WATR

09/30/2022 to 09/29/2023
SherkoleTsore Bambassi Refugee Camps
BPRM/Bureau of Population, Refugee and Migration – US Department of State
(BPRM)
GB853
HEEH
WASH
Hayat Jemal Mohammed

WASH - YEAR 1 - SPENDING PLAN


Description
Equipments
Switch boards 22kw (one for Sherkole and one for Bambasi)
Mechanical tool box (one for each camp: Sherkole, Bambasi & Tsore)

Deep Meter - 200 meters (one for each camp: Sherkole, Bambasi & Tsore)
Submersible pump for Bambasi BH 7- 22KW
Surface pump 37kw for Bambasi water treatment station
Submersible pump for Tsore 15kw
Generator 15 -25 KVA for Sherkole
Sherkole
Objective 1: Supply of potable water increased or maintained
Output 1: Water System Constructed/Rehabilitated
Activity 1: Hydrogeological study & borehole and drilling
Service Contract - study and drilling
Activity 2: Rehabilitation of BH (Well development, pump test and installation
of submersible pump)- New Homosha & BH#2
Service Contract - with drilling company
Activity 3: Rehabilitation of Shallow boreholes for Host community
Materials / Consumables
Labor for hand pump installation and well head construction

Activity 4: Solarization of existing Diesel operated Water Sources (river system


in year 1, New Homosha borehole in year 2, new BH to be drilled in year 3 )
Materials / Consumables
Labor for Installations
Activity 6: Back up water treatment construction for the river system
Materials / Consumables
Labor for Construction
Activity 7: Rehabilitation of existing old Water points - including extension
pipes
Materials/Consumables
Labour cost
Activity 8: Construction of Valve chambers
Materials/Consumables
Labour cost
Activity 10: Raising the existing pioneer tank seat for existing 110M3 to a
height of 1.5m - to increase the head at water points
Materials/Consumables
Labour cost
Activity 11: Pressure line for Sherkole treatment plant expansion
Materials/Consumables
Labour cost
Activity 12: Overhaul maintenance of existing generators
Materials / Consumables
Labor cost for Installation
Activity 13: Chlorine Dosing Pump for online chlorination
Materials

Out put 2: Operation and maintenance of motorized water supply systems


Activity 1: Fuel and Generator supplies
Materials/Consumables (Fuel for Generator)
Labor cost for loading and offloading of fuel barrels
Activity 2: Lubricants for Generator
Materials/Consumables (Lubricants for Generator)
Activity 3: Water quality Chemicals for Sherkole
Materials/Consumables
Out put 3 Capacity Building
Activity 1: One - day refreshment trainings for Assistance Water Technicians &
Plumber
Materials / Consumables
Per Diem for participants
Service Contract- refreshment
Service Contract- Hall rent
Activity 2: One - day refreshment water system guards & water system care
takers on operation and maintenance
Materials / Consumables
Service Contract- refreshment
Refugee labor WATER
Labor Cost
Shipping and Cargo
Service Contract- Transportation
Objective 2: Population lives in satisfactory conditions of sanitation and
hygiene
Out put 1 :Construction and maintenance of sanitation facilities
Activity 1: Construction of new family latrines
Materials / Consumables
Labor cost
Activity 2: Maintenance of family latrines
Materials / Consumables
Labor cost
Activity 3: Decommissioning/Maintenance of filled latrines
Materials / Consumables
Labor cost
Activity 4: Septic tank construction for communal Slaughter house
Materials / Consumables
Labor cost

Activity 5: Backfilling /Burring/ of full and non functional communal waste pits
Labor Cost

Out put 2: Capacity Development on Sanitation and Hygiene promotion


Activity 1: Refresher training for EHA's on Children's Hygiene & Sanitation
Training (CHAST) approach
Materials / Consumables
Service Contract refreshment & Lunch
Activity 2: Refresher training to EHAs on Community Hygiene Club (CHC)
approaches
Materials / Consumables
Service Contract refreshment & Lunch
Activity 3: Training of artesian on construction three days
Materials / Consumables
Service Contract refreshment & Lunch
Activity 4: Three days training to School Girls Club on Menstrual Hygiene
Management to Host Community Schools nearby refugees
Materials / Consumables
Service Contract refreshment & Lunch
Activity 5: Refreshment training for national SHP staff on basics of HP
approach –(CHAST , CHC &PHAST)
Materials / Consumables
Service Contract refreshment & Lunch
Out put 3: Monitoring and Assessments
Activity 1: Monitoring of filling rate of latrines
Materials / Consumables
Per Diem for participants
Service Contract
Activity 2: Conduct KPC survey
Materials / Consumables
Per Diem for participants
Service Contract
Out put 3 :Social Behavior Change Communication (SBCC) and Hygiene
Promotion
Activity 1: Bi-Weekly Sanitation Campaigns
Materials / Consumables
Service Contract
Activity 2: Celebrate Special Events
Materials / Consumables
Service Contract
Activity 3: Production and installation of Bill boards with key sanitation and
hygiene messages
Materials / Consumables
Service Contract

Activity 4: Production of banners with key sanitation and hygiene messages


Service Contract

Activity 5: Production of Posters with key sanitation and hygiene messages


Service Contract
Supplies for EHAs, Cleaners and Incentive guards
Materials / Consumables
Supplies for CHC
Materials / Consumables
Service Contract
Refugee labor -SAN
Labor Cost
Tsore
Output 1: Water System Constructed/Rehabilitated
Activity 1: Pipe line Connection of Tsore reservoir to Zone A area
Materials / Consumables
Labor cost for Installation
Activity 2: Valve chamber Construction
Materials / Consumables
Labor cost for Construction
Activity 3: Fencing compound at reservoirs & BH to deter entrance of animals
and children
Materials / Consumables
Labor cost for Construction
Activity 6: Chlorine Dosing Pump for online chlorination
Materials

Out put 2: Operation and maintenance of motorized water supply systems


Activity 1: Fuel and Generator supplies
Materials/Consumables (Fuel for Generator)
Labor cost for loading and offloading of fuel barrels
Activity 2: Lubricants for Generator
Materials/Consumables (Lubricants for Generator)
Activity 3: Water quality Chemicals for Tsore
Materials/Consumables
Out put 3 Capacity Building
Activity 1: One - day refreshment trainings for Assistance Water Technicians &
Plumber
Materials / Consumables
Per Diem for participants
Service Contract- refreshment
Service Contract- Hall rent
Activity 2: One - day refreshment water system guards & water system care
takers on operation and maintenance
Materials / Consumables
Service Contract- refreshment
Refugee labor WATER
Labor Cost
Shipping and Cargo
Service Contract- Transportation
Objective 2: Population lives in satisfactory conditions of sanitation and
hygiene
Out put 1 :Construction and maintenance of sanitation facilities
Activity 1: Construction of new family latrines
Materials / Consumables
Labor cost
Activity 2: Maintenance of family latrines
Materials / Consumables
Labor cost
Activity 3: Decommissioning/Maintenance of filled latrines
Materials / Consumables
Labor cost
Activity 4: Septic tank construction for communal Slaughter house
Materials / Consumables
Labor cost

Activity 5: Backfilling /Burring/ of full and non functional communal waste pits
Labor Cost

Out put 2: Capacity Development on Sanitation and Hygiene promotion


Activity 1: Refresher training for EHA's on Children's Hygiene & Sanitation
Training (CHAST) approach
Materials / Consumables
Service Contract refreshment & Lunch
Activity 2: Refresher training to EHAs on Community Hygiene Club (CHC)
approaches
Materials / Consumables
Service Contract refreshment & Lunch
Activity 3: Training of artesian on construction three days
Materials / Consumables
Service Contract refreshment & Lunch
Activity 3: Three days training to School Girls Club on Menstrual Hygiene
Management to Host Community Schools nearby refugees
Materials / Consumables
Service Contract refreshment & Lunch
Activity 5: Refreshment training for national SHP staff on basics of HP
approach –(CHAST , CHC &PHAST)
Materials / Consumables
Service Contract refreshment & Lunch
Out put 3: Monitoring and Assessments
Activity 1: Monitoring of filling rate of latrines
Materials / Consumables
Per Diem for participants
Service Contract
Activity 2: Conduct KPC survey
Materials / Consumables
Per Diem for participants
Service Contract
Out put 3 :Social Behavior Change Communication (SBCC) and Hygiene
Promotion
Activity 1: Bi-Weekly Sanitation Campaigns
Materials / Consumables
Service Contract
Activity 2: Celebrate Special Events
Materials / Consumables
Service Contract
Activity 3: Production and installation of Bill boards with key sanitation and
hygiene messages
Materials / Consumables
Service Contract

Activity 4: Production of banners with key sanitation and hygiene messages


Service Contract

Activity 5: Production of Posters with key sanitation and hygiene messages


Service Contract
Supplies for EHAs, Cleaners and Incentive guards
Materials / Consumables
Supplies for CHC
Materials / Consumables
Service Contract
Refugee labor -SAN
Labor Cost
Tsore New

Out put 2: Operation and maintenance of motorized water supply systems


Activity 1: Fuel and Generator supplies
Materials/Consumables (Fuel for Generator)
Labor cost for loading and offloading of fuel barrels
Activity 2: Lubricants for Generator
Materials/Consumables (Lubricants for Generator)
Activity 3: Water quality Chemicals for Tsore
Materials/Consumables
Out put 3 Capacity Building
Activity 1: One - day refreshment trainings for Assistance Water Technicians &
Plumber
Materials / Consumables
Per Diem for participants
Service Contract- refreshment
Service Contract- Hall rent
Activity 2: One - day refreshment water system guards & water system care
takers on operation and maintenance
Materials / Consumables
Service Contract- refreshment
Refugee labor WATER
Labor Cost
Shipping and Cargo
Service Contract- Transportation
Objective 2: Population lives in satisfactory conditions of sanitation and
hygiene
Out put 1 :Construction and maintenance of sanitation facilities
Activity 1: Construction of new family latrines
Materials / Consumables
Labor cost
Activity 2: Communal cloth washing basin
Materials / Consumables
Labor cost

Out put 2: Capacity Development on Sanitation and Hygiene promotion


Activity 1: Refresher training for EHA's on Children's Hygiene & Sanitation
Training (CHAST) approach
Materials / Consumables
Service Contract refreshment & Lunch
Activity 2: Refresher training to EHAs on Community Hygiene Club (CHC)
approaches
Materials / Consumables
Service Contract refreshment & Lunch
Activity 3: Training of artesian on construction three days
Materials / Consumables
Service Contract refreshment & Lunch
Activity 4: Three days training to School Girls Club on Menstrual Hygiene
Management to Host Community Schools nearby refugees
Materials / Consumables
Service Contract refreshment & Lunch
Activity 5: Refreshment training for national SHP staff on basics of HP
approach –(CHAST , CHC &PHAST)
Materials / Consumables
Service Contract refreshment & Lunch
Out put 3: Monitoring and Assessments
Activity 1: Monitoring of filling rate of latrines
Materials / Consumables
Per Diem for participants
Service Contract
Activity 2: Conduct KPC survey
Materials / Consumables
Per Diem for participants
Service Contract
Out put 4 :Social Behavior Change Communication (SBCC) and Hygiene
Promotion
Activity 1: Bi-Weekly Sanitation Campaigns
Materials / Consumables
Service Contract
Activity 2: Celebrate Special Events
Materials / Consumables
Service Contract
Activity 3: Production and installation of Bill boards with key sanitation and
hygiene messages
Materials / Consumables
Service Contract

Activity 4: Production of banners with key sanitation and hygiene messages


Service Contract

Activity 5: Production of Posters with key sanitation and hygiene messages


Service Contract
Supplies for EHAs, Cleaners and Incentive guards
Materials / Consumables
Supplies for CHC
Materials / Consumables
Service Contract
Refugee labor -SAN
Labor Cost
Bambasi
Output 1: Water System Constructed/Rehabilitated
Activity 1: Rehabilitation of BH (Well development, pump test and installation
of submersible pump)- BH#5
Service Contract - with drilling company

Activity 2: Conduct study to locate Feasible intake site including design of the
treatment plant
Service Contract - Consultant
Activity 5: Reservoir 2 pcs of 10M3 capacity for Zone A
Materials / Consumables
Labor cost for Installation
Activity 6: Connection of Bambasi Zone A with alternative pipe line
Materials / Consumables
Labor cost for Installation

Activity 7: Replacement of existing distribution/pressure line with HDPE pipe


Materials / Consumables
Labor cost for Installation
Activity 8: Fencing compound at reservoirs & BH to deter entrance of animals
and children B#7
Materials / Consumables
Labor cost for Construction
Activity 9: Generator/Guard House - BH#7
Materials / Consumables
Labor cost for Installation
Activity 10: Overhaul maintenance of existing generators
Materials / Consumables
Labor cost for Installation
Activity 12: Installation of water meters and gate valves at existing water
points
Materials / Consumables
Labor cost for Installation
Activity 13: Chlorine Dosing Pump for online chlorination
Materials

Out put 2: Operation and maintenance of motorized water supply systems


Activity 1: Fuel and Generator supplies
Materials/Consumables (Fuel for Generator)
Labor cost for loading and offloading of fuel barrels
Activity 2: Lubricants for Generator
Materials/Consumables (Lubricants for Generator)
Activity 3: Water quality Chemicals for Bambassi
Materials/Consumables
Out put 3 Capacity Building
Activity 1: One - day refreshment trainings for Assistance Water Technicians &
Plumber
Materials / Consumables
Per Diem for participants
Service Contract- refreshment
Service Contract- Hall rent
Activity 2: One - day refreshment water system guards & water system care
takers on operation and maintenance
Materials / Consumables
Service Contract- refreshment
Refugee labor WATER
Labor Cost
Shipping and Cargo
Service Contract- Transportation
Objective 2: Population lives in satisfactory conditions of sanitation and
hygiene
Out put 1 :Construction and maintenance of sanitation facilities
Activity 1: Construction of new family latrines
Materials / Consumables
Labor cost
Activity 2: Maintenance of family latrines
Materials / Consumables
Labor cost
Activity 3:Decommissioning/Maintenance of filled latrines
Materials / Consumables
Labor cost
Activity 4: Septic tank construction for communal Slaughter house
Materials / Consumables
Labor cost

Activity 5: Backfilling /Burring/ of full and non functional communal waste pits
Labor Cost

Out put 2: Capacity Development on Sanitation and Hygiene promotion


Activity 1: Refresher training for EHA's on Children's Hygiene & Sanitation
Training (CHAST) approach
Materials / Consumables
Service Contract refreshment & Lunch
Activity 2: Refresher training to EHAs on Community Hygiene Club (CHC)
approaches
Materials / Consumables
Service Contract refreshment & Lunch
Activity 3: Training of artesian on construction three days
Materials / Consumables
Service Contract refreshment & Lunch
Activity 4: Three days training to School Girls Club on Menstrual Hygiene
Management to Host Community Schools nearby refugees
Materials / Consumables
Service Contract refreshment & Lunch
Activity 5: Refreshment training for national SHP staff on basics of HP
approach –(CHAST , CHC &PHAST)
Materials / Consumables
Service Contract refreshment & Lunch
Out put 3: Monitoring and Assessments
Activity 1: Monitoring of filling rate of latrines
Materials / Consumables
Per Diem for participants
Service Contract
Activity 2: Conduct KPC survey
Materials / Consumables
Per Diem for participants
Service Contract
Out put 4 :Social Behavior Change Communication (SBCC) and Hygiene
Promotion
Activity 1: Bi-Weekly Sanitation Campaigns
Materials / Consumables
Service Contract
Activity 2: Celebrate Special Events
Materials / Consumables
Service Contract
Activity 3: Production and installation of Bill boards with key sanitation and
hygiene messages
Materials / Consumables
Service Contract

Activity 4: Production of banners with key sanitation and hygiene messages


Service Contract

Activity 5: Production of Posters with key sanitation and hygiene messages


Service Contract
Supplies for EHAs, Cleaners and Incentive guards
Materials / Consumables
Supplies for CHC
Materials / Consumables
Service Contract
Refugee labor -SAN
Labor Cost

Totals
Status Remark

Sherkole purchased /transportation PR r It is in A.A


Tsore purchased and storedand Bambasi butp where is it? Check at camp level and suply chain

Not purchased solomon?? For cost compusetion for tsore 15kw to 22 kw


re-aligned added to latrine construction
PR raised check status , husen
purchased /22kw at tsore store/cable at assosa why? Warehouse solomon discuss
purchased /transportation PR raised It is in A.A

Melaku took responsibility for ToR

we leaved the activity new homosha with small yield 2.2l/s


Not done

awarded to contractors need follow up /sharing agreement from FO supply chain

sand filter construction will held or not…RRS is requesting to do

will be done 3 wps

will be done 10 will be done


will be done document hold

re aligned done by RRS grant/cancelled

will be done routinely

re aligned

will be done routinely

purchased

Not done

conducted

Not conducted 20 plan

material PR raised 50 plan


Not done /PR raised 40 plan

PR raised

Not done 20 plan

Done 13 participant

Done 13 participant

Done 10 participants

Done 25 Girls

under plan may be at addis level

not done on process to start by HSP officer

as of august

done weekly routinely


world water day conducted

the budget is not sufficeint and the direction is given to maintain the existings ones

Not done

Not Done

PR raised and purchaseed

PR raised and purchaseed

Insentive monthly effected

Done with RRS, but not realigned asses need and apply/urgent!

Done 4 plan

Done

Canceled

will be done routinely

will be done routinely

purchased DPD1 remains


Not done

done

Insentive monthly effected

Not done /PR raised 30 PLAN

Not done/ Pr raised 50 plan

Not done /PR raised 30 plan

PR raised

Not done 10 plan

Done 15 participant

Done 15 participant
Done 35 participants

on preparation/under plan

Not done 2 round

as august

weeky conducting 10 plan

water day done

maintainace suggested 2 plan

Not Done

Not Done

Purchased

purchased

monthly payment
routine

routine

purchased DPD1 remains

not done

done

routine

not done pr not raised 50 plan

Not done

done

done

done
done 35 participants (20 old and 15 new Tsore)

under plan

not done/ under preparation

as of august

routine 10 plan

water day done

maintainace suggested

not done

not done

purchased

routine
PR raised and water interprise visited
site and they requested our generetor
for support, we agreed and discussion
with supply chain follow up needed/ check the contract is signed or not

Not done , melaku took responsibility to


prepare ToR and design

re aligned

re aligned

Not Done PR raised / eyerus

completed

completed there is 400,000 birr remains

routine

PR raised and material not deployed


from Addis

re aligned

routine

purcased DPD1 remains


not done

done

monthly payment

not done/realignment request 50 plan

PR raised 50 plan

PR raised 40 plan

PR raised

Not done 20 plan

done 20 participants

done 20 participants

done 10 participants
not done

under plan

under preparation
guard house

august

weekly conducting 10 plan

water day done

maintainace suggested

not done

not done

purchased

purchased

monthly payment
olomon discuss

assesmet check

assesmet check
Description
SHERKOLE
Activity 7: Rehabilitation of existing old Water points - including extension pipes
Activity 8: Construction of Valve chambers
Activity 1: One - day refreshment trainings for Assistance Water Technicians & Plumber
Activity 2: Maintenance of family latrines
Activity 3: Decommissioning/Maintenance of filled latrines
Activity 5: Backfilling /Burring/ of full and non functional communal waste pits
Activity 3: Production and installation of Bill boards with key sanitation and hygiene messages
Activity 4: Production of banners with key sanitation and hygiene messages
Activity 5: Production of Posters with key sanitation and hygiene messages
TSORE OLD
Activity 1: Pipe line Connection of Tsore reservoir to Zone A area
Activity 2: Valve chamber Construction
Activity 1: One - day refreshment trainings for Assistance Water Technicians & Plumber
Activity 2: Maintenance of family latrines
Activity 3: Decommissioning/Maintenance of filled latrines
Activity 5: Backfilling /Burring/ of full and non functional communal waste pits
Activity 3: Production and installation of Bill boards with key sanitation and hygiene messages
Activity 4: Production of banners with key sanitation and hygiene messages
Activity 5: Production of Posters with key sanitation and hygiene messages
TSORE NEW
Activity 1: One - day refreshment trainings for Assistance Water Technicians & Plumber
Activity 2: Communal cloth washing basin
Activity 3: Production and installation of Bill boards with key sanitation and hygiene messages
Activity 4: Production of banners with key sanitation and hygiene messages
Activity 5: Production of Posters with key sanitation and hygiene messages
BAMBASI
Activity 7: Replacement of existing distribution/pressure line with HDPE pipe
Activity 12: Installation of water meters and gate valves at existing water points
Activity 1: One - day refreshment trainings for Assistance Water Technicians & Plumber
Activity 2: Maintenance of family latrines
Activity 3:Decommissioning/Maintenance of filled latrines
Activity 5: Backfilling /Burring/ of full and non functional communal waste pits

Activity 4: Three days training to School Girls Club on Menstrual Hygiene Management to Host Community Schools nearby refu
Activity 3: Production and installation of Bill boards with key sanitation and hygiene messages
Activity 4: Production of banners with key sanitation and hygiene messages
Activity 5: Production of Posters with key sanitation and hygiene messages
Reponsible person Remark

will be done 3 wps assesmet check


will be done 10 will be donassesmet check
Not done Hussen 1
material PR raised 50 plan
Not done /PR raised 40 plan
Not done 20 plan
maintenace suggested
Not done
Not Done

Done with RRS, but not reali asses need and apply/urgent!
Done 4 plan
Not done
Not done/ Pr raised 50 plan
Not done /PR raised 30 plan
Not done 10 plan
maintainace suggested 2 plan
Not Done
Not Done

not done
Not done
maintainace suggested
not done
not done

Not Done
PR raised and material not deployed from Addis
not done
PR raised 50 plan
PR raised 40 plan
Not done 20 plan

not done
maintainace suggested
not done
not done
SN
A
1
2
3
4
5
6
7
8
9
B
1
2
3
4
5
6
7
8
9
C
1
2
3
4
5
D
1
2
3
4
5
6

7
8
9
10
Description
SHERKOLE
Rehabilitation of existing old Water points - including extension pipes
Construction of Valve chambers
One - day refreshment trainings for Assistance Water Technicians & Plumber
Maintenance of family latrines
Decommissioning/Maintenance of filled latrines
Backfilling /Burring/ of full and non functional communal waste pits
Production and installation of Bill boards with key sanitation and hygiene messages
Production of banners with key sanitation and hygiene messages
Production of Posters with key sanitation and hygiene messages
TSORE OLD
Pipe line Connection of Tsore reservoir to Zone A area
Valve chamber Construction
One - day refreshment trainings for Assistance Water Technicians & Plumber
Maintenance of family latrines
Decommissioning/Maintenance of filled latrines
Backfilling /Burring/ of full and non functional communal waste pits
Production and installation of Bill boards with key sanitation and hygiene messages
Production of banners with key sanitation and hygiene messages
Production of Posters with key sanitation and hygiene messages
TSORE NEW
One - day refreshment trainings for Assistance Water Technicians & Plumber
Communal cloth washing basin
Production and installation of Bill boards with key sanitation and hygiene messages
Production of banners with key sanitation and hygiene messages
Production of Posters with key sanitation and hygiene messages
BAMBASI
Replacement of existing distribution/pressure line with HDPE pipe
Installation of water meters and gate valves at existing water points
One - day refreshment trainings for Assistance Water Technicians & Plumber
Maintenance of family latrines
Decommissioning/Maintenance of filled latrines
Backfilling /Burring/ of full and non functional communal waste pits

Three days training to School Girls Club on Menstrual Hygiene Management to Host Community Schools nearby refugees
Production and installation of Bill boards with key sanitation and hygiene messages
Production of banners with key sanitation and hygiene messages
Production of Posters with key sanitation and hygiene messages
Amoun
Unit t Responsible person Remark

No 3 eyerus and solomon Mahlet's Delegates


No 10 eyerus and solomon
participant 1 Husen
No 50 eyerus and solomon
No 40 eyerus and solomon
No 20 eyerus and solomon
PC 2 Ayichew
PC 2 Ayichew
PC 20 Ayichew

eyerus and solomon Mahlet's Delegates


No 4 eyerus and solomon
participant 1 Husen
No 50 eyerus and solomon
No 30 eyerus and solomon
No 10 eyerus and solomon
pc 2 Ayichew
pc 2 Ayichew
pc 20 Ayichew

participant 1 Husen
No 2 eyerus and solomon
pc 2 Ayichew
pc 2 Ayichew
pc 20 Ayichew

m 1000 Eyerusalem
No 2 Eyerusalem
participant 1 Husen
No 50 Eyerusalem and Mustefa
No 40 Eyerusalem and Mustefa
No 20 Eyerusalem and Mustefa

participant 25 Mustefa
pc 2 Ayichew
pc 2 Ayichew
pc 20 Ayichew