You are on page 1of 6

06/05/2020 Mechanical Blind Back Off Drill String and Tubular - Drilling Formulas and Drilling Calculations

About This Blog Contact Us Privacy Policy

 MENU

SPONSORED SEARCHES
drilling rig blind hole drilling drill pipe

shing tools drilling casing drilling downhole drilling

Mechanical Blind Back Off Drill String and Tubular


By DrillingFormulas.Com | July 12, 2013 - 3:40 pm |Drilling Operation

 Post Views:2,581

Mechanical blind back off is the procedure to intentionally break out stuck drill string by applying left hand torque and transmitting down hole. This is
the last method to recover drill string because back-off position cannot exactly determine. One situation that I used to do the blind back of is when the
perforating gun cannot be run into tubing string.

Procedure to Perform Blind Back Off Operation

1. Determine drilling parameters prior to get stuck if possible.

Pick up weight __ lb

Slack off weight __ lb

www.drillingformulas.com/mechanical-blind-back-off-drill-string-and-tubular/ 1/6
06/05/2020 Mechanical Blind Back Off Drill String and Tubular - Drilling Formulas and Drilling Calculations

Rotating weight __ lb

I N S C R I V E Z-VO U S
MAINTENANT

2. Pick up drill string at 10% over the rotating weight. Apply 50% of make-up torque with left hand turn and lock TDS. Record how many turns. Slowly
work string down for 5-10 minutes to transmit surface torque to the bottom. Weight while working should be between pick-up and slack off weight.

3. Repeat step#2 with 70%, 90%, 100%, 110% make up torque

4. The string should be back off while working down.

Note: The concept is to have overpull tension applied at each connection while left hand torque is transmitted into the drillstring. Once the drill string is
worked, the torque will be transferred to the bottom connection of the well.

www.drillingformulas.com/mechanical-blind-back-off-drill-string-and-tubular/ 2/6
06/05/2020 Mechanical Blind Back Off Drill String and Tubular - Drilling Formulas and Drilling Calculations

Pipeline cleaning Margin of Overpull in Danfoss iSave ERDs Introduction to Drilling


equipment - Drillstring Hydraulics
Intelligent Pigging

Ad mempce.com drillingformulas.com Ad FreshWind Oy drillingformulas.com

Hydraulic, Pneumatic, How To Free Stuck What are Drilling Drill Collar Weight
Mechanic - Ship Pipe (Oil eld) Jars? Calculation To Prevent
electric systems Drill Pipe Buckling

Ad hydro-works.net drillingformulas.com drillingformulas.com drillingformulas.com

Share the joy


5

0
Shares

Tagged Blind Back Off, drilling operation, Mechanical Blind Back Off. Bookmark the permalink.

About DrillingFormulas.Com
Working in the oil field and loving to share knowledge.
View all posts by DrillingFormulas.Com →

« Fishing Drill Pipe Procedure – Screw in Drill Pipe Free Promotion Download Well Control Quiz Book: Kick Detection (Warning
Sign) and Shut In »

One Response to Mechanical Blind Back Off Drill String and Tubular

NTEH SIXTUS OKANA NOVEMBER 27, 2014 AT 6:33 AM

I am loving this site by the Days, because i fine so many drilling and general petroleum solutions for my problems.

Reply

Leave a reply

Default Comments (1) Facebook Comments


Your email address will not be published. Required fields are marked *

Comment

Name *

Email *

Website

www.drillingformulas.com/mechanical-blind-back-off-drill-string-and-tubular/ 3/6
06/05/2020 Mechanical Blind Back Off Drill String and Tubular - Drilling Formulas and Drilling Calculations

Post Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Categories

Select Category

Get Drilling Formulas Sheet For Free

Subscribe to Get Free Calculation Sheet

email address

Click Here

Search on Drillingformulas.com

Search

Custom Search

Well Control One Page

Drillingformulas.com on Facebook

www.drillingformulas.com/mechanical-blind-back-off-drill-string-and-tubular/ 4/6
06/05/2020 Mechanical Blind Back Off Drill String and Tubular - Drilling Formulas and Drilling Calculations

Drillingformulas.…
344 K mentions J’aime

J’aime cette Page

2 amis aiment ça

OilfieldPix.com

Oilfield Acronyms

Recent Comments

DrillingFormulas.Com on Effect of Frictional Pressure on ECD while Forward Circulation

DrillingFormulas.Com on Effect of Frictional Pressure on ECD while Forward Circulation

DrillingFormulas.Com on What are differences between Full Opening Safety Valve (TIW valve) and Inside BOP valve (Gray Valve)?

AKHI on Effect of Frictional Pressure on ECD while Forward Circulation

Gary Holmes on Calculate Annular Capacity

www.drillingformulas.com/mechanical-blind-back-off-drill-string-and-tubular/ 5/6
06/05/2020 Mechanical Blind Back Off Drill String and Tubular - Drilling Formulas and Drilling Calculations

Drilling Formulas and Drilling Calculations | Powered by Mantra & WordPress.

www.drillingformulas.com/mechanical-blind-back-off-drill-string-and-tubular/ 6/6

You might also like