Professional Documents
Culture Documents
Candidates ID checked by ASSESSOR - (Assessor to PRINT their name in UPPER CASE LETTERS)
Select on a random basis, from the options below, one failure problem for each candidate in this exercise, and tick the appropriate boxes below.
Problem No 2 One bit nozzle plugged Problem No 2 One bit nozzle plugged
Problem No 3 Choke washout (or cut-out) Problem No 3 Choke washout (or cut-out)
The minimum pass mark is 70% rounded down to the nearest whole number.
1 • Choke manifold.
1 • BOP panel - Position of BOPs and valves.
1 - All gauges.
1 • Confirm choke and kill line contents.
(1) 2. Set choke position (12) 2. Instructions
1 • Set remote or manually operated choke in 4 • Procedures to follow to shut the well in, and
accordance with instructions. check choke position.
2 • Reason for choice of shut-in procedure.
4 • Action to take in case of a drilling break and/or
influx detection.
2 • Hang-off procedure, space out for pipe
shearing.
(4) 3. Prepare to drill (5) 3. Instruct Driller to record kill rate circulating
pressure at given pump speeds
2 • Record kill rate circulating pressures as 1 • Pump n° 1 - 1st kill rate circulating pressure.
requested by Supervisor or on
Driller's own initiative. 1 - 2nd kill rate circulating pressure.
2 • Determine CLF for Kill rate circulating 1 • Pump n° 2 - 1st kill rate circulating pressure.
pressures.
1 - 2nd kill rate circulating pressure.
1 • Instruct Driller on the method to use to record
CLF for kill rate circulating pressures.
9 PAGE TOTAL 21 PAGE TOTAL
3 • Adjust and activate flow indicator alarms. 1 • Give Driller alarm settings.
3 • Adjust and activate PVT alarms. 1 • Check Driller has set alarms accurately.
Drill ahead
(13) 5. Drilling break
3 • Recognise BOP does not seal. 2 • Positioning drill string; hang-off, space out
checking, BOP adjustment if required.
2 • Activate another BOP and inform Supervisor.
(4) 7. Collect shut in data (8) 6. Collect shut in data from Driller and
physically check it
2 • SICP.
2 • Gain.
(3) 8. Monitor bottom hole pressure (8) 7. Monitor bottom hole pressure
3 • Monitor surface pressures and report to 5 • Instruct Driller to monitor pressure changes and
Supervisor. to inform supervisor.
3 • Complete a usable kill sheet within 15 minutes. F
2 • Start-up procedure.
3 • Co-ordinate pump start up with Supervisor (e.g. 3 • When starting up pump, co-ordinate with Driller.
informing Supervisor every 5 strokes).
1 • Inform Supervisor when kill rate has been 5 • Kill procedure initiated correctly (adjusting for
reached. CLF &/or KLF effect).
4 • Make allowance for time delay between action
on the choke and reading on the standpipe
gauge.
(5) Problem.1 – Total pump failure (7) Problem.1 – Total pump failure
(5) Problem.2 - One bit nozzle plugged (7) Problem.2 - One bit nozzle plugged
2 • Recognise sudden change in pump pressure 5 • Identify the problem and take correct action.
and notify Supervisor (if not detected by
Supervisor).
3 • Stop pump as requested by Supervisor and co- 2 • Give appropriate instructions and co-ordinate
ordinate restart of operations with Supervisor. restart of operations with Driller.
N.B. If Supervisor does not stop, deduct 3 points
from maximum possible total.
(5) Problem.3 - Choke washout (or cut-out) (7) Problem.3 - Choke washout (or cut-out)
2 • Stop pump when requested by Supervisor and 5 • Identify the problem and take correct action.
line up for another choke according to
instructions received.
3 • Co-ordinate restart of operations with 2 • Give appropriate instructions and co-ordinate
Supervisor. restart of operations with Driller.
2 • Stop pump when requested by Supervisor and 5 • Identify the problem and take correct action.
line up for another choke according to
instructions received.
3 • Co-ordinate restart of operations with 2 • Give appropriate instructions and co-ordinate
Supervisor. restart of operations with Driller.
(8) 10. Monitor circulation (5) 10. BHP control since start up and
evacuation of initial influx
4 • Maintain kill pump rate, record pressures and 5 • Maintain correct bottom hole pressure before
monitor pit level. and while evacuating the influx until mud
returns are re-established.
4 • Advise Supervisor regularly during circulation.
(4) 11. After evacuation of gas (10) 11. After evacuation of initial influx
3 • Stop pump while shutting the well in, in co- 3 • Shut the well in, in co-ordination with Driller
ordination with Supervisor. maintaining BHP constant.
1 • Inform Supervisor when pump is stopped. 2 • Check pressure and interpretation of gauge
readings.
5 • Explain how to continue with the circulation.
(5) 12. Overall influx