QUOTATION
FOR
CONSTRUCTION OF
SEPTIC TANK, SOAK PIT AND INSPECTION CHAMBER
AT ROIDA
:_______________________________________
:_______________________________________
_____________________________________________________________________________
Quotation
Sealed quotations are hereby invited from the experienced bonafied civil contractors for construction of
septic tank, soak pit and inspection chamber at Roida, Barbil, Dist -Keonjhar, Odisha.
The non-transferable quotation document can be obtained from office of Civil Department up to
25.10.2013 at 11.00am without any cost. The quotation in prescribed format complete in all respect should
reach the office of DGM (Finance) on or before 3.30pm on dated 25.10.2013 and opened on the same date
at 4.00 pm in the presence of the Quotationer or their representatives. Quotation document shall also be
available at our company’s website www.birdgroup.gov.in. It can be downloaded and used for submitting the
offer.
The company reserves the right to accept or reject any quotation without assigning any reason and
reserve the right not to accept the lowest offer.
Sd/-
Business Head
Description/Scope of Work : Construction of septic tank, soak pit and inspection chamber at
Roida, Barbil, Dist - Keonjhar, Odisha as per detail break-up of
items enclosed
Time for completion of work : The work has to be completed within a period of 01 (one)
months from the date of issue of work order.
Validity of Quotation : The tender shall be valid for a period of three months (90 days)
from the date of opening of the tender.
Details about the Site : The Roida site is about 14 (fourteen) kilometers away from
Barbil Town. All the construction materials are available in the
Barbil market. The Quotationer are advised to visit the site to
acquaint themselves with the working conditions to be handled
etc. before submitting the tender document.
Liquidated damage : ½ (half) percent per week from the schedule date of completion
subject to maximum of 10% of total contract
value. No Liquidated damage is applicable if the
completion period of the work gets extended beyond the
stipulated period of the contract due to no fault of the
contractor.
Risk Purchase : In the event of failure to fulfill the contract terms and execution
of work as per letter of contract/work order the OMDC reserves
the right to make the contractual obligation carried out by
alternative arrangements and OMDC shall recover from the
contractor any additional cost involve therein.
The Price Quoted : The Quotationer shall quote his price which should include all
Taxes, duties and all other levies applicable i.e. sales Tax,
Income Tax, Custom duty, Contract Tax, Entry Tax, Service Tax
etc. No extra cost will be entertained on account of any Taxes
and duties.
Change of Quantity : OMDC reserves the right to vary the quantity of item or group of items
to be specified in the specification for which unit price will remains
unchanged.
Payment conditions : 90% of contract value shall be paid after completion of job in all
respect. Balance 10% will be kept as security deposit which will be paid
after 90 days from the date of completion of all the work and fulfillment
of contractor liabilities. The bill will be verified by the Engineer through
the quality and volume of the work executed and recorded in the
measurement book. Bill of the work executed shall be jointly signed by
the Engineer and the Contractor.
ARBITRATION
Any dispute or difference under or arising out of in respect of the Agreement/Accepted Contract may
be referred to the sole Arbitration of a person appointed by The Managing Director, The Orissa
Minerals Development Company Limited, AG – 104, Saurav Abasan, Sector – II, Salt Lake, Kolkata –
700091 & his decision in the matter will be final & binding on the contractor & the company. The
arbitration shall be carried out as per Arbitration Act. 1996 & rules made there under as amended
from time to time.
A.G.M. (Civil)
Price – Bid
Bill of Quantity for construction of septic tank, soak pit and inspection chamber at Roida
TOTAL
Rupees………………………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………….. only)
N.B: The Bidder shall quote his price which should include all Taxes, Duties and all other levies applicable i.e. sales
Tax, Income Tax, Custom duty, Contract Tax, Entry Tax, and Service Tax, freight etc. No extra cost will be entertained
on account of any Taxes and duties.