Professional Documents
Culture Documents
LLC
Preventive Maintenance System Version 1.0
SWIVEL:-
Record and monitor Number of Hours on Wash Pipe Packing use.
Change wash pipe packing every after 450-500 hrs of use.
Grease wash pipe packing every drillers shift of 12 hrs.
Check and top up oil.
DAILY
-Ensure proper function of rams and inspect hydraulic system
-Check for general condition and cleaniness
-Check for any hydraulic leak
DAILY
DAILY
(WEEKLY)
- Thoroughly wash the spinner with rig soap and brush after each trip.
- Inform Ch. Mech. to carry out maintenance.
- After each trip inspect safety cables and hanger springs.
DAILY
DAILY
-Check liner cooling system is clean and check spray system working properly.
- Check Pulsation dampner pressure.
- Check for any abnormal noise.
WEEKLY
-Check and clean the suction and discharge strainers.
COMMENTS