The purpose of the Project Assessment and Authorization process is to appropriately inform, request administrative authorization and assess the feasibility of a proposed
project prior to committing College funds, resources or seeking external support. The President/VP’s will review the assessment documentation and determine whether
any adjustments to the project are necessary. All projects for the repair, alteration, modification and remodel of any facilities estimated to cost more than $5,000 and all
new uses of College land and the installation of any sculptures, monuments, artwork, memorials or any other site features will be reviewed and approved by the
President/VP’s prior to being presented to or discussed by advisory groups, prospective donors, or any other organization outside Fort Lewis College. The following
information and authorizations are needed in order to commit College resources and to provide appropriate coordination.
Project Information:
Requesting Individual: Dept.:
Department Head (signature required): ___________________________________________ Date: _____________
Dean/Director (signature required): _____________________________________________ Date: _____________
President’s Direct Report (signature required): ____________________________________ Date: _____________
Project Cost Estimate: $
Project Type: Space Remodeling Change of Use/Classification Exterior Site Work or Features
(Check all that apply) New Structure or Facility Building Addition Other Construction
Proposed Schedule: (mm/yy) Start Finish
Initial Planning
Fundraising
Design
Construction
Proposed Source of Funds (Select all that apply. For Department funds, identify source orgn and account):
Dept. Funds Institutional Funds
Grant Funds Gift Funds
Other
The original (with all required signatures) of this completed form and attachments must be submitted to the Project Management Office in Physical
Plant prior to being presented to the President/VP’s for review of approval.
***************************************************************************************************************
President/VP’s Review – Authorization to Proceed with Planning:
Approved copies will be forwarded to the Requesting Individual, Dean, Director and Director of PPS.