➢ Investors Participation (235) Plots have been made in the Park and (182)
Investors have purchased (235) plots. (111) Investors have established their
units and (71) units are in various stages of being established providing
employment to 1200 persons. (65) Plots who have not taken up civil works
final notices have been issued with the approval of the District Collector.
➢ Spill over works infrastructure works have been taking up with a costing of
Rs.638.00 lakhs at Textile Park, Sircilla. As per the report of District
Collector Rajanna Sircilla a proposal for sanction of amount of Rs.96.00
lakhs towards main drain connectivity to maintain drains at Textile Park,
Rajanna Sircilla are being sent to Government.
➢ State level Committee meeting has been held on 27.04.2019 to allot vacant
plots to (3) entreprenures.
➢ The Textile Park, Malkapur was sanctioned by Govt. of India and State
Government in the year 2003-04 in 50 acres of land at Chouttuppal
Mandal in Yadadri District with a total Project outlay of Rs.331.03 lakhs to
be funded completely by the State Govt.
➢ (110) Plots have been made in the Park and (110) plots sold to Investors (8)
investors have commenced commercial production and (40) investors
commenced civil works.
➢ The APITCO has submitted their estimates for preparation of Revised DPR
for Rs.4.00 lakhs plus service tax (at present 12.36%) totalling to Rs.
4,49,440/- and fee towards providing Project Monitoring Service of
Rs.75,000/- plus service tax (at present 12.36%) per month. Necessary
proposals in this regard have been submitted to the Government for
according necessary permission to prepare revised DPR.
➢ NIMSME was entrusted with the work of preparation of D.P.R. The DPR
prepared by NIMSME is far from practical applicability. Some defects
noticed. As such proposals were submitted to Govt. for cancellation of the
work order vide this office Lr.No.1114/2014-Parks, dated: 17.6.2015.
➢ IL&FS has been assigned to prepare revised D.P.R. the concept Note
prepared by IF&LS has been approved by Government. Final DPR is under
preparation.
➢ The Hon’ble Minister for H&T has laid foundation stone to CFC and Adm.
Block at 10.00 acres of demarcated land at Handloom Park Gadwal on
31.01.2018.
➢ Investors Participation: (121) Plots have been made in the Park and all the
plots were sold to (50) investors who commenced commercial production.
➢ In order to make the Park viable the Government have appointed
Dr.N.J.Rajaram,n Ex –Director, NIFT, hyderabad as CEO to Apparel Export
park, Gondlapochampalli.
➢ It is proposed to setup an Handicrafts & Craft Design Institute at 21.00
acres of open land at AEP., Gundlapochampally.
➢ EOI has been floated inviting various unions architects across India to
showcase their design for the proposed institute.Approval from Government
is pending move forward.
➢ An amount of Rs. 1.10 crores has been released to SPV in two spells
(i.e.,Rs.50.00 lakhs and Rs.60.00 lakhs) for infrastructure development
of the park towards State Share under TCID Scheme as a special case on
the lines of Tamil Nadu State and entire amount spent on infrastructure.
➢ The Govt. of India have cancelled the project vide reference No.
19/11/2005-SITP Cell Dt. 11.8.2011 and instructed the Deputy Director
and Office-In-charge, O/o Regional Textile Commissioner, Bangalore to
initiate action for recovery of the Total Grant of Rs. 13.10 crores
comprising of Rs.12.00 crores and 1.10 crores released by Government of
India and State Government respectively.
➢ As the Hon’ble Supreme Court has vacated the stay orders the District
Collector, Mahabubnagar was requested to recover the amount of
Rs.13.10 crores through R.R. Act.
➢ The Govt. of India has released an amount of Rs.25.00 crores so far for
development of infrastructure.
➢ As reported by the Chairman of SPV, site development, compound wall,
formation of roads, drains, power supply works are completed.
➢ The Hon’ble C.M. has laid foundation stone to the Mega Textile Park at
Warangal on 22.10.2017.