 2.23 0 0 100 THBY 300 THBC 300 THBM 600 (x4) LHBW 600 (x2) LHBH

492-1-0039 - 492-2-0008 TO 401LG200X05/EX11A 5.70 90 90 100 TRBM 200 LRBW

492-1-0040 - 492-1-0041 TO 441FN305U01 1.10 90 0 100 THBY 100 THBC 600 LHBW

492-1-0041 - 492-1-0042 TO 441FN320U01 1.11 90 0 100 THBY 100 THBC

492-1-0042 - 492-1-0043 TO 441FN330U01 1.10 90 0 100 THBY 100 THBC 600 LHBW

492-1-0043 - 492-1-0044 TO 441FN340U01 1.11 90 0 100 THBY 100 THBC 600 LHBW

492-1-0044 - 492-1-0045 TO 441FN350U01 1.11 90 0 100 THBY 100 THBC 600 (x2) LHBW

492-1-0045 - 492-1-0046 TWDS 401LV220-BA02 2.80 90 0 100 THBY 100 THBC 600 (x2) LHBW

492-1-0046 - 492-1-0048 TO 401LV220-BA01 0.80 90 0 100 THBY 100 THBC 600 (x2) LHBW

492-1-0048 - 492-1-0049 TWDS 401LV210T01-SEC 0.90 90 0 100 THBY 100 THBC 600 (x2) LHBW

Title: Document: Page:


Tray Type Specification - List 80044935 03.2
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

492-1-0049 - 492-1-0050 TWDS 401LV210T01-SEC 1.41 0 0 100 THBY 300 THBC 100 THBM 600 (x5) LHBW 600 LHBH

492-1-0050 - 492-1-0051 TWDS 401LV210T01-SEC 1.35 0 90 600 (x2) LRBW

492-1-0050 - 492-1-0054 TWDS 441FN590T01-PRI 0.77 0 0 100 THBY 300 THBC 100 THBM 600 (x3) LHBW 600 LHBH

492-1-0051 - 492-1-0052 TWDS 401LV210T01-SEC 2.60 90 0 600 (x2) LHBW

492-1-0052 - 492-1-0053 TWDS 401LV210T01-SEC 1.46 180 0 600 (x2) LHBW

492-1-0053 - 492-2-0003 TO 401LV210T01-SEC 3.36 0 90 600 (x2) LRBW

492-1-0054 - 492-1-0055 TWDS 441FN590T01-PRI 1.35 0 90 100 TRBM 300 LRBH

492-1-0054 - 492-1-0058 TWDS 441FN590T01-SEC 2.22 0 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW 300 LHBH

492-1-0055 - 492-1-0056 TWDS 441FN590T01-PRI 2.59 90 0 100 TRBM 300 LRBH

492-1-0056 - 492-1-0057 TWDS 441FN590T01-PRI 0.78 1 0 100 THBM 300 LHBH

492-1-0057 - 492-2-0004 TO 441FN590T01-PRI 3.36 0 90 100 TRBM 300 LRBH

492-1-0058 - 492-1-0059 TWDS 441FN590T01-SEC 1.21 0 0 100 THBY 300 THBC 100 THBM 600 (x2) LHBW 300 LHBH

492-1-0058 - 492-1-0109 TO 471CV200U01/U02 1.81 -90 0 100 THBY 100 THBC 100 THBM 600 (x2) LHBW

492-1-0059 - 492-1-0060 TWDS 441FN590T01-SEC 1.35 0 90 200 LRBW

492-1-0059 - 492-1-0063 TWDS 401LV200T01-PRI 0.77 0 0 100 THBY 300 THBC 100 THBM 600 (x2) LHBW 300 LHBH

492-1-0060 - 492-1-0061 TWDS 441FN590T01-SEC 2.60 90 0 200 LRBW

492-1-0061 - 492-1-0062 TWDS 441FN590T01-SEC 0.78 180 0 200 LHBW

492-1-0062 - 492-2-0005 TO 441FN590T01-SEC 3.36 -72 88 200 LRBW

492-1-0063 - 492-1-0064 TWDS 401LV200T01-PRI 1.35 0 90 100 TRBM 300 LRBH

492-1-0063 - 492-1-0083 TWDS 401LV200T01-SEC 1.17 0 0 100 THBY 300 THBC 100 THBM 600 (x2) LHBW

492-1-0064 - 492-1-0065 TWDS 401LV200T01-PRI 2.60 90 0 100 TRBM 300 LRBH

492-1-0065 - 492-1-0066 TWDS 401LV200T01-PRI 0.77 0 0 100 THBM 300 LHBH

492-1-0066 - 492-2-0006 TO 401LV200T01-PRI 3.36 0 90 100 TRBM 300 LRBH

492-1-0067 - 492-1-0068 TO 441EP551A01 1.60 -90 0 100 THBC 100 THBM 600 LHBW

492-1-0068 - 492-1-0069 TO 441EP552A01 0.60 -90 0 100 THBC 100 THBM 600 LHBW

492-1-0069 - 492-1-0070 TO 441EP553A01 0.60 -90 0 100 THBC 100 THBM 600 LHBW

Title: Document: Page:


Tray Type Specification - List 80044935 03.3
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

492-1-0070 - 492-1-0071 TO 441EP550A01 0.60 -90 0 100 THBC 100 THBM 600 LHBW

492-1-0071 - 492-1-0072 TO 441EP554A01 0.60 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0072 - 492-1-0073 TO 441EP555A01 0.60 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0073 - 492-1-0074 TO 441EP556A01 0.60 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0074 - 492-1-0075 TO 401LG200A01 1.90 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0075 - 492-1-0076 TWDS 401LV200-FA07 1.55 -90 0 100 THBY 100 THBC 300 THBM 600 LHBW

492-1-0076 - 492-1-0077 TWDS 401LV200-FA07 3.15 0 0 100 THBY 300 THBC 300 THBM 600 (x5) LHBW 600 (x2) LHBH

492-1-0077 - 492-1-0097 TWDS 492 DEPT ENTRY 0.60 0 0 100 THBY 300 THBC 300 THBM 600 (x3) LHBW 600 (x2) LHBH

492-1-0077 - 492-1-0102 TO 401LV200-FA07492 1.15 90 0 100 THBC 100 THBM 600 (x2) LHBW

492-1-0078 - 492-1-0079 TO 401LV200-FA04 1.00 90 0 100 THBC 100 THBM 600 LHBW

492-1-0079 - 492-1-0080 TO 401LV200-FA03 1.00 90 0 100 THBC 100 THBM 600 LHBW

492-1-0080 - 492-1-0081 TO 401LV200-FA02 0.90 90 0 100 THBC 100 THBM 600 LHBW

492-1-0081 - 492-1-0082 TO 401LV200-FA01 0.80 90 0 100 THBC 100 THBM 600 LHBW

492-1-0082 - 492-1-0083 TWDS 401LV200T01-SEC 4.80 90 0 100 THBY 100 THBC 100 THBM 600 (x2) LHBW

492-1-0083 - 492-1-0084 TWDS 401LV200T01-SEC 0.60 0 0 100 THBY 300 THBC 100 THBM 600 (x2) LHBW

492-1-0084 - 492-1-0085 TWDS 401LV200T01-SEC 1.66 0 0 100 THBM 600 (x2) LHBW

492-1-0084 - 492-1-0094 TO 492UP110G02 1.09 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0085 - 492-1-0086 TWDS 401LV200T01-SEC 1.35 0 90 100 TRBM 600 (x2) LRBW

492-1-0086 - 492-1-0087 TWDS 401LV200T01-SEC 2.60 90 0 100 TRBM 600 (x2) LRBW

492-1-0087 - 492-1-0088 TWDS 401LV200T01-SEC 0.77 180 0 600 (x2) LRBW

492-1-0087 - 492-1-0099 TWDS 401LG200EX03 1.60 90 0 25 PRAM

492-1-0088 - 492-2-0007 TO 401LV200T01-SEC 3.36 180 90 600 (x2) LRBW

492-1-0089 - 492-1-0090 TO 401LV200-BA02 0.80 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0089 - 492-1-0110 TWDS 701CS120A06 1.52 0 0 100 THBY 100 THBM

492-1-0090 - 492-1-0091 TO 401LV200-BA03 0.90 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0091 - 492-1-0092 TO 401LV200-BA04 1.00 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

Title: Document: Page:


Tray Type Specification - List 80044935 03.4
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Length (m) Vertical Angle from Level 0 Level 1 Level 2 Level 3 Level 4 Level 5
Angle XY-plane

492-1-0092 - 492-1-0093 TO 401LV200-BA05 1.00 -90 0 100 THBY 100 THBM 600 LHBW

492-1-0093 - 492-1-0104 TO 401LV200-BA06 1.00 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0094 - 492-1-0096 TO 492UP110G01 1.02 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0096 - 492-1-0089 TO 401LV200-BA01 2.69 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0097 - 492-1-0107 TWDS 492SJ990A01 1.60 0 0 100 THBY 100 THBC 100 THBM 600 (x2) LHBW 600 (x2) LHBH

492-1-0098 - 492-1-0001 TO 401LV200Q01 3.72 90 0 100 THBY 100 THBC 300 THBM 600 (x2) LHBW 600 LHBH

492-1-0098 - 492-1-0020 TWDS 401LV210-BA02 5.10 0 0 100 THBY 300 THBC 300 THBM 600 (x5) LHBW 600 (x2) LHBH

492-1-0099 - 492-1-0100 TWDS 401LG200EX03 4.35 0 90 100 TRBM

492-1-0100 - 492-1-0101 TO 401LG200EX03 0.78 0 0 100 TRBM

492-1-0102 - 492-1-0103 TO 401LV200-FA06 1.00 90 0 100 THBC 100 THBM 600 (x2) LHBW

492-1-0103 - 492-1-0078 TO 401LV200-FA05 1.00 90 0 100 THBC 100 THBM 600 LHBW

492-1-0104 - 492-1-0095 TO 401LG200EX05 1.49 0 0 100 THBM

492-1-0104 - 492-1-0105 TO 401LV220-BA07 0.70 -90 0 100 THBY 100 THBC 100 THBM 600 LHBW

492-1-0105 - 492-1-0106 TO 401LV220-BA08 0.60 -90 0 100 THBY 100 THBC 100 THBM 600 (x2) LHBW

492-1-0106 - 492-1-0097 TWDS 492 DEPT ENTRY 0.85 -90 0 100 THBY 100 THBC 100 THBM 600 (x2) LHBW

492-1-0107 - 492-1-0108 TO 492SJ990A01 4.21 0 -90 200 LRBW

492-1-0109 - 492-1-0067 TO 441FN590U01 1.18 -90 0 100 THBY 100 THBC 100 THBM 600 (x2) LHBW

492-1-0110 - 492-2-0017 TO 701CS120A06 3.50 0 90 100 THBY 100 THBM

492-2-0008 - 492-2-0009 TO 401LG200X04 4.86 180 0 100 TRBM

492-2-0008 - 492-2-0010 TWDS 401LG200X07/X08 2.03 0 0 100 TRBM 200 LRBW

492-2-0010 - 492-2-0011 TO 401LG200X07/X08 2.20 0 -90 100 TRBM 200 LRBW

492-2-0010 - 492-2-0012 TWDS 401LG200EX04 0.78 0 0 100 TRBM

492-2-0010 - 492-2-0014 TO 401LG200X06B 1.93 -90 0 100 TRBM

492-2-0012 - 492-2-0013 TO 401LG200EX04 2.20 0 -90 100 TRBM

492-2-0014 - 492-2-0015 TWDS 401LG200EX11C 0.44 0 0 100 TRBM

492-2-0015 - 492-2-0016 TO 401LG200EX11C 2.20 0 -90 100 TRBM

Title: Document: Page:


Tray Type Specification - List 80044935 03.5
(PLTPIS9B.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Table of Contents Page


04 Y Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 04.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 04.1

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - Table of Contents 80044935 04.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0001 - 492-1-0002 TO 401MV200Q02 100 THBY 0.80 0,0 0,820 14 5

492-1-0002 - 492-1-0003 TO 401LV210Q01 100 THBY 0.80 0,0 0,820 14 5

492-1-0003 - 492-1-0004 TO 401MV200Q12 100 THBY 0.80 0,0 0,820 14 5

492-1-0004 - 492-1-0005 TO 441FN590Q01 100 THBY 0.80 0,0 0,820 14 5

492-1-0005 - 492-1-0006 TWDS 492 DEPT ENTRY 100 THBY 4.73 0,0 0,820 14 5

492-1-0006 - 492-1-0007 TWDS 492 DEPT ENTRY 100 THBY 1.25 0,0 1,480 25 8

492-1-0006 - 492-1-0008 TWDS 492 DEPT ENTRY 100 THBY 0.95 0,0 0,820 14 5

492-1-0008 - 492-1-0009 TWDS 401LG200X09/EX12 100 THBY 4.15 0,0 0,820 14 5

492-1-0009 - 492-1-0014 TO 401LV210-FA01 100 THBY 0.90 0,0 1,060 18 8

492-1-0009 - 492-1-0026 TWDS 401LV220-FA01 100 THBY 0.60 0,0 0,400 7 5

492-1-0014 - 492-1-0015 TO 401LV210-FA02 100 THBY 0.80 0,0 0,900 15 6

492-1-0015 - 492-1-0016 TWDS 492UP100G01 100 THBY 3.90 0,0 0,900 15 6

492-1-0016 - 492-1-0017 TO 401CS200A01 100 THBY 1.40 0,0 0,900 15 6

492-1-0017 - 492-1-0018 TO 401CS200A02 100 THBY 1.20 0,0 0,240 4 3

492-1-0018 - 492-1-0019 TO 401CS200A03 100 THBY 1.20 0,0 0,240 4 3

492-1-0019 - 492-1-0020 TWDS 401LV210-BA02 100 THBY 2.25 0,0 0,160 3 2

492-1-0020 - 492-1-0021 TWDS 401LV210-BA02 100 THBY 0.60 0,0 1,560 26 9

492-1-0021 - 492-1-0036 TWDS 441FN300U01 100 THBY 2.80 0,0 1,560 26 9

492-1-0026 - 492-1-0027 TWDS 401LV220-FA01 100 THBY 2.80 0,0 0,400 7 5

492-1-0027 - 492-1-0028 TO 401LV220-FA01 100 THBY 0.90 0,0 0,160 3 2

492-1-0027 - 492-1-0049 TWDS 401LV210T01-SEC 100 THBY 0.60 0,0 0,240 4 3

492-1-0028 - 492-1-0029 TO 401LV220-FA02 100 THBY 0.80 0,0 0,080 1 1

492-1-0029 - 492-1-0030 TWDS 441FN310U01 100 THBY 2.80 0,0 0,080 1 1

492-1-0030 - 492-1-0031 TO 441FN315U01 100 THBY 1.11 0,0 0,080 1 1

492-1-0031 - 492-1-0032 TO 441FN325U01 100 THBY 1.11 0,0 0,080 1 1

492-1-0032 - 492-1-0033 TO 441FN335U01 100 THBY 1.10 0,0 0,080 1 1

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - List 80044935 04.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0033 - 492-1-0034 TO 441FN345U01 100 THBY 1.11 0,0 0,080 1 1

492-1-0034 - 492-1-0035 TO 441FN355U01 100 THBY 1.10 0,0 0,080 1 1

492-1-0035 - 492-1-0036 TWDS 441FN300U01 100 THBY 1.62 0,0 0,080 1 1

492-1-0036 - 492-1-0037 TWDS 441FN300U01 100 THBY 0.60 0,0 1,640 27 10

492-1-0037 - 492-1-0038 TO 401LG200X06A/EX11B 100 THBY 2.17 0,0 1,560 26 9

492-1-0037 - 492-1-0040 TO 441FN300U01 100 THBY 1.62 0,0 0,080 1 1

492-1-0038 - 492-1-0076 TWDS 401LG200A01 100 THBY 2.23 0,0 1,560 26 9

492-1-0040 - 492-1-0041 TO 441FN305U01 100 THBY 1.10 0,0 0,080 1 1

492-1-0041 - 492-1-0042 TO 441FN320U01 100 THBY 1.11 0,0 0,080 1 1

492-1-0042 - 492-1-0043 TO 441FN330U01 100 THBY 1.10 0,0 0,080 1 1

492-1-0043 - 492-1-0044 TO 441FN340U01 100 THBY 1.11 0,0 0,080 1 1

492-1-0044 - 492-1-0045 TO 441FN350U01 100 THBY 1.11 0,0 0,080 1 1

492-1-0045 - 492-1-0046 TWDS 401LV220-BA02 100 THBY 2.80 0,0 0,080 1 1

492-1-0046 - 492-1-0048 TO 401LV220-BA01 100 THBY 0.80 0,0 0,080 1 1

492-1-0048 - 492-1-0049 TWDS 401LV210T01-SEC 100 THBY 0.90 0,0 0,080 1 1

492-1-0049 - 492-1-0050 TWDS 401LV210T01-SEC 100 THBY 1.41 0,0 0,320 5 4

492-1-0050 - 492-1-0054 TWDS 441FN590T01-PRI 100 THBY 0.77 0,0 0,320 5 4

492-1-0054 - 492-1-0058 TWDS 441FN590T01-SEC 100 THBY 2.22 0,0 0,320 5 4

492-1-0058 - 492-1-0059 TWDS 441FN590T01-SEC 100 THBY 1.21 0,0 0,160 3 2

492-1-0058 - 492-1-0109 TO 471CV200U01/U02 100 THBY 1.81 0,0 0,160 3 2

492-1-0059 - 492-1-0063 TWDS 401LV200T01-PRI 100 THBY 0.77 0,0 0,160 3 2

492-1-0063 - 492-1-0083 TWDS 401LV200T01-SEC 100 THBY 1.17 0,0 0,160 3 2

492-1-0071 - 492-1-0072 TO 441EP554A01 100 THBY 0.60 0,0 0,080 1 1

492-1-0072 - 492-1-0073 TO 441EP555A01 100 THBY 0.60 0,0 0,080 1 1

492-1-0073 - 492-1-0074 TO 441EP556A01 100 THBY 0.60 0,0 0,080 1 1

492-1-0074 - 492-1-0075 TO 401LG200A01 100 THBY 1.90 0,0 0,080 1 1

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - List 80044935 04.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0075 - 492-1-0076 TWDS 401LV200-FA07 100 THBY 1.55 0,0 0,080 1 1

492-1-0076 - 492-1-0077 TWDS 401LV200-FA07 100 THBY 3.15 0,0 1,480 25 8

492-1-0077 - 492-1-0097 TWDS 492 DEPT ENTRY 100 THBY 0.60 0,0 1,480 25 8

492-1-0082 - 492-1-0083 TWDS 401LV200T01-SEC 100 THBY 4.80 0,0 0,240 4 3

492-1-0083 - 492-1-0084 TWDS 401LV200T01-SEC 100 THBY 0.60 0,0 0,080 1 1

492-1-0084 - 492-1-0094 TO 492UP110G02 100 THBY 1.09 0,0 0,080 1 1

492-1-0089 - 492-1-0090 TO 401LV200-BA02 100 THBY 0.80 0,0 0,185 3 1

492-1-0089 - 492-1-0110 TWDS 701CS120A06 100 THBY 1.52 0,0 0,265 4 2

492-1-0090 - 492-1-0091 TO 401LV200-BA03 100 THBY 0.90 0,0 0,185 3 1

492-1-0091 - 492-1-0092 TO 401LV200-BA04 100 THBY 1.00 0,0 0,185 3 1

492-1-0092 - 492-1-0093 TO 401LV200-BA05 100 THBY 1.00 0,0 0,185 3 1

492-1-0093 - 492-1-0104 TO 401LV200-BA06 100 THBY 1.00 0,0 0,185 3 1

492-1-0094 - 492-1-0096 TO 492UP110G01 100 THBY 1.02 0,0 0,080 1 1

492-1-0096 - 492-1-0089 TO 401LV200-BA01 100 THBY 2.69 0,0 0,080 1 1

492-1-0097 - 492-1-0107 TWDS 492SJ990A01 100 THBY 1.60 0,0 1,295 22 7

492-1-0098 - 492-1-0001 TO 401LV200Q01 100 THBY 3.72 0,0 0,820 14 5

492-1-0098 - 492-1-0020 TWDS 401LV210-BA02 100 THBY 5.10 0,0 1,560 26 9

492-1-0104 - 492-1-0105 TO 401LV220-BA07 100 THBY 0.70 0,0 0,185 3 1

492-1-0105 - 492-1-0106 TO 401LV220-BA08 100 THBY 0.60 0,0 0,185 3 1

492-1-0106 - 492-1-0097 TWDS 492 DEPT ENTRY 100 THBY 0.85 0,0 0,185 3 1

492-1-0109 - 492-1-0067 TO 441FN590U01 100 THBY 1.18 0,0 0,160 3 2

492-1-0110 - 492-2-0017 TO 701CS120A06 100 THBY 3.50 90,0 0,265 4 2

Title: Document: Page:

Y Tray Segment Quantities & Fill Area - List 80044935 04.3


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Table of Contents Page


05 C Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 05.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 05.1

Title: Document: Page:

C Tray Segment Quantities & Fill Area - Table of Contents 80044935 05.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0001 - 492-1-0002 TO 401MV200Q02 100 THBC 0.80 0,0 0,114 2 2

492-1-0002 - 492-1-0003 TO 401LV210Q01 100 THBC 0.80 0,0 0,057 1 1

492-1-0003 - 492-1-0004 TO 401MV200Q12 100 THBC 0.80 0,0 0,057 1 1

492-1-0004 - 492-1-0005 TO 441FN590Q01 100 THBC 0.80 0,0 0,057 1 1

492-1-0005 - 492-1-0006 TWDS 492 DEPT ENTRY 100 THBC 4.73 0,0 0,444 8 4

492-1-0006 - 492-1-0007 TWDS 492 DEPT ENTRY 500 THBC 1.25 0,0 16,265 53 182

492-1-0006 - 492-1-0008 TWDS 492 DEPT ENTRY 500 THBC 0.95 0,0 16,265 53 182

492-1-0008 - 492-1-0009 TWDS 401LG200X09/EX12 500 (x2) THBC 4.15 0,0 16,265 27 182

492-1-0009 - 492-1-0014 TO 401LV210-FA01 300 THBC 0.90 0,0 9,785 52 120

492-1-0009 - 492-1-0026 TWDS 401LV220-FA01 500 (x2) THBC 0.60 0,0 7,710 13 76

492-1-0014 - 492-1-0015 TO 401LV210-FA02 300 THBC 0.80 0,0 9,842 52 121

492-1-0015 - 492-1-0016 TWDS 492UP100G01 500 THBC 3.90 0,0 9,068 29 115

492-1-0016 - 492-1-0017 TO 401CS200A01 300 THBC 1.40 0,0 9,183 48 116

492-1-0017 - 492-1-0018 TO 401CS200A02 300 THBC 1.20 0,0 8,842 47 109

492-1-0018 - 492-1-0019 TO 401CS200A03 300 THBC 1.20 0,0 0,571 3 9

492-1-0019 - 492-1-0020 TWDS 401LV210-BA02 300 THBC 2.25 0,0 0,399 2 7

492-1-0020 - 492-1-0021 TWDS 401LV210-BA02 300 THBC 0.60 0,0 7,395 44 65

492-1-0021 - 492-1-0023 TWDS 401LV210-BA02 100 THBC 9.95 0,0 0,222 4 2

492-1-0021 - 492-1-0036 TWDS 441FN300U01 300 THBC 2.80 0,0 7,617 45 67

492-1-0023 - 492-1-0024 TO 401LV210-BA01 100 THBC 0.80 0,0 0,939 17 7

492-1-0024 - 492-1-0026 TWDS 401LV220-FA01 100 THBC 0.90 0,0 1,326 24 10

492-1-0026 - 492-1-0027 TWDS 401LV220-FA01 500 THBC 2.80 0,0 7,716 26 78

492-1-0027 - 492-1-0028 TO 401LV220-FA01 100 THBC 0.90 0,0 2,004 34 20

492-1-0027 - 492-1-0049 TWDS 401LV210T01-SEC 500 THBC 0.60 0,0 6,156 21 62

492-1-0028 - 492-1-0029 TO 401LV220-FA02 100 THBC 0.80 0,0 1,947 33 19

492-1-0029 - 492-1-0030 TWDS 441FN310U01 100 THBC 2.80 0,0 1,674 28 18

Title: Document: Page:

C Tray Segment Quantities & Fill Area - List 80044935 05.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0030 - 492-1-0031 TO 441FN315U01 100 THBC 1.11 0,0 1,395 23 15

492-1-0031 - 492-1-0032 TO 441FN325U01 100 THBC 1.11 0,0 1,116 19 12

492-1-0032 - 492-1-0033 TO 441FN335U01 100 THBC 1.10 0,0 0,837 14 9

492-1-0033 - 492-1-0034 TO 441FN345U01 100 THBC 1.11 0,0 0,558 9 6

492-1-0034 - 492-1-0035 TO 441FN355U01 100 THBC 1.10 0,0 0,279 5 3

492-1-0035 - 492-1-0036 TWDS 441FN300U01 100 THBC 1.62 0,0 0,444 8 4

492-1-0036 - 492-1-0037 TWDS 441FN300U01 300 THBC 0.60 0,0 7,617 45 67

492-1-0037 - 492-1-0038 TO 401LG200X06A/EX11B 300 THBC 2.17 0,0 7,395 44 65

492-1-0037 - 492-1-0040 TO 441FN300U01 100 THBC 1.62 0,0 0,222 4 2

492-1-0038 - 492-1-0076 TWDS 401LG200A01 300 THBC 2.23 0,0 7,395 44 65

492-1-0040 - 492-1-0041 TO 441FN305U01 100 THBC 1.10 0,0 0,057 1 1

492-1-0041 - 492-1-0042 TO 441FN320U01 100 THBC 1.11 0,0 0,336 5 4

492-1-0042 - 492-1-0043 TO 441FN330U01 100 THBC 1.10 0,0 0,615 10 7

492-1-0043 - 492-1-0044 TO 441FN340U01 100 THBC 1.11 0,0 0,894 15 10

492-1-0044 - 492-1-0045 TO 441FN350U01 100 THBC 1.11 0,0 1,173 19 13

492-1-0045 - 492-1-0046 TWDS 401LV220-BA02 100 THBC 2.80 0,0 1,452 24 16

492-1-0046 - 492-1-0048 TO 401LV220-BA01 100 THBC 0.80 0,0 1,281 22 13

492-1-0048 - 492-1-0049 TWDS 401LV210T01-SEC 100 THBC 0.90 0,0 1,281 22 13

492-1-0049 - 492-1-0050 TWDS 401LV210T01-SEC 300 THBC 1.41 0,0 4,875 28 49

492-1-0050 - 492-1-0054 TWDS 441FN590T01-PRI 300 THBC 0.77 0,0 4,875 28 49

492-1-0054 - 492-1-0058 TWDS 441FN590T01-SEC 300 THBC 2.22 0,0 4,875 28 49

492-1-0058 - 492-1-0059 TWDS 441FN590T01-SEC 300 THBC 1.21 0,0 2,619 15 25

492-1-0058 - 492-1-0109 TO 471CV200U01/U02 100 THBC 1.81 0,0 3,144 54 32

492-1-0059 - 492-1-0063 TWDS 401LV200T01-PRI 300 THBC 0.77 0,0 2,619 15 25

492-1-0063 - 492-1-0083 TWDS 401LV200T01-SEC 300 THBC 1.17 0,0 2,619 15 25

492-1-0067 - 492-1-0068 TO 441EP551A01 100 THBC 1.60 0,0 2,364 41 24

Title: Document: Page:

C Tray Segment Quantities & Fill Area - List 80044935 05.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0068 - 492-1-0069 TO 441EP552A01 100 THBC 0.60 0,0 1,970 34 20

492-1-0069 - 492-1-0070 TO 441EP553A01 100 THBC 0.60 0,0 1,576 27 16

492-1-0070 - 492-1-0071 TO 441EP550A01 100 THBC 0.60 0,0 1,182 20 12

492-1-0071 - 492-1-0072 TO 441EP554A01 100 THBC 0.60 0,0 1,239 21 13

492-1-0072 - 492-1-0073 TO 441EP555A01 100 THBC 0.60 0,0 0,845 14 9

492-1-0073 - 492-1-0074 TO 441EP556A01 100 THBC 0.60 0,0 0,451 8 5

492-1-0074 - 492-1-0075 TO 401LG200A01 100 THBC 1.90 0,0 0,057 1 1

492-1-0075 - 492-1-0076 TWDS 401LV200-FA07 100 THBC 1.55 0,0 0,057 1 1

492-1-0076 - 492-1-0077 TWDS 401LV200-FA07 300 THBC 3.15 0,0 7,338 44 64

492-1-0077 - 492-1-0097 TWDS 492 DEPT ENTRY 300 THBC 0.60 0,0 4,514 27 38

492-1-0077 - 492-1-0102 TO 401LV200-FA07492 100 THBC 1.15 0,0 3,268 60 30

492-1-0078 - 492-1-0079 TO 401LV200-FA04 100 THBC 1.00 0,0 0,279 5 3

492-1-0079 - 492-1-0080 TO 401LV200-FA03 100 THBC 1.00 0,0 1,585 28 15

492-1-0080 - 492-1-0081 TO 401LV200-FA02 100 THBC 0.90 0,0 2,332 42 22

492-1-0081 - 492-1-0082 TO 401LV200-FA01 100 THBC 0.80 0,0 2,332 42 22

492-1-0082 - 492-1-0083 TWDS 401LV200T01-SEC 100 THBC 4.80 0,0 2,332 42 22

492-1-0083 - 492-1-0084 TWDS 401LV200T01-SEC 300 THBC 0.60 0,0 0,287 2 3

492-1-0084 - 492-1-0094 TO 492UP110G02 100 THBC 1.09 0,0 0,287 5 3

492-1-0089 - 492-1-0090 TO 401LV200-BA02 100 THBC 0.80 0,0 0,230 4 2

492-1-0090 - 492-1-0091 TO 401LV200-BA03 100 THBC 0.90 0,0 0,230 4 2

492-1-0091 - 492-1-0092 TO 401LV200-BA04 100 THBC 1.00 0,0 0,230 4 2

492-1-0093 - 492-1-0104 TO 401LV200-BA06 100 THBC 1.00 0,0 2,455 46 17

492-1-0094 - 492-1-0096 TO 492UP110G01 100 THBC 1.02 0,0 0,344 6 4

492-1-0096 - 492-1-0089 TO 401LV200-BA01 100 THBC 2.69 0,0 0,230 4 2

492-1-0097 - 492-1-0107 TWDS 492SJ990A01 100 THBC 1.60 0,0 1,945 35 19

492-1-0098 - 492-1-0001 TO 401LV200Q01 100 THBC 3.72 0,0 0,114 2 2

Title: Document: Page:

C Tray Segment Quantities & Fill Area - List 80044935 05.3


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0098 - 492-1-0020 TWDS 401LV210-BA02 300 THBC 5.10 0,0 7,224 43 62

492-1-0102 - 492-1-0103 TO 401LV200-FA06 100 THBC 1.00 0,0 3,154 58 28

492-1-0103 - 492-1-0078 TO 401LV200-FA05 100 THBC 1.00 0,0 2,004 37 18

492-1-0104 - 492-1-0105 TO 401LV220-BA07 100 THBC 0.70 0,0 2,569 48 19

492-1-0105 - 492-1-0106 TO 401LV220-BA08 100 THBC 0.60 0,0 2,569 48 19

492-1-0106 - 492-1-0097 TWDS 492 DEPT ENTRY 100 THBC 0.85 0,0 2,569 48 19

492-1-0109 - 492-1-0067 TO 441FN590U01 100 THBC 1.18 0,0 2,586 45 26

Title: Document: Page:

C Tray Segment Quantities & Fill Area - List 80044935 05.4


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Table of Contents Page


06 M Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 06.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 06.1

Title: Document: Page:

M Tray Segment Quantities & Fill Area - Table of Contents 80044935 06.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0001 - 492-1-0002 TO 401MV200Q02 300 THBM 0.80 0,0 4,965 22 16

492-1-0002 - 492-1-0003 TO 401LV210Q01 300 THBM 0.80 0,0 4,725 21 15

492-1-0003 - 492-1-0004 TO 401MV200Q12 300 THBM 0.80 0,0 5,375 24 18

492-1-0004 - 492-1-0005 TO 441FN590Q01 300 THBM 0.80 0,0 5,375 24 18

492-1-0005 - 492-1-0006 TWDS 492 DEPT ENTRY 300 THBM 4.73 0,0 5,850 26 20

492-1-0006 - 492-1-0007 TWDS 492 DEPT ENTRY 300 THBM 1.25 0,0 9,470 41 42

492-1-0006 - 492-1-0008 TWDS 492 DEPT ENTRY 300 THBM 0.95 0,0 6,470 27 34

492-1-0008 - 492-1-0009 TWDS 401LG200X09/EX12 300 THBM 4.15 0,0 6,470 27 34

492-1-0009 - 492-1-0010 TWDS 401LG200X09/EX12 100 TRBM 1.35 90,0 0,375 6 2

492-1-0009 - 492-1-0014 TO 401LV210-FA01 100 THBM 0.90 0,0 2,570 32 14

492-1-0009 - 492-1-0026 TWDS 401LV220-FA01 300 THBM 0.60 0,0 4,375 18 24

492-1-0010 - 492-1-0011 TWDS 401LG200X09/EX12 100 THBM 2.60 0,0 0,375 6 2

492-1-0011 - 492-1-0012 TWDS 401LG200X09/EX12 25 PRAM 1.67 0,0 0,075 25 1

492-1-0011 - 492-1-0013 TWDS 401LV210T01-PRI 100 THBM 1.45 0,0 0,300 4 1

492-1-0012 - 492-2-0001 TO 401LG200X09/EX12 25 PRAM 2.15 90,0 0,075 25 1

492-1-0013 - 492-2-0002 TO 401LV210T01-PRI 100 TRBM 3.36 90,0 0,300 4 1

492-1-0014 - 492-1-0015 TO 401LV210-FA02 100 THBM 0.80 0,0 2,045 25 11

492-1-0015 - 492-1-0016 TWDS 492UP100G01 100 THBM 3.90 0,0 2,045 25 11

492-1-0016 - 492-1-0017 TO 401CS200A01 100 THBM 1.40 0,0 2,045 25 11

492-1-0017 - 492-1-0018 TO 401CS200A02 100 THBM 1.20 0,0 2,045 25 11

492-1-0018 - 492-1-0019 TO 401CS200A03 100 THBM 1.20 0,0 2,045 25 11

492-1-0020 - 492-1-0021 TWDS 401LV210-BA02 300 THBM 0.60 0,0 9,917 50 37

492-1-0021 - 492-1-0036 TWDS 441FN300U01 300 THBM 2.80 0,0 9,917 50 37

492-1-0026 - 492-1-0027 TWDS 401LV220-FA01 100 THBM 2.80 0,0 4,375 57 24

492-1-0027 - 492-1-0028 TO 401LV220-FA01 100 THBM 0.90 0,0 0,525 6 3

492-1-0027 - 492-1-0049 TWDS 401LV210T01-SEC 100 THBM 0.60 0,0 4,550 59 25

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044935 06.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0036 - 492-1-0037 TWDS 441FN300U01 300 THBM 0.60 0,0 9,917 50 37

492-1-0037 - 492-1-0038 TO 401LG200X06A/EX11B 300 THBM 2.17 0,0 9,917 50 37

492-1-0038 - 492-1-0039 TWDS 401LG200X05/EX11A 100 THBM 0.28 0,0 1,729 25 9

492-1-0038 - 492-1-0076 TWDS 401LG200A01 300 THBM 2.23 0,0 11,646 58 46

492-1-0039 - 492-2-0008 TO 401LG200X05/EX11A 100 TRBM 5.70 89,9 1,311 20 7

492-1-0049 - 492-1-0050 TWDS 401LV210T01-SEC 100 THBM 1.41 0,0 4,550 59 25

492-1-0050 - 492-1-0054 TWDS 441FN590T01-PRI 100 THBM 0.77 0,0 4,550 59 25

492-1-0054 - 492-1-0055 TWDS 441FN590T01-PRI 100 TRBM 1.35 90,0 0,300 4 1

492-1-0054 - 492-1-0058 TWDS 441FN590T01-SEC 300 THBM 2.22 0,0 4,250 18 24

492-1-0055 - 492-1-0056 TWDS 441FN590T01-PRI 100 TRBM 2.59 0,0 0,300 4 1

492-1-0056 - 492-1-0057 TWDS 441FN590T01-PRI 100 THBM 0.78 0,0 0,300 4 1

492-1-0057 - 492-2-0004 TO 441FN590T01-PRI 100 TRBM 3.36 90,0 0,300 4 1

492-1-0058 - 492-1-0059 TWDS 441FN590T01-SEC 100 THBM 1.21 0,0 4,218 53 23

492-1-0058 - 492-1-0109 TO 471CV200U01/U02 100 THBM 1.81 0,0 0,468 7 3

492-1-0059 - 492-1-0063 TWDS 401LV200T01-PRI 100 THBM 0.77 0,0 4,218 53 23

492-1-0063 - 492-1-0064 TWDS 401LV200T01-PRI 100 TRBM 1.35 90,0 0,300 4 1

492-1-0063 - 492-1-0083 TWDS 401LV200T01-SEC 100 THBM 1.17 0,0 3,918 49 22

492-1-0064 - 492-1-0065 TWDS 401LV200T01-PRI 100 TRBM 2.60 0,0 0,300 4 1

492-1-0065 - 492-1-0066 TWDS 401LV200T01-PRI 100 THBM 0.77 0,0 0,300 4 1

492-1-0066 - 492-2-0006 TO 401LV200T01-PRI 100 TRBM 3.36 89,7 0,300 4 1

492-1-0067 - 492-1-0068 TO 441EP551A01 100 THBM 1.60 0,0 0,293 5 2

492-1-0068 - 492-1-0069 TO 441EP552A01 100 THBM 0.60 0,0 0,293 5 2

492-1-0069 - 492-1-0070 TO 441EP553A01 100 THBM 0.60 0,0 0,293 5 2

492-1-0070 - 492-1-0071 TO 441EP550A01 100 THBM 0.60 0,0 0,293 5 2

492-1-0071 - 492-1-0072 TO 441EP554A01 100 THBM 0.60 0,0 0,293 5 2

492-1-0072 - 492-1-0073 TO 441EP555A01 100 THBM 0.60 0,0 0,293 5 2

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044935 06.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0073 - 492-1-0074 TO 441EP556A01 100 THBM 0.60 0,0 0,293 5 2

492-1-0074 - 492-1-0075 TO 401LG200A01 100 THBM 1.90 0,0 0,293 5 2

492-1-0075 - 492-1-0076 TWDS 401LV200-FA07 300 THBM 1.55 0,0 8,809 47 31

492-1-0076 - 492-1-0077 TWDS 401LV200-FA07 300 THBM 3.15 0,0 3,273 13 17

492-1-0077 - 492-1-0097 TWDS 492 DEPT ENTRY 300 THBM 0.60 0,0 3,448 14 18

492-1-0077 - 492-1-0102 TO 401LV200-FA07492 100 THBM 1.15 0,0 1,575 19 9

492-1-0078 - 492-1-0079 TO 401LV200-FA04 100 THBM 1.00 0,0 2,275 28 13

492-1-0079 - 492-1-0080 TO 401LV200-FA03 100 THBM 1.00 0,0 2,275 28 13

492-1-0080 - 492-1-0081 TO 401LV200-FA02 100 THBM 0.90 0,0 2,275 28 13

492-1-0081 - 492-1-0082 TO 401LV200-FA01 100 THBM 0.80 0,0 2,275 28 13

492-1-0082 - 492-1-0083 TWDS 401LV200T01-SEC 100 THBM 4.80 0,0 1,925 24 11

492-1-0083 - 492-1-0084 TWDS 401LV200T01-SEC 100 THBM 0.60 0,0 1,993 25 11

492-1-0084 - 492-1-0085 TWDS 401LV200T01-SEC 100 THBM 1.66 0,0 0,218 3 1

492-1-0084 - 492-1-0094 TO 492UP110G02 100 THBM 1.09 0,0 1,775 22 10

492-1-0085 - 492-1-0086 TWDS 401LV200T01-SEC 100 TRBM 1.35 90,0 0,218 3 1

492-1-0086 - 492-1-0087 TWDS 401LV200T01-SEC 100 TRBM 2.60 0,0 0,218 3 1

492-1-0087 - 492-1-0099 TWDS 401LG200EX03 25 PRAM 1.60 0,0 0,218 31 1

492-1-0089 - 492-1-0090 TO 401LV200-BA02 100 THBM 0.80 0,0 1,950 25 11

492-1-0089 - 492-1-0110 TWDS 701CS120A06 100 THBM 1.52 0,0 0,175 2 1

492-1-0090 - 492-1-0091 TO 401LV200-BA03 100 THBM 0.90 0,0 1,950 25 11

492-1-0091 - 492-1-0092 TO 401LV200-BA04 100 THBM 1.00 0,0 1,950 25 11

492-1-0092 - 492-1-0093 TO 401LV200-BA05 100 THBM 1.00 0,0 1,950 25 11

492-1-0093 - 492-1-0104 TO 401LV200-BA06 100 THBM 1.00 0,0 1,950 25 11

492-1-0094 - 492-1-0096 TO 492UP110G01 100 THBM 1.02 0,0 1,775 22 10

492-1-0096 - 492-1-0089 TO 401LV200-BA01 100 THBM 2.69 0,0 1,775 22 10

492-1-0097 - 492-1-0107 TWDS 492SJ990A01 100 THBM 1.60 0,0 1,655 21 8

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044935 06.3


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0098 - 492-1-0001 TO 401LV200Q01 300 THBM 3.72 0,0 4,665 21 15

492-1-0098 - 492-1-0020 TWDS 401LV210-BA02 300 THBM 5.10 0,0 9,917 50 37

492-1-0099 - 492-1-0100 TWDS 401LG200EX03 100 TRBM 4.35 90,0 0,218 3 1

492-1-0100 - 492-1-0101 TO 401LG200EX03 100 TRBM 0.78 0,0 0,218 3 1

492-1-0102 - 492-1-0103 TO 401LV200-FA06 100 THBM 1.00 0,0 2,275 28 13

492-1-0103 - 492-1-0078 TO 401LV200-FA05 100 THBM 1.00 0,0 2,275 28 13

492-1-0104 - 492-1-0095 TO 401LG200EX05 100 THBM 1.49 0,0 0,218 3 1

492-1-0104 - 492-1-0105 TO 401LV220-BA07 100 THBM 0.70 0,0 1,793 22 10

492-1-0105 - 492-1-0106 TO 401LV220-BA08 100 THBM 0.60 0,0 1,793 22 10

492-1-0106 - 492-1-0097 TWDS 492 DEPT ENTRY 100 THBM 0.85 0,0 1,793 22 10

492-1-0109 - 492-1-0067 TO 441FN590U01 100 THBM 1.18 0,0 0,468 7 3

492-1-0110 - 492-2-0017 TO 701CS120A06 100 THBM 3.50 90,0 0,175 2 1

492-2-0008 - 492-2-0009 TO 401LG200X04 100 TRBM 4.86 0,0 0,200 3 1

492-2-0008 - 492-2-0010 TWDS 401LG200X07/X08 100 TRBM 2.03 0,0 0,693 11 4

492-2-0010 - 492-2-0011 TO 401LG200X07/X08 100 TRBM 2.20 -90,0 0,200 3 1

492-2-0010 - 492-2-0012 TWDS 401LG200EX04 100 TRBM 0.78 0,0 0,218 3 1

492-2-0010 - 492-2-0014 TO 401LG200X06B 100 TRBM 1.93 0,0 0,275 5 2

492-2-0012 - 492-2-0013 TO 401LG200EX04 100 TRBM 2.20 -90,0 0,218 3 1

492-2-0014 - 492-2-0015 TWDS 401LG200EX11C 100 TRBM 0.44 0,0 0,075 2 1

492-2-0015 - 492-2-0016 TO 401LG200EX11C 100 TRBM 2.20 -90,0 0,075 2 1

Title: Document: Page:

M Tray Segment Quantities & Fill Area - List 80044935 06.4


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Table of Contents Page


07 W Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 07.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 07.1

Title: Document: Page:

W Tray Segment Quantities & Fill Area - Table of Contents 80044935 07.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0001 - 492-1-0002 TO 401MV200Q02 600 (x3) LHBW 0.80 0,0 125,455 50 35

492-1-0002 - 492-1-0003 TO 401LV210Q01 600 (x2) LHBW 0.80 0,0 118,845 73 33

492-1-0003 - 492-1-0004 TO 401MV200Q12 600 (x2) LHBW 0.80 0,0 118,845 73 33

492-1-0004 - 492-1-0005 TO 441FN590Q01 600 (x2) LHBW 0.80 0,0 118,845 73 33

492-1-0005 - 492-1-0006 TWDS 492 DEPT ENTRY 600 (x2) LHBW 4.73 0,0 110,085 67 31

492-1-0006 - 492-1-0008 TWDS 492 DEPT ENTRY 600 (x2) LHBW 0.95 0,0 110,085 67 31

492-1-0008 - 492-1-0009 TWDS 401LG200X09/EX12 600 (x4) LHBW 4.15 0,0 169,408 74 76

492-1-0009 - 492-1-0010 TWDS 401LG200X09/EX12 50 PRAW 1.35 90,0 0,200 7 1

492-1-0009 - 492-1-0014 TO 401LV210-FA01 600 (x2) LHBW 0.90 0,0 80,190 41 10

492-1-0009 - 492-1-0026 TWDS 401LV220-FA01 600 (x6) LHBW 0.60 0,0 213,138 63 87

492-1-0010 - 492-1-0011 TWDS 401LG200X09/EX12 50 PRAW 2.60 0,0 0,200 7 1

492-1-0011 - 492-1-0012 TWDS 401LG200X09/EX12 50 PRAW 1.67 0,0 0,200 7 1

492-1-0012 - 492-2-0001 TO 401LG200X09/EX12 50 PRAW 2.15 90,0 0,200 7 1

492-1-0014 - 492-1-0015 TO 401LV210-FA02 600 LHBW 0.80 0,0 11,170 15 2

492-1-0015 - 492-1-0016 TWDS 492UP100G01 200 LHBW 3.90 0,0 4,485 19 1

492-1-0016 - 492-1-0017 TO 401CS200A01 200 LHBW 1.40 0,0 4,985 32 3

492-1-0017 - 492-1-0018 TO 401CS200A02 200 LHBW 1.20 0,0 5,185 38 4

492-1-0018 - 492-1-0019 TO 401CS200A03 200 LHBW 1.20 0,0 5,385 44 5

492-1-0019 - 492-1-0020 TWDS 401LV210-BA02 200 LHBW 2.25 0,0 5,985 62 8

492-1-0020 - 492-1-0021 TWDS 401LV210-BA02 600 (x5) LHBW 0.60 0,0 202,478 68 87

492-1-0021 - 492-1-0023 TWDS 401LV210-BA02 200 LHBW 9.95 0,0 11,580 46 2

492-1-0021 - 492-1-0036 TWDS 441FN300U01 600 (x5) LHBW 2.80 0,0 213,648 71 89

492-1-0023 - 492-1-0024 TO 401LV210-BA01 600 LHBW 0.80 0,0 18,275 23 3

492-1-0024 - 492-1-0026 TWDS 401LV220-FA01 600 LHBW 0.90 0,0 32,330 43 6

492-1-0026 - 492-1-0027 TWDS 401LV220-FA01 600 (x6) LHBW 2.80 0,0 245,468 71 93

492-1-0027 - 492-1-0028 TO 401LV220-FA01 600 (x3) LHBW 0.90 0,0 165,310 64 26

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044935 07.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0027 - 492-1-0049 TWDS 401LV210T01-SEC 600 (x6) LHBW 0.60 0,0 228,388 65 87

492-1-0028 - 492-1-0029 TO 401LV220-FA02 600 (x3) LHBW 0.80 0,0 108,510 42 18

492-1-0029 - 492-1-0030 TWDS 441FN310U01 600 (x3) LHBW 2.80 0,0 115,930 46 20

492-1-0030 - 492-1-0031 TO 441FN315U01 600 (x2) LHBW 1.11 0,0 97,420 57 16

492-1-0031 - 492-1-0032 TO 441FN325U01 600 (x2) LHBW 1.11 0,0 89,270 51 14

492-1-0032 - 492-1-0033 TO 441FN335U01 600 (x2) LHBW 1.10 0,0 60,870 34 10

492-1-0033 - 492-1-0034 TO 441FN345U01 600 LHBW 1.11 0,0 20,540 28 4

492-1-0034 - 492-1-0035 TO 441FN355U01 600 LHBW 1.10 0,0 20,540 28 4

492-1-0035 - 492-1-0036 TWDS 441FN300U01 600 LHBW 1.62 0,0 42,880 58 8

492-1-0036 - 492-1-0037 TWDS 441FN300U01 600 (x5) LHBW 0.60 0,0 189,508 65 85

492-1-0037 - 492-1-0038 TO 401LG200X06A/EX11B 600 (x4) LHBW 2.17 0,0 156,508 71 79

492-1-0037 - 492-1-0040 TO 441FN300U01 600 LHBW 1.62 0,0 26,890 39 6

492-1-0038 - 492-1-0039 TWDS 401LG200X05/EX11A 50 PRAW 0.28 0,0 0,200 7 1

492-1-0038 - 492-1-0076 TWDS 401LG200A01 600 (x4) LHBW 2.23 0,0 156,708 71 80

492-1-0039 - 492-2-0008 TO 401LG200X05/EX11A 200 LRBW 5.70 89,9 0,610 6 1

492-1-0040 - 492-1-0041 TO 441FN305U01 600 LHBW 1.10 0,0 8,150 13 2

492-1-0042 - 492-1-0043 TO 441FN330U01 600 LHBW 1.10 0,0 16,300 25 4

492-1-0043 - 492-1-0044 TO 441FN340U01 600 LHBW 1.11 0,0 44,700 59 8

492-1-0044 - 492-1-0045 TO 441FN350U01 600 (x2) LHBW 1.11 0,0 75,660 43 12

492-1-0045 - 492-1-0046 TWDS 401LV220-BA02 600 (x2) LHBW 2.80 0,0 94,400 56 16

492-1-0046 - 492-1-0048 TO 401LV220-BA01 600 (x2) LHBW 0.80 0,0 61,460 34 10

492-1-0048 - 492-1-0049 TWDS 401LV210T01-SEC 600 (x2) LHBW 0.90 0,0 61,460 34 10

492-1-0049 - 492-1-0050 TWDS 401LV210T01-SEC 600 (x5) LHBW 1.41 0,0 209,698 64 77

492-1-0050 - 492-1-0051 TWDS 401LV210T01-SEC 600 (x2) LRBW 1.35 90,0 125,820 67 16

492-1-0050 - 492-1-0054 TWDS 441FN590T01-PRI 600 (x3) LHBW 0.77 0,0 83,878 63 61

492-1-0051 - 492-1-0052 TWDS 401LV210T01-SEC 600 (x2) LHBW 2.60 0,0 125,820 67 16

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044935 07.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0052 - 492-1-0053 TWDS 401LV210T01-SEC 600 (x2) LHBW 1.46 0,0 125,820 67 16

492-1-0053 - 492-2-0003 TO 401LV210T01-SEC 600 (x2) LRBW 3.36 90,0 125,820 67 16

492-1-0054 - 492-1-0058 TWDS 441FN590T01-SEC 600 (x3) LHBW 2.22 0,0 83,878 63 61

492-1-0058 - 492-1-0059 TWDS 441FN590T01-SEC 600 (x2) LHBW 1.21 0,0 55,060 57 35

492-1-0058 - 492-1-0109 TO 471CV200U01/U02 600 (x2) LHBW 1.81 0,0 71,328 64 34

492-1-0059 - 492-1-0060 TWDS 441FN590T01-SEC 200 LRBW 1.35 90,0 14,610 51 2

492-1-0059 - 492-1-0063 TWDS 401LV200T01-PRI 600 (x2) LHBW 0.77 0,0 40,860 48 33

492-1-0060 - 492-1-0061 TWDS 441FN590T01-SEC 200 LRBW 2.60 0,0 14,610 51 2

492-1-0061 - 492-1-0062 TWDS 441FN590T01-SEC 200 LHBW 0.78 0,0 14,610 51 2

492-1-0062 - 492-2-0005 TO 441FN590T01-SEC 200 LRBW 3.36 87,8 14,610 51 2

492-1-0063 - 492-1-0083 TWDS 401LV200T01-SEC 600 (x2) LHBW 1.17 0,0 40,860 48 33

492-1-0067 - 492-1-0068 TO 441EP551A01 600 LHBW 1.60 0,0 22,708 75 26

492-1-0068 - 492-1-0069 TO 441EP552A01 600 LHBW 0.60 0,0 19,043 63 22

492-1-0069 - 492-1-0070 TO 441EP553A01 600 LHBW 0.60 0,0 15,378 51 18

492-1-0070 - 492-1-0071 TO 441EP550A01 600 LHBW 0.60 0,0 11,713 40 14

492-1-0071 - 492-1-0072 TO 441EP554A01 600 LHBW 0.60 0,0 23,423 58 17

492-1-0072 - 492-1-0073 TO 441EP555A01 600 LHBW 0.60 0,0 19,758 46 13

492-1-0073 - 492-1-0074 TO 441EP556A01 600 LHBW 0.60 0,0 16,093 34 9

492-1-0074 - 492-1-0075 TO 401LG200A01 600 LHBW 1.90 0,0 12,428 23 5

492-1-0075 - 492-1-0076 TWDS 401LV200-FA07 600 LHBW 1.55 0,0 19,703 35 7

492-1-0076 - 492-1-0077 TWDS 401LV200-FA07 600 (x5) LHBW 3.15 0,0 176,331 61 83

492-1-0077 - 492-1-0097 TWDS 492 DEPT ENTRY 600 (x3) LHBW 0.60 0,0 120,231 66 55

492-1-0077 - 492-1-0102 TO 401LV200-FA07492 600 (x2) LHBW 1.15 0,0 57,420 58 32

492-1-0078 - 492-1-0079 TO 401LV200-FA04 600 LHBW 1.00 0,0 2,360 9 3

492-1-0079 - 492-1-0080 TO 401LV200-FA03 600 LHBW 1.00 0,0 10,310 42 15

492-1-0080 - 492-1-0081 TO 401LV200-FA02 600 LHBW 0.90 0,0 14,240 63 24

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044935 07.3


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0081 - 492-1-0082 TO 401LV200-FA01 600 LHBW 0.80 0,0 14,240 63 24

492-1-0082 - 492-1-0083 TWDS 401LV200T01-SEC 600 (x2) LHBW 4.80 0,0 87,710 68 49

492-1-0083 - 492-1-0084 TWDS 401LV200T01-SEC 600 (x2) LHBW 0.60 0,0 87,870 53 34

492-1-0084 - 492-1-0085 TWDS 401LV200T01-SEC 600 (x2) LHBW 1.66 0,0 73,470 36 25

492-1-0084 - 492-1-0094 TO 492UP110G02 600 LHBW 1.09 0,0 14,400 34 9

492-1-0085 - 492-1-0086 TWDS 401LV200T01-SEC 600 (x2) LRBW 1.35 90,0 73,470 36 25

492-1-0086 - 492-1-0087 TWDS 401LV200T01-SEC 600 (x2) LRBW 2.60 0,0 73,470 36 25

492-1-0087 - 492-1-0088 TWDS 401LV200T01-SEC 600 (x2) LRBW 0.77 0,0 73,470 36 25

492-1-0088 - 492-2-0007 TO 401LV200T01-SEC 600 (x2) LRBW 3.36 89,8 73,470 36 25

492-1-0089 - 492-1-0090 TO 401LV200-BA02 600 LHBW 0.80 0,0 17,800 42 11

492-1-0090 - 492-1-0091 TO 401LV200-BA03 600 LHBW 0.90 0,0 17,800 42 11

492-1-0091 - 492-1-0092 TO 401LV200-BA04 600 LHBW 1.00 0,0 17,800 42 11

492-1-0092 - 492-1-0093 TO 401LV200-BA05 600 LHBW 1.00 0,0 5,460 19 6

492-1-0093 - 492-1-0104 TO 401LV200-BA06 600 LHBW 1.00 0,0 17,440 56 18

492-1-0094 - 492-1-0096 TO 492UP110G01 600 LHBW 1.02 0,0 15,018 37 12

492-1-0096 - 492-1-0089 TO 401LV200-BA01 600 LHBW 2.69 0,0 17,800 42 11

492-1-0097 - 492-1-0107 TWDS 492SJ990A01 600 (x2) LHBW 1.60 0,0 62,063 49 22

492-1-0098 - 492-1-0001 TO 401LV200Q01 600 (x2) LHBW 3.72 0,0 119,345 75 35

492-1-0098 - 492-1-0020 TWDS 401LV210-BA02 600 (x5) LHBW 5.10 0,0 197,303 65 81

492-1-0102 - 492-1-0103 TO 401LV200-FA06 600 (x2) LHBW 1.00 0,0 54,740 57 32

492-1-0103 - 492-1-0078 TO 401LV200-FA05 600 LHBW 1.00 0,0 22,250 63 19

492-1-0104 - 492-1-0105 TO 401LV220-BA07 600 LHBW 0.70 0,0 18,168 67 24

492-1-0105 - 492-1-0106 TO 401LV220-BA08 600 (x2) LHBW 0.60 0,0 41,188 41 26

492-1-0106 - 492-1-0097 TWDS 492 DEPT ENTRY 600 (x2) LHBW 0.85 0,0 68,138 57 37

492-1-0107 - 492-1-0108 TO 492SJ990A01 200 LRBW 4.21 -90,0 0,640 6 1

492-1-0109 - 492-1-0067 TO 441FN590U01 600 (x2) LHBW 1.18 0,0 63,328 54 30

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044935 07.4


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-2-0008 - 492-2-0010 TWDS 401LG200X07/X08 200 LRBW 2.03 0,0 0,610 6 1

492-2-0010 - 492-2-0011 TO 401LG200X07/X08 200 LRBW 2.20 -90,0 0,610 6 1

Title: Document: Page:

W Tray Segment Quantities & Fill Area - List 80044935 07.5


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Table of Contents Page


08 H Tray Segment Quantities & Fill Area ........................................................ .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 08.0.1
List ........................................................................................ .................................. ( 1 04/10/2016)..... 08.1

Title: Document: Page:

H Tray Segment Quantities & Fill Area - Table of Contents 80044935 08.0.1
DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0001 - 492-1-0002 TO 401MV200Q02 600 LHBH 0.80 0,0 30,450 49 9

492-1-0002 - 492-1-0003 TO 401LV210Q01 600 LHBH 0.80 0,0 17,550 28 3

492-1-0003 - 492-1-0004 TO 401MV200Q12 600 LHBH 0.80 0,0 26,850 40 6

492-1-0004 - 492-1-0005 TO 441FN590Q01 600 LHBH 0.80 0,0 26,850 40 6

492-1-0005 - 492-1-0006 TWDS 492 DEPT ENTRY 600 LHBH 4.73 0,0 32,700 49 7

492-1-0006 - 492-1-0007 TWDS 492 DEPT ENTRY 300 LHBH 1.25 0,0 11,700 38 2

492-1-0006 - 492-1-0008 TWDS 492 DEPT ENTRY 300 LHBH 0.95 0,0 21,000 61 5

492-1-0008 - 492-1-0009 TWDS 401LG200X09/EX12 600 LHBH 4.15 0,0 21,000 30 5

492-1-0009 - 492-1-0010 TWDS 401LG200X09/EX12 300 LRBH 1.35 90,0 9,300 24 3

492-1-0009 - 492-1-0026 TWDS 401LV220-FA01 600 LHBH 0.60 0,0 11,700 19 2

492-1-0010 - 492-1-0011 TWDS 401LG200X09/EX12 300 LHBH 2.60 0,0 9,300 24 3

492-1-0011 - 492-1-0013 TWDS 401LV210T01-PRI 300 LHBH 1.45 0,0 9,300 24 3

492-1-0013 - 492-2-0002 TO 401LV210T01-PRI 300 LRBH 3.36 90,0 9,300 24 3

492-1-0020 - 492-1-0021 TWDS 401LV210-BA02 600 (x2) LHBH 0.60 0,0 116,770 71 37

492-1-0021 - 492-1-0036 TWDS 441FN300U01 600 (x2) LHBH 2.80 0,0 116,770 71 37

492-1-0026 - 492-1-0027 TWDS 401LV220-FA01 600 LHBH 2.80 0,0 11,700 19 2

492-1-0027 - 492-1-0049 TWDS 401LV210T01-SEC 600 LHBH 0.60 0,0 11,700 19 2

492-1-0036 - 492-1-0037 TWDS 441FN300U01 600 (x2) LHBH 0.60 0,0 116,770 71 37

492-1-0037 - 492-1-0038 TO 401LG200X06A/EX11B 600 (x2) LHBH 2.17 0,0 116,770 71 37

492-1-0038 - 492-1-0076 TWDS 401LG200A01 600 (x2) LHBH 2.23 0,0 116,770 71 37

492-1-0049 - 492-1-0050 TWDS 401LV210T01-SEC 600 LHBH 1.41 0,0 11,700 19 2

492-1-0050 - 492-1-0054 TWDS 441FN590T01-PRI 600 LHBH 0.77 0,0 11,700 19 2

492-1-0054 - 492-1-0055 TWDS 441FN590T01-PRI 300 LRBH 1.35 90,0 5,850 19 1

492-1-0054 - 492-1-0058 TWDS 441FN590T01-SEC 300 LHBH 2.22 0,0 5,850 19 1

492-1-0055 - 492-1-0056 TWDS 441FN590T01-PRI 300 LRBH 2.59 0,0 5,850 19 1

492-1-0056 - 492-1-0057 TWDS 441FN590T01-PRI 300 LHBH 0.78 0,0 5,850 19 1

Title: Document: Page:

H Tray Segment Quantities & Fill Area - List 80044935 08.1


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Tray Section ID Tray Section Description Tray Type Subsystem Cal. Length Actual Angle from Weight incl. Cables Fill Area % No. of Cables
(m) Length (m) XY-plane (kg/m)

492-1-0057 - 492-2-0004 TO 441FN590T01-PRI 300 LRBH 3.36 90,0 5,850 19 1

492-1-0058 - 492-1-0059 TWDS 441FN590T01-SEC 300 LHBH 1.21 0,0 5,850 19 1

492-1-0059 - 492-1-0063 TWDS 401LV200T01-PRI 300 LHBH 0.77 0,0 5,850 19 1

492-1-0063 - 492-1-0064 TWDS 401LV200T01-PRI 300 LRBH 1.35 90,0 5,850 19 1

492-1-0064 - 492-1-0065 TWDS 401LV200T01-PRI 300 LRBH 2.60 0,0 5,850 19 1

492-1-0065 - 492-1-0066 TWDS 401LV200T01-PRI 300 LHBH 0.77 0,0 5,850 19 1

492-1-0066 - 492-2-0006 TO 401LV200T01-PRI 300 LRBH 3.36 89,7 5,850 19 1

492-1-0076 - 492-1-0077 TWDS 401LV200-FA07 600 (x2) LHBH 3.15 0,0 116,770 71 37

492-1-0077 - 492-1-0097 TWDS 492 DEPT ENTRY 600 (x2) LHBH 0.60 0,0 116,770 71 37

492-1-0097 - 492-1-0107 TWDS 492SJ990A01 600 (x2) LHBH 1.60 0,0 116,770 71 37

492-1-0098 - 492-1-0001 TO 401LV200Q01 600 LHBH 3.72 0,0 24,600 39 8

492-1-0098 - 492-1-0020 TWDS 401LV210-BA02 600 (x2) LHBH 5.10 0,0 116,770 71 37

Title: Document: Page:

H Tray Segment Quantities & Fill Area - List 80044935 08.2


(PLTPLENB.RPT)
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Table of Contents Page


09 Cable Tray & Ladder Installation ............................................................. .................................. ( 1 04/10/2016).....
Table of Contents ........................................................................... .................................. ( 1 04/10/2016)..... 09.0.1
Cable Tray & Ladder Code .................................................................... .................................. ( 1 04/10/2016)..... 09.1
Routing Symbols & Cable Code ................................................................ .................................. ( 1 04/10/2016)..... 09.2
Guidelines for Node Numbers ................................................................. .................................. ( 1 04/10/2016)..... 09.3
Guidelines for Laying Cables ................................................................ .................................. ( 1 04/10/2016)..... 09.4

Title: Document: Page:

Cable Tray & Ladder Installation - Table of Contents 80044935 09.0.1


DOCONT2.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Cable Tray & Ladder Code 80044935 09.1
PIC1_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Routing Symbols & Cable Code 80044935 09.2
PIC2_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Guidelines for Node Numbers 80044935 09.3
PIC3_UK_B.RPT
Project Number 1545366 Cable Tray\ Ladder Installation Print Date 06/10/2016
Project Name DG KHAN Hub Department 492 Revision 1 04/10/2016
Plant Name DG KHAN Hub Cement Cooler substation Init. DIOE

Title: Document: Page:

Cable Tray & Ladder Installation - Guidelines for Laying Cables 80044935 09.4