NEEDED DATA FOR 1ST MANDAUE-MACTAN BRIDGE

ITEM # DESCRIPTION REMARKS

1 BRIDGE FOUNDATION

1.1 Soil Investigation Report


1.2 Piles (Caisson) Size (diameter, length & thickness, depth of embedment) & reinforcement
1.3 Pile cap structural details
Size & reinforcement of bridge piers
1.4 Bridge support / bearing details at the piers
1.5 Material specification for concrete & reinforcement steel used
1.6 Elevation of top of pile caps & top of piers

2 BRIDGE SUPERSTRUCTURE (including Approach Girder)

Plans showing the specifications (sizes) of all members of the truss bridge (top & bottom
2.1 chord, web members, portal, top & bottom bracing, stringers, floor beams including Approach
girder)
2.2 Material specification for concrete & steel used
Bridge dimensions (span, depth, height, width, elevations, sections, etc.) in order to define
2.3 the bridge configuration in the computer
2.4 Details of joints/connections
2.5 Elevation of road centerlline

3 DESIGN

3.1 Design vehicle live load


3.2 Bridge load rating
3.3 Bridge design specifications including, wind & earthquake
Any DPWH design requirement (vehicle live load, earthquake, etc) if the bridge will be
3.4
rehabilitated/retrofitted in order to incorporate the rail

DPWH PREVIOUS BRIDGE REHABILITATION DUE TO DAMAGE BY VESSEL


4
COLLISSION DURING TYPHOON

4.1 Detailed damaged report & scope of works for the bridge rehabilitation/retrofitting
4.2 Construction methodology for the rehabilitation/retrofitting
4.3 Detailed plans for rehabilitation/retrofitting