This example demonstrates the calculations and the steps of the stripping with volumetric control so it will help you understand about what calculations
required are and how to perform the stripping with volumetric control.
Gas kick at the bottom but the drillstring is out of bottom. The kick is introduced while pulling out of hole and the following information below is the well
information.
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 1/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
The decision is made to strip to the bottom. Safety Factor and Pressure Increment are 100 psi.
Kick Height
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 2/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
Gas migration rate, fph = (Rate of increase in casing pressure, psi/hr) ÷ (0.052 x MW)
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 3/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
Mud Increment
Where;
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 4/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
1. We determine the Safety Factor (SF), Pressure Increment (PI) and Mud Increment (MI) as per the calculated shown in the above section
2. Strip into the well until the casing pressure increase is equal to Safety Factor (SF) + Pressure Increment (PI) which is 200 psi. At this stage, the
overbalance is 200 psi (100 + 100) and there is no bleeding back volume. From this example, we strip 2 stands to reach this point.
Drillstar Z-Reamer
Advanced Compact Underreamer
Innovative underreamer for lower hole
opening and reaming while drilling costs
drillstar-industries.com
OPEN
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 5/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
3. Hold casing pressure constant and bleed off fluid volume while stripping in hole. For this step, we need track the actual volume bled back which is
equal to volume bled off minus pipe displacement.
Let’s take a look at Figure 6, the stand#3 bleeds 2 bbl and the metal displacement is 2.3 bbl. Therefore, you will have only 1.7 bbl of mud bled off. The
overbalance reduces to 192 psi because 1.7 bbl of mud is out of the wellbore. You need to strip in until the total bled minus total stripped is equal to 22 a
target mud increment which is 22.3 bbl.
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 6/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
Figure 7 – Bleed off while stripping until the mud increment is reached.
According to Figure 7, you need to strip a total of 12 stands in order to reach the target MI at 22.3 bbl and this point will have only 100 pis over balance.
4. Strip in a shut in well until the safety factor is reach. At this example, we strip in to get additional 100 psi so the casing pressure will be 700 psi and
the overbalance is 200 psi.
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 7/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
Figure 10 – Strip in a shut in well until 100 psi is reached (700 psi surface pressure)
5. We will continue step#3 and step#4 until the drillstring reaches the bottom or the desired depth. Then you can carry on the conventional well control
methods as driller’s method, wait and weight etc.
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 8/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 9/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
0
Shares
About DrillingFormulas.Com
Working in the oil field and loving to share knowledge.
View all posts by DrillingFormulas.Com →
« Down Hole Video Camera – Amazing To See How Actual Oil & Gas Wells Directional Drilling Disaster ? »
Look Like
Leave a reply
Comment
Name *
Email *
Website
Post Comment
This site uses Akismet to reduce spam. Learn how your comment data is processed.
Categories
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 10/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
Select Category
email address
Click Here
Search on Drillingformulas.com
Search
Custom Search
Drillingformulas.com on Facebook
Drillingformulas.…
344 K mentions J’aime
2 amis aiment ça
OilfieldPix.com
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 11/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
Oilfield Acronyms
Recent Comments
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 12/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 13/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 14/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 15/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 16/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 17/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 18/19
02/04/2020 Stripping with Volumetric Control Steps and Example Calculations - Drilling Formulas and Drilling Calculations
www.drillingformulas.com/stripping-with-volumetric-control-steps-and-example-calculations/#more-5636 19/19