Manual for the
preparation of Elemental.
Cost Analysis (ECA)
Building Cost entre
The Insifeion of Sunrevece Me 7
Fest Eion (June 1985)
Second Edition [With-Amendments] (March 1968)Introduction
Biking Cost Information Centr (BCIC) ofthe Instuion of Surveyors, Malaysia has been set up with the
ite a et collate, analyse and publish cost Information relating to the
(Construction Industry in Malaysia
\Wt his objective in mind the BCIC is published this Manual to sere es a guide forthe preperation of elemental
cast analyses throughout the Industry.
This Manual has been updated from the "ECIS - Standard Form of Cost Analysis - December 1959" and
comprises fve mejor sections namely-he principles of analysis, te instrucions on préparation of analysis, the
7 efinddons of terms used throughout the analysis, the list of elemenis and-the contents of each element and the
standard form of cost analysis.
Te BC ses ok a os wo hat conte overs te ropraton tis Man, Ris eo hoped
fat he tof elamens, defions an tems used, ec, wil be skp end sod widely by all 0 tht the
amaljses cen become a reliable soures of cost information.
Tis document was compe bythe Cost Anayse Sub: Commis of fe BCIC compris olonng :
Encik Hoe Peng Khoon (Chairman)A"
Zz
3
4.
5.
6
iz
ei
9. External Wall Area
40. Wall to Fioor Ratio
i.
Element Ratios -