Perforation

Outline

• Introduction

• Explosive Performance

• Perforation Design

• Perforation Procedure

• Perforation Evaluation
Introduction
Explosive Performance
Perforation Design

Considerations:

• Exploration and appraisal well mainly for well testing purposes :


Payzone(s), duration, type of well testing

• Development well is for producing purposes : Payzone(s), equipment,


production/injection profile
Perforation Procedure

Safety Precaution

• It is prohibited to do the perforation in bad weather condition

• Perforation must be done in the daylight

• All radio or communication devices must be turned off during the operation.

• All welding process must also be suspended after the perforation process is finished
Perforation Procedure

Preparation

• Ensure the hydrostatic pressure of the well is 3-10% above reservoir pressure
(overbalance condition).

• Reduce the hydrostatic pressure inside the tubing by using coiled tubing unit or swab
(TCP-underbalanced)

• Ensure the wing valve X-mas tree is closed (TCP-underbalanced)


Perforation Procedure
Preparation

• Prepare the copy of CCL-GR log of the well for depth correlation (measured depth),
ensure that the depth of CCL-GR log is in accordance with the Gamma Ray-Resistivity
open hole log.

• Ensure that the types & amount of explosives installed and the diameter & length of
casing gun are in accordance with the drilling program.

• Ensure that the detonator used can withstand the temperature of the well and the
detonator is in good condition
Perforation Procedure
Preparation

When using wireline

• Install wireline BOP stack.

When using TCP

• For rigless operation, position the crane near the well in order to increase the safety of the job.

• Install pressure control equipment, which has been equipped with dummy in same diameter
as the gun OD that will be used, at the top valve of x-mas tree

• For pressurised well, the sinker bar design must refer to the following graph.

1.For pressurized well, the sinker bar design must refer to the following graph.
Perforation Procedure
Perforation Procedure
Preparation

When using wireline

• Install wireline BOP stack.

When using TCP

• For rigless operation, position the crane near the well in order to increase the safety of the job.

• Install pressure control equipment, which has been equipped with dummy in same diameter
as the gun OD that will be used, at the top valve of x-mas tree

• For pressurised well, the sinker bar design must refer to the following graph.

1.For pressurized well, the sinker bar design must refer to the following graph.
Perforation Evaluation

If has been ensured that the TCP gun did not fire fish the drop bar by using
wireline/ slick line.