Professional Documents
Culture Documents
in/hazardous-waste-management/
8888888888888888888888888888888888888888888888888888888888888888888888888888
8888
Required Forms
Key Activities
Key Contacts
For more information, Please visit Central Pollution Control Board and Ministry of Environment, Forest and Climate
Change
On receipt of online application, the official of concerned Regional Office (RO), APPCB inspects the industry.
Inspection of the industry/activity is completed within 72 hours of receipt of application from Single Desk Portal.
As per the delegation of powers, the applications are processed at RO level or they are forwarded along with the
inspection report to the Zonal Office (ZO)/ Head Office (HO) for processing.
Timelines:
Category Stipulated Time
Green 7 days
Orange 15 days
Red 21 days
List of documents:
Validity Period
Red Category Orange Category Green Category
Consent Order & Authorisation 5 Years 10 Years 15 Years
(Renewal)
List of Documents to be submitted alongwith Filled in Form-I
The RO verifies the application and submits report to HO for issue / reject the registration.
1. Name and address of the trader with telephone and Fax Numbers (With Proof).
2. TIN/VAT Number / Import Export Code.
3. Description of the waste to be imported.
4. Details of storage, if any.
1. Name and address of the trader with telephone and Fax Numbers (With Proof).
2. TIN/VAT Number / Import Export Code.
3. Description of the waste to be imported.
4. Details of storage, if any.
Required Forms
Form 1 – Application for obtaining authorisation for collection / reception / treatment / transport / storage / dispposal of
Hazardous Waste
Form 5 – Form of application for Grant/renewal of registration of industrial units Possessing environmentally sound
management facilities For reprocessing/recycling
Form 16 – Form for registration of traders for Shedule lll, Part (D)
Format for obtaining approval from the Central Pollution Control Board under the rule 11 of the hazardous wastes
(management, handling and transboundary movement) rules, 2008
Key Activities
M/s. Coastal Waste Management Project (CWMP), Pharmacity, Parawada, Visakhapatnam
In order to ensure scientific disposal of Hazardous Wastes in the State, one Treatment, Storage and Disposal Facility (TSDF) has
been established in the name of M/s. Coastal Waste Management Project with incinerator and land fill at J.N. Pharmacity,
Parawada, Visakhapatnam.
Co-processing of Hazardous Waste
Earlier, organic residues generated from Bulk Drugs & Pharmaceuticals units were incinerated in the captive / common
incinerators whereby wasting the heat value of the Hazardous waste. The energy potential of the hazardous waste is just lost. By
opting Cleaner Production technologies the high calorific value of Hazardous waste generated from Bulk Drugs &
Pharmaceuticals industries are effectively disposed off through cement kiln being operated at 1400 degree centigrade where by
using lot of heat energy resulting in saving of fossil fuels being burnt in the kilns.
APPCB is encouraging co- processing of certain categories of Hazardous Waste in cement plants.
The Central Pollution Control Board (CPCB) is issuing permissions for Co-processing of Hazardous Waste in cement kilns.
APPCB inline with the guidelines of CPCB on co-processing, is encouraging cement plants with rotary kilns to establish
facilities for co-processing of hazardous wastes.
APPCB is putting the responsibility of transportation of the Hazardous wastes either with generators of the hazardous wastes or
with the cement plants to avoid transportation problems. The authorised cement plants have been directed to obtain regular
permission from CPCB for co-processing as and when required.
Procedure for cement plants to obtain regular permission for co-processing of Hazardous Waste:
The prescribed in application under rule 11 of HW Rules, 2008 with supporting information is to be submitted at RO concerned.
After inspection, the report will be forwarded to HO for placing before CFO committee. After grant of trial run permission, the
cement plants will have to conduct trial runs. The trial run report along with RO report/remarks will be forwarded to the CPCB to
take a decision on grant of regular permission.
Mr. M.V.N.Prasad,
SeniorEnvironmentalEngineer
Vijayawada=&-Kurnool-Zone
Mobile: +91 9177303396