PROGRESS ON CORPORATE ACTION PLANS – 1st QUARTER – 2018

Progress on cooperate action plan of M&E activities in 1st quarter as follows,

Kandy East
1. Supply and installation of chemical dozing system at Arattana WSS - Document evaluation
2. Supply and installation of booster pumps at Anuragama H/L, Field 3 and Field 4 – Tender calling
3. Supply and installation of VFD for pressure booster pumps at Balagolla WTP - Document preparation
4. Supply of machineries for Ground water section - Document preparation

Kandy South
1. Madarangoda system improvement – Document evaluation
2. Replacing of Angunawala pumps – Temporary hold
3. Supply and installation of Harmonic filter at KSWTP – Document preparation
4. Supply and installation of a solar panel system at Meewathura DE office – Document preparation
5. Supply and installation of chlorinator system at Maskeliya WSS - To be commissioned

Kandy North
1. Supply and installation of a new pump at A4 pump set (Yatiwawala) at GKWTP – Tender to be called
2. Supply and installation of solar power system for GKWTP - – Document preparation
3. Supply and installation of Harmonic filter at GKWTP – Document preparation