Professional Documents
Culture Documents
• 3 Stage
17.1/2’’ Hole
• 4 Stage Isolation
13.3/8’’ Csg
• 5 Stage(liner)
12.1/4’’ Hole
Intermediate
Isolation 9.5/8’’ Csg
Hoisting
Systems
Mud pumps
Power System
1. Power System
2. Hoisting System
3. Circulating System
4. Rotary System
5. Well-Control System
6. Well-Monitoring System
As per Section 135 of the Companies Act, 2013, every company which has a net worth of
Rs.500 Cr or a turnover of Rs.1000 Cr, needs to spend at least 2% of its average net profit.