As informed by the Group, the commercial operations of the proposed expansion project is
expected during July 2020 (for next academic session). The Group has already constructed 3
floors and waiting for funds for further construction.
M/s. Central Bank of India had requested ITCOT to submit a proposal for Assessment of
Technical Aspects, Project cost, Contract agreements & Lenders Independent Engineer (LIE )
for establishing expansion project at S.G. Highway, Ahmedabad.
After Zero date of commissioning the LIE study, ITCOT shall monitor the Project
implementation on behalf of the Lenders and evaluate the investment made at every
stage as submitted by the Group/ Contractors;
Phase I shall commence from the date of appointment of the LIE and shall continue till
submission of required report.
Phase II shall commence from present status of construction and shall continue till completion of
the project.
a) Assess the status of various clearances, statutory approvals and licenses to be obtained by the
Group for commissioning of the project.
b) Vetting of the estimated project cost with BOQ and other related documents.
c) Assess fund utilization to the expenditure actually incurred vis-à-vis the amount certified by
statutory auditors.
d) Source & Utilisation of funds towards the project implementation.
e) Report on the physical progress, funds invested vis-à-vis Implementation Schedule
f) Assess the status of contract entered by the Group for implementation of the project
g) Any other specific inputs required by the banks.
h) Specific Problems or issues faced and resaons thereof
a) The LIE shall review the projected construction programme, expenditure schedule and adequacy
of the arrangements made at the site to achieve the projected construction schedule on a
quarterly basis.
b) The LIE shall certify the capital cost incurred. The LIE shall carryout spot verification of the
quality of the construction work vis-à-vis approved specifications, if required.
c) The LIE shall carryout assessment of variation in orders;
d) The LIE shall review the status of necessary approvals, permits, licenses, notifications, Project
completion certificates, etc. as may be required by the Group for completion and handing over.
e) Identification and certification of cost overruns, if any. Comments on time over runs, if any.
In addition to the aforesaid, the scope of services of the LIE would include advising the Lender on
all technical matters in order to protect the Lender’s interest under the financing documents,
Project development agreement and all other Project documents.
3.0 Assessment of Technical Aspects of the Project, Project cost, EPC contract
ITCOT will submit the assessment report on the technical aspects of the project and evaluate the
project cost of the Education Project (under expansion). The Report would typically consist:
Technical aspects of the Project –Description of salient features of the Education Project.
Description of Infrastructure of the project ( Land, Civil works & Utilties etc)
Estimate the cost of the project by evaluating the contracts/documents submitted.
Statutory approvals which will establish the Clearances / Approvals for the project.
Summary of Bank sanction tickets, with regard to
Pre disbursement conditions
Draw Down Schedule.
Project COD
Security
Implementation Schedule
Structure
Plastering
Painting/Polishing
Flooring/Cladding
Toilets
Doors & Windows
Electrical
Plumbing
Firefighting
Lifts
Back-up Generator & Rain water harvesting
Telephone with Intercom Facility
Amenties, if any
Advising the Group on possible problems and delays that may arise in future, to ensure
timely action to prevent the problem;
Reviewing quality control procedures and reports;
Reviewing change orders to the Contract and informing client of the amount of change
order(s) and its status.
Conclusions and Recommendations
4.0 PREREQUISITES
The following information and documents have to be made available by the Lenders and project
promoters wherever appropriate.
This is only an indicative and detailed one shall be made available to Lenders / project promoters
upon receipt of the work order / letter of appointment.
All professional fees are payable to ‘ITCOT Consultancy and Services Limited’ by Cheque /DD
and is payable at Chennai.
7.1.2 The Registered Office of the company is located at 50-A, Greams Road, Chennai, 600 006.
ITCOT has branch offices in Delhi, Mumbai, Kolkata, Ahmedabad, Hyderabad and Bangalore.