Bangalore - 70
APPRAISAL - II
Organization:
Correct
Sl. No. Question Text Option 1 (A) Option 2 (B) Option 3 (C) Option 4 (D) Answer
(A/B/C/D)
additional
The owner of asset can capitalisation would last date for
last date for filing
1 What is the significance of Cut off date? start billing from that be allowed upto this completing all B
tariff petition
date date for a new project. expenditure.
after permitting
after permitting after permitting after permitting advance, first-
For processing the Collective Transactions through Power
15 advance and first-come- advance transactions first-come-first-serve come-first-serve A
Exchange,margin available is
first-serve transactions only transactions and day ahead
transactions
Regional Power
16 Nodal agency for granting access to ISTS is CERC RLDC CTU D
Committee
PoC rates for short term open access are expressed in
17 Rs/MW/Month Rs/MW/Hr Rs/MW/Day Rs/ MW/Week B
_______
Connectivity after Connectivity after
Connectivity after Long-term access
18 The latest Regulations on Long-term access allows Medium-term Open Short-term Open B
Long-term Access after Connectivity
access access
Bulk Power
The name of the Agreement to be signed subsequent to Long-term Access Transmission
19 Connection Agreement Transmision A
getting connectivity from the CTU Agreement Services Agreement
Agreement
Which of the following applicants are eligible for grant of
connectivity to the ISTS
(a) A 250MW thermal plant
20 (b) A 50MW hydro plant a only a and b a,b, c a and c only B
(c ) CPP with house load =generation
(d) A renewable generator with aggregated generation <
50MW
concurrance of both
Whose concurrances are required for downward revision RLDC where the no concurrance RLDC & SLDC
21 all concerned RLDCs C
of STOA under unit tripping? generator is situated required where generator is
situated
The Control period for which the RLDC Fees and Charges
29 4 years 3 years 2 years 5 years D
gets approved by CERC is ________
Power System Development Fund comprises of Deviation charges Reactive Energy Congestion charges Deviation, Reactive
______________ charges and Congestion
30 charges D
Amount arising from the differences in the market prices Congestion charge Congestion amount Market Operation Market splitting
of different regions as a consequence of Market Splitting Charge charge
31 in Power Exchanges is refered to as B
____________________
Who is the Chairman of Managing Committee of PSDF? Secretary CERC CEO POSOCO Head of NLDC Representative
32 B
from Ministry
33 Deviation Charge is calculated as ____ Actual x Schedule Actual / Schedule Actual – Schedule Schedule - Actual C
What is the shortest time block for which deviation charge every 15 minute time
34 every day every 1 hour block every month C
is calculated? block.
What is the Weekly Settlement Period of Deviation
35 Tuesday to Monday Monday to Sunday Every Wednesday Sunday to Saturday B
Charges ?
36 Deviation Charge rate is specified in ______ Rs./VARH Rs./MW paise/kWh Rs./Hz. C
What is the Pf range in which Wind generators are to 0.8 pf lag to 0.9 pf lead 0.95pf lag to 0.95pf
37 0.8 lag to 0.8 pf 1pf lag and lead B
operate? lead
What is the minimum voltage at which WTG can
38 below 10% below 85% below 15% below C
disconnect under Fault Ride Through condition?
Which country has highest installed capacity of Wind?
39 Spain US China Germany C
Which of the following hydro generators are eligible for all hydro projects
40 Renewable Energy Certificates? less than 25 MW less than 10 MW less than 1 MW A
are eligible
Area A is connected to areas B and C. There is no
interconnection between Area B and C. The TTC from
Could be less than or
41 Area B to A is 1200 MW while the TTC from Area C to greater than 1900 MW 500 MW 1900 MW C
equal to 1900 MW.
Area A is 700 MW. The simultaneous import capability of
Area A would be:
Non-discriminatory open access to the transmission
42 system was mandated by law in the respective years in US 1979 and1991 1996 and 2003 1989 and 1998 1996 and 1998 B
and India
What is the correct relationship between TTC, ATC and
43 TTC + RM =ATC TTC+ATC+RM=0 ATC-RM=TTC ATC=TTC-RM D
Reliability Margin (RM)?
NLDC/RLDCs have been entrusted the responsibility of National Electricity Indian Electricity UI Regulations,
44 Electricity Act, 2003 D
identifying Ancillary Services as per: Policy Grid Code, 2010 2009
Residual amount in………….is to be used for providing Congestion revenue Reagonal Energy
45 Reactive Power pool DSM pool B
ancillary services. account Account
46 RECs are traded at: Power Exchanges NLDC SERCs CERC A
would be collected
Transmission charges for all ISTS licensees would be individually by
47 CTU NLDC RPC A
collected and disbursed by the licensees as billed by
CTU
The applicant for Connectivity need not make a fresh
48 application if there is a change in the power to be 50 MW 75 MW 100 MW 125 MW C
interchanged with the ISTS upto
For which of the following would, transmission LTA, MTOA &
49 LTA & MTOA LTA only Bulk consumer B
augmentation studies be required? STOA
Long-term,
Both long-term &
Only long-term Only medium term medium-term &
50 Fees and charges for the RLDC shall be payable by medium term C
customers customers short-term
customers