Professional Documents
Culture Documents
30
Sand backfill
7.00
1.50
0.60
0.70
4.80
Bar Schedule
Bar A D20 at 75 mm o.c.
Bar B D20 at 150 mm o.c.
Bar C D20 at 300 mm o.c.
Bar D D20 at 100 mm o.c both ways
Bar E D20 at 100 mm o.c. both ways
Bar E