KETERANGAN :

I. EXISTING
JTM EXISTING
JTR EXISTING
Rencana Pemeliharaan Arrester T. BETON 11 MTR EXISTING
T. BESI 11 MTR EXISTING
Feeder Apel Jl. Raya Surabaya-Malang, Pandaan T. BETON 9 MTR EXISTING
T. BESI 9 MTR EXISTING
UDIKLAT PANDAAN G. DIST 3Ø TIPE 2 TIANG
G. DIST 3Ø TIPE 2 TIANG
TUPANG TEKAN
TARIK TIANG BANTU
II. PEMASANGAN
JTM/JTR
NOMOR TIANG
TYPE TIANG
ACCESORIS JTM
ACCESORIS JTR
GARDU DISTRIBUSI
TYPE GARDU
MEREK TRAFO
KAPASITAS TRAFO
JUMLAH JURUSAN
JARINGAN TEGANGAN MENENGAH
JTM A3C PH 70 mm2 =KMS
T. BETON 11 MTR 200 daN =1BTG
T. BESI 11 MTR 156 daN =BTG
T3 Travers Tumpu Tgl + 3 Pinpost =SET
A3 T6 Travers Tumpu Gd + 6 Pinpost =SET
A3 Travers Afspen Tgl + 3 Strain rod =SET
A”6 Travers Afspen Gd + 6 Strain rod =SET
Travers Afspen Gd + 3 Strain rod =SET
LBS
A3 TT (Tumpang Tarik) =SET
TK (Tumpang Tekan) =SET
TTB (Tupang Tarik Tiang Bantu ) =SET
25 kVA 1Ø
GARDU DISTRIBUSI
Gd 3Ø 1T 160 kVA 20 Kv / B2 =SET
A3 Gd 3Ø 1T 100 kVA 20 Kv / B2 =1SET
Gd 1Ø 1T kVA 20 Kv / B2 =SET
JARINGAN TEGANGAN RENDAH (JTR)
JTR LVTC 3 PH 70 mm =KMS
A3 Tiang Beton 9m 100 daN =BTG
Tiang Besi 9m 90 daN =BTG
SA Suspension l. Assembly =SET
100 kVA 3Ø
LA Large Angle Assembly =SET
DE Dead End Assembly =SET
TT (Tupang Tarik) =SET
TK (Tupang Tekan) =SET
Lokasi Pemeliharaan Arrester TTB (Tupang Tarik Tiang Bantu) =SET
E (Pentanahan Ujung JTR) =SET

PLN UDIKLAT PANDAAN

GAMBAR RENCANA PEMELIHARAAN

DIRENCANA : Tim
DIGAMBAR : Sintia
DIPERIKSA : Syahrul
DISETUJUI : Syahrul