You are on page 1of 5

CURRICULUM VITAE

BAPPA HALDAR
DOB: 13OCT 1986
MOB: +918670479671 , +919733728670
HOME: +918918144776
E-MAIL: bappa346@gmail.com / bappahaldar86@yahoo.in

RESIDANCE

VILL + PO: GOBRAPUR


PS- BONGAON
DIST- 24 PARGONAS NORTH
WEST BENGAL
INDIA 743251

PROFILE

FATHER’S NAME KARTIK HALDAR


MARITAL STATUS MARRIED
SPEAKING ENGLISH, HINDI, BENGALI

PASSPORT DETAILS

PASSPORT NO H 8770347
ISSUED DATE 17. 11. 2009
EXPIRED DATE 17. 11. 2019

WORK EXPERIANCE
12 YEARS 5 MONTHS

QUALIFICATION
HIGHER SECONDARY EDUCATION
TECHNICAL KEYS
ASNT LEVEL – 2 (UT, MT, PT, RT)

ASNT LEVEL- 2 PAUT & TOFD

PCN LEVEL - 2 UT (3.1 & 3.2) EXPIRED


PCN NO. - 321897

COMPUTER KNOWN
MS OFFICE BASIC, MICROSOFT WORD, EXEL

JOB RESPOCIBILTY AND EXPERIENCE

ULTRASONIC TESTING, MAGNETIC PARTICAL TESTING. LIQUID PANETRANT TESTING, RADIOGRAPHY


TESTING AND VEIWING,
APPORXIMATLY 13 YEARS WORKING ON THIS FIELD

PROJECT IN INDIA

ESSAR SALYA POWER PROJECT. (JAMNAGAR, GUJARAT)


ESSAR REFINERY LIMITED. (JAMNAGAR, GUJARAT)
AADANI POWER LIMITED. (MUNDRA, KUTCH, GUJARAT)
RELIENCE REFINERY. (JAMNAGAR, GUJARAT).
RENUKA SHUGAR MILL. (ADIPUR, GANDHIDHAM, GUJARAT)
KSK MAHANADI POWERPLANT,(CHATTISGARH)

WORK SHOPE IN INDIA


TEEMA INDIA LIMITED. (AACHAD, THANE, MAHARASTRA)
TEEMA INDIA LIMITED. (KHANVEL, SILVASSA, D & NH)
VIJAY TANKS & VESSELS LIMITED. (GANDHIDHAM, GUJARAT)

ABROAD EXPERIANCES

COOPERHEAT SAUDI ARABIA LTD.


SAUDI ARABIA, JUBAIL. (JANUARY 2012 TO MAY 2018)

WORKED DIFFARENT PLANT OF SABIC GROUP OIL AND GAS AND FARTILIZER SECTORS ON
SHOUTDOWN AND TOURNARROUND. SAUDI ARAMCO AUTHORISED CLIENT WORKSHOP
AND OIL FIELD AND SAUDI ARAMCO REFINERY AND PROJECT
EXPERIACE IN INDIA

DURATION EXPERIENCE

05 August 05, WORKED @ TEMA INDIA. LTD. ACHHAD, TALASARI, MAHARASHTRA,


TO 02 November 08 INDIA. & KHANVEL, SILVASSA, DADRA & NAGAR HAVELI, INDIA.

VARIUS PROJECT JOB IN THE FABRICATIION SHOP OF RADIOGRAPHY


TESTING AND INTERPRETATION.

20 November 08 ADANI POWER PROJECT,MUNDRA,GUJARAT, INDIA


TO 27 MARCH 09
ULTRASONIC TESTING ON POWER PIPING AND STRUCTURE

02 APRIL 09 TO 26 August 09 ESSAR SALAYA POWER PROJECT.


SALAYA,JAMNAGAR,GUJARAT, INDIA
ULTRASONIC TESTING OF COOLING WOTER PIPE LINE AND
STRUCTURE.

VIJAY TANKS & VESSELS LTD. FABRICATION SHOP, GANDHIDHAM,


GUJARAT, INDIA.

ULTRASONIC TESTING ON PLATE LAMINATION CHECKED. OF


DIFFARENT PROJECT.
02 September 09 , TO 15 January
10, RENUKA SUGAR FACTORY, GANDHIDHAM, GUJARAT, INDIA.

ULTRASONIC TESTING ON BOILER PIPING.

VIJAY TANKS & VESSELS LTD. FABRICATION SHOP, GANDHIDHAM,


GUJARAT, INDIA.
10 MARCH 10 , TO 27 November
10 , ULTRASONIC TESTING OF PLATE LAMINATION CHECKED VESSELS
JOINTS, TANK JOINTS, NOZZEL TO SHELL JOINTS, AND NOZZEL
JOINTS OF DIFFARENT PROJECT.
DURATION EXPERIENCE

RELIANCE IND GUJARAT JAMNAGAR WORKED AT MPI UTG PT IN


03 December 10, TO 20 February SERVICE LINE AT DTA WORK SHOPE .
11,

KSK POWER PROJECT. AKALTARA, BILSHPUR, CHATTISGARH, INDIA.

12 MARCH 11, TO 20 December ULTRASONIC TESTING ON COOLING WATER PIPING LINE AND
12 POWER PIPING

EXPERIANCES IN ABROAD

DURATION EXPERIENCE
SAMREF REFINERY , YANBU, SAUDI ARABIA.

13 January 12 to 30 January 12 WORKED ON SHUTDOWN UT , MT , PT

KEMYA REFINERY JUBAIL, SAUDI ARABIA.


1 February12 TO 3 March 12 WORKED AT TURNAROUND , SAFERAD , UT ,MT , PT

4 March 12 to 30 April 12 VARIUS PROJECT OF ARCC, PETRO KEMYA, NATCO


FAB SHOPE, JUBAIL, SAUDI ARABIA. MT , PT, UT &
RT
SAFCO FERTILIZER PLANT SHUTDOWN. JUBAIL
14 April to 28 may 2012 SAUDI ARABIA. WORKED ON UT, MT, PT

AR-RAZI PETROCHEMICAL PLANT SHUTDOWN.


2 June to 20 July 12 JUBAIL SAUDI ARABIA.
WORKED AT UT, MT. PT JOB
WORKED AT VARIUS PROJECT. IN ARCC FAB SHOP,
NATCO FAB SHOP. AND LIFE PLAT, IBN SINA, JOPC,
25 July 12 to 15 NOV 2013 APPC, UTT, MT, PT
SAMREF CLEAN FUEL PROJECT.

WORKED IN YANPET REFINERY,YANBU, SAUDI


FEB 07 2014 TO 10 MARCH 2014 ARABIA PETROCHEMICAL PLANT SHUTDOWN.UT,PT,
MT AUT ASSISTANT
MARCH 15 TO APRIL 19 . 2014 WORKING IN SAFCO IBB FERTILIZER PLANT SHOUT
DOWN, JUBAIL SAUDI ARABIA. UT , UTT , MT , PT

3 MAY TO 20 JULY 2014 WORKING IN SADARA SAUDI ARAMCO


REFINERYPROJECT PMI SPECTROGRAPHY.

21 JULY TO 28 SEP 2014 WORKING IN SADARA ARAMCO PROJECT , SAFERAD


RADIOGRAPHY

29 SEP TO NOV 5 2014 WORKING ON SPECIAL JOB AS UT,MT,PT, UTT IN


SAFCO IBB SHUTDOWN. JUBAIL, SAUDI

27 JAN TO 15 FEB 2015 WORKING IN NATPET SAUDI ARABIA , YANBU TURN


AROUND AS A MULTI TECHNICIAN UT, UTT , MT , PT
AND BOROSCOPY ASISTANT TECHNICIAN

A LONG VACATION DUE TO VISA PROSSES

WORKED AT DIFFARENT CLIENT IN JUBAIL


1 NOV 15 TO 23 FEB 2016 INDUSTREY AS A RADIOGRAPHY ASSISTANT
TECHNICIAN.
24 FEB TO 18 APRIL 2016 WORKED AT SAUDI ARAMCO , ABU ALI PIER SITE AS
AUT ASSISTANT
20 APRIL TO 30 JULY 2016 WORKED AT SAUDI ARAMCO DIFFERENT SITE
RADIOGRAPHY,MPI, PT AND AUT ASSISTANT
10 SEP 2016 TO 15 MAY 2017 WORKED AT SAUDI ARAMCO JAZAN REFINERY AND
PROJECT RADIOGRAPHY ON SAFERAD AND MT, PT,
SPECTROGRAPHY
10 JUNE CONTINUE 15 MAY 2018 KHURAIS SAUDI ARAMCO PROJECT AS UT, MT, PT,
PMI (SPECTROGRAPGY)

REGARDS DATE
BAPPA HALDAR

You might also like