You are on page 1of 2

G-25

CHAPTER G-5
HIRE CHARGES OF TENT ARTICLES
NOTE : Hire charges includes transporatation at site
within Muncipal Limits, Loading, Unloading,
Placing and removing complete.

Rate (Rs.)
Chapter
Code Description Unit Cost (Rs.) Subsequent
No. 1st Day days
(per Day)
Chairs :
5.1 PVC Chair Each. 165.00 5.50 1.10
5.2 Plastic cane chair of Aluminium pipe with arms. Each. 330.00 5.50 1.30

5.3 Steel pipe pedded chair Each. 715.00 27.50 8.80


Tables :
5.4 Wooden Table 6' x 3' (Babool). Each. 715.00 22.00 5.50
5.5 Wooden Table 6' x 1 ½' (Babool). Each. 550.00 19.80 4.40
5.6 Centre Table sunmica Top 2' x 4' Each. 660.00 16.50 5.50
5.7 Pag Table Sunmica Top 1' x 1' Each. 275.00 11.00 4.40
Floor Covering :
5.8 Cotton Durry (Old). Sqm. 11.00 1.10 0.55

5.9 Cotton Durry (New). Sqm. 22.00 1.10 0.65

5.10.1 Non woven synthtic carpet (Red / Green) Sqm. 110.00 19.80 6.60
(New)

5.10.2 Non woven synthtic carpet (Red / Green) (Old) Sqm. 110.00 11.00 3.30

5.11.1 Wooden Carpet (New). Sqm. 385.00 27.50 8.80


5.11.2 Wooden Carpet (Old). Sqm. 385.00 16.50 5.50
5.1 White Cotton chader (sheet) (Washed) Each. 110.00 11.00 3.30
5.1 Pipe Pandal with covering ht up to 12 to 18 ft Sqm. 22.00 6.60
5.1 Curtain cloth (View Cutter) made out of steel Sqm. 22.00 6.60
pipe frame with vertical height 12 feet covering
with good quality white cloth to cut view
including making holes and made necessary
strengthening support against wind pressure
complete.

5.2 Kanat 9' x 6' fixed with Tent. Each. 440.00 19.80 6.60
5.2 Kanat 9' x 6' fixed without Tent. Each. 440.00 24.20 7.70
5.2 5mm Galvanised Iron (G.I.) pipe 6 mtr. long Each. - 49.50 33.00
with new silk flag.

5.2 Water Proof Tripal. Sqm. - 8.80 3.30


5.2 Wooden stage height 60cm. With steps Sqm. - 33.00 11.00
complete

5.2 Wooden stage height 120 to 150 cm. with Sqm. - 137.50 38.50
steps made of 50 cm dia iron pipe frame with
adjustable height system and having smooth
top wooden board complete.
G-26

Rate (Rs.)
Chapter
Code Description Unit Cost (Rs.) Subsequent
No. 1st Day days
(per Day)
5.2 Cotton mattress with white sheet (Chader). Each. - 11.00 5.50
5.2 Dunlop mattress with white chader size 6' x 3'. Each. - 22.00 8.80
5.2 Massand with white cover. Each. - 9.90 8.80
5.2 Speech Stand having Sunmica top. Each. 1650.00 110.00 55.00
5.3 White cotton cloth cover for padded chair Each. 8.80 3.30
including ribbon

5.3 Barricating with Sal ballies as per design Mt 16.50


including tying with vertical post by coconut
strings including digging out holes in all types
of soil complete in all respect with two
horizontal members height 1.2 m up to 1.5 m
above ground level and vertical supports up to
2.5 centreand upto 3 days period including
removal and cleaning the site complete in all
respect & including dressing of sides in all
types of soil.

5.3 Add extra in barricating for each subsequent Mt 1.10


day after 3 days

5.3 Making of holes in cement concrete / Each. 77.00


Bitumenous road by power driven hammer for
barricating work as per direction of Engineer in
charge

5.3 Hire charges for floded type two seater sofa Each. 187.00 60.50
set (cum bed) with good quality white cloth
cover
5.3 VIP Chair leather cushion Each. 220.00 55.00
5.3 Add extra for hire charge for providing weided Sqm. 28.60 5.50
mesh size 25x25 mm (16SWG) over
barricating (excluding hire charge of
barricating)
5.3 Water Proof Tent with pipe pandal supproted Sqm. 65.00 16.00
with Bamboo & Balli frame.

You might also like