GUEVARRA PIPING WORKS

CONSTRUCTION

COMPANY PROFILE
Historical Background

Guevarra Piping Works Construction was established In 2014, Which Is Focused In


Mechanical Works In Fire Protection, Chilled piping line ,Cooling pipe Line, Plumbing
And Process piping system. Its Very Hard To Fullfill His Dream To become a
Subcontractor Which Aims To Accept Small And In The Future Huge Project All Our
Skilled Workers Are Well Trained And With Certificates With Regards To Technical
Aspect Of Hands On Works.

Mission

The Main Objective Is To Provide The Maximum Quality Of Service To


Different Client In Lisp 1 Real Calamba ,Lisp 2 Cabuyao
,LiipBinan,LagunaTechnoparkStaRosa,CpipBatino,FpipStoTomas,Carmelray
1,Canlubang,Carmelray 2 Tulo, Calamba With A Continuity.

With A Continous Growth Of Demand In Different Company Related In


Mechanical Engineering Works That Push Him

To built This Business,Plus The Interest That Boost His Confidence In Handling
And Accepting The Challenge.

Deep Passion,Dedication,Positive Working Attitude Is Our Secret Formula For


Maintaining This Firm.

We Have A Complete Sets Of Tools And Equipment That Can Accommodate


Series Of Activities And We Established Our

Research And Development Near Our Fabrication Area To Enhanced ,Develop


And Maximize Their Ability To Excellence And To Maintain Productivity.We Also
Have Fabrication Area And Shop To Accept All Clients Concerned.

email add.; leojo.javier@yahoo.com.ph/dimapilisleopoldo2018@yahoo.com

Contact No.; (049) 544-9866/Sun ; 09438159188/ TM.;09056875275


Here are some mechanical and piping experienced of the owner of GPWC . He has a deep
experienced regarding from this kind of field.

AUG,. 08,2016 UP TO Aug.08,2017 PIPING SUPERVISOR


PROJECT; JRTP
SEJONG
JIZAN SAUDI ARABIA

AUG. 15, 2014 SEPT. 19,2015 PROJECTENGINEER (PIPING)


PROJECT; PIPING EXTENSION
PROJECT HICAP,STA ROSA LAGUNA
WEL CONTRACTING CORPORATION

NOV. 16, 2013 TO MAY 16,2014 PIPING SUPERVISOR


PROJECT; RMP-2 PROJECT PETRON BATAAN
DAELIM
LIMAY BATAAN

NOV. 2012 TO SEPT. ,2013 PIPING SUPERVISOR


PROJECT; RMP-2 PROJECT PETRON BATAAN
SUNGDO
LIMAY BATAAN

Oct. 11, 2011 – Oct. 11,2012 PIPING ENGINEER


PROJECT; HADEED STEEL MAKING
AL RUSHAID CONSTRUCTION COMPANY
JUBAIL SAUDI ARABIA

Mar. 08, 2010 – Jul. 11, 2011 PROJECT SITE ENGINEER


PROJECT; AUTOMATIC FIRE SUPRESSION
SYSTEM OF NESTLE PHIL.-NDC. BULACAN
ABTELCOM ENTERPRISES
MALHACAN MEYCAUAN BULACAN

Apr. 03, 2008 –MAY. 10, 2009 PROJECT SITE ENGINEER


PROJECT; MECHANICAL INSTALLATION OF
FIRST PHILEC , PHIL.
Mecel, Construction & Electrical Inc.
Mayondon, Los banos, Laguna (049)536-6158

March 04, 2004 –Aug.10,2006 PIPING FIELD ENGINEER


PROJECT; PETRON BATAAN REFINERY-
PETRON FCC REVAMPING PROJECT
EEI CORPORATION
BATAAN

EDUCATIONAL BACKGROUND:
College COLEGIO DE SAN JUAN DE LETRAN
Calamba City
Bachelor of Science in Mechanical Engineer
1998
PROJECT
1. INSTALLATION OF FIRE PROTECTION PIPING AT AVIDA SERIN WEST TAGAYTAY
( 2015)

SCOPE OF WORK;

INSTALLATION OF 4” dia CROSSMAIN AND BRANCHLINE GROUND UP TO 5TH FLOOR


INSTALLATION OF FIRE PUMP AND ACCESSORIES ( 1 SET)

Supply of labor and consumables.


2. Installation of cooling water piping at nissin monde Carmelray
(supply of labor and consumables. (may 2014)
3. Cleaning of air condition split type, window type and flour
mounted at Phil Nippon tech (Batino calamba laguna)2017

Tools and equipment


1. Bench vise , 2 pc.
2. 1 set of cutting outfit
3. Welding machine 300 ampheres ( 2 set)

4. Rotary hammer ( 1 set)


5. Chain Block 3 tons , 1 pc.
6. Chain Block 1 tons, 2 pcs.
7. Chain Puller 1.5 tons, 1 pcs.

8. Chain Vise 1 pc.


9. Speed Cutter, 1pc.
10. XLT AUV