The following templates are designed to give you a quick-reference list of the
kinds of information you’ll require for and produce during various project
phases. Each SAP implementation is a little different, so be sure to adapt it to fit
your project!
Blueprint
Blueprint initiates the formal SAP system design. It defines how the company will
use its SAP system and the business process changes that are necessary to accom-
plish company objectives. This process involves key process experts from major
business functions and applicable regional operations.
The results of blueprinting will guide all subsequent project activities from real-
ization through to go-live and support.
Trail Marker
The timing listed for each segment of downloadable content assumes a three-month
project preparation phase. Thus, blueprint begins in project month four.
All remaining sections in this document increment their timing based on the blueprint
initiation date. Your project scope and complexity may vary considerably. Please feel
free to adjust these end dates based on the unique characteristics of your project.
Inputs
왘 High-level requirements
왘 Functional workstream proposed business process changes
왘 Project charter (or other scope document)
왘 Blueprint workshop schedule and logistics planning
왘 Kick-off session preparations
왘 Initial business process hierarchy
왘 Legacy systems interconnections
2
Blueprint
Tasks
The following tasks should be executed during this stage.
Change impacts completed SAP Solution Manager Global process Month Six
owners
Process design documents SAP Solution Manager Global process Month Seven
(PDDs) complete owners
Business controls documents SAP Solution Manager Global process Month Seven
completed owners
Custom objects gaps approved SAP Solution Manager PMO Month Seven
Key Dependencies
왘 Blueprint design sessions must be complete; project sponsors and key execu-
tive must approve the finished blueprint.
왘 All PDDs and related deliverables must be complete and posted to SAP Solu-
tion Manager.
왘 All custom objects must be reviewed and approved prior to project sponsor
blueprint approval.
Deliverables
왘 Organization hierarchy
왘 Detailed level business processes
3
Project Templates
Outcomes
왘 Approved design
왘 Localization initiation
Configuration
Configuration forms one of the two core components in the realization build
phase. During this time, the project team converts blueprint decisions into exe-
cutable transactions in the SAP system. This process involves key integrator SAP
transaction experts from each global process team.
Inputs
왘 Process definition documents (PDDs) with process flows complete
왘 Availability of SAP development system
왘 Availability of SAP Solution Manager Implementation Guide (IMG)
왘 Realization project plan available
왘 Business process hierarchy (BPH) and organization hierarchy approved
왘 Realization kick-off sessions complete
왘 Necessary localizations identified
4
Configuration
Tasks
The following tasks should be executed during this stage.
Complete cycle one configura- SAP Solution Manager PMO Month Seven
tion (organization hierarchy and
major master data)
Complete cycle two configura- SAP Solution Manager Global process Month Eight
tion (remaining master data) owners
Complete cycle three configura- SAP Solution Manager Global process Month Eight
tion (simple transactions) owners
Complete cycle four configura- SAP Solution Manager Global process Month Eight
tion (complex transactions) owners
Post configuration rationale SAP Solution Manager Global process Month Nine
specifications to SAP Solution teams
Manager
Review and approve configura- SAP Solution Manager Global process Month Nine
tion rationale specifications teams
Complete configuration func- Test tracking system Test team Month Nine
tional testing
Key Dependencies
왘 Trained configuration analysts are available.
왘 Documentation standards are defined and approved.
5
Project Templates
Deliverables
왘 Configuration template
왘 Approved configuration rationale specifications
왘 Configuration rationale specification documents posted to SAP Solution Man-
ager
Outcomes
왘 Configuration complete
왘 Configuration functional testing complete
왘 String testing readiness
Custom Objects
Custom object design represents the second core component of the realization
build phase. During this time, the application development team will construct
those WRICEFP objects from the approved gap documents submitted in blue-
printing.
Inputs
왘 Gap documents complete and approved
왘 Process definition documents (PDDs) with process flows complete
왘 Availability of SAP development system
왘 Realization project plan available
왘 Business process hierarchy (BPH) and organization hierarchy approved
6
Custom Objects
Tasks
The following tasks should be executed during this stage.
Unit test plans prepared and MS SharePoint Global process Month Nine
approved owners
Custom objects reviewed and SAP Solution Global process Month Nine
approved Manager owners
Key Dependencies
왘 Gap documents are prepared and fully reviewed prior to the start of develop-
ment.
왘 Documentation standards are defined and approved.
왘 Fully staffed applications development team are assigned and on-board.
Deliverables
왘 Functional specification template
7
Project Templates
Outcomes
왘 Custom object development complete
왘 Unit testing complete
왘 String testing ready for custom object data
Data Conversion
Data conversion transfers needed data from legacy systems into the SAP system.
This data provides required master data to operate the SAP system or historical
transactional records to ensure continuity as part of system change.
Inputs
왘 Full date review
왘 Data definition documents
왘 Availability of a data conversion system (if used)
왘 Fully staffed data team
왘 DEV and QAS systems available
Tasks
The following tasks should be executed during this stage.
8
Data Conversion
Define data conversion scope and MS SharePoint Data team Month Eight
processes
Prepare data functional conversion SAP Solution Data team Month Nine
specifications Manager
Transform and load legacy data to Data conversion Data team Months Nine
the SAP system tool through Fifteen
Review and confirm correct data Testing system Global process Months Nine
loads in DEV and QAS owners through Fifteen
Load legacy data into the SAP Data conversion Data team Month
production system tool Nineteen
Key Dependencies
왘 Integration and user acceptance testing schedules are aligned with data load
schedules.
왘 Data defects have been resolved prior to completion of testing or production
load.
왘 Testing system is available for data verification usage.
왘 Data owners are available for review and verification tasks.
Deliverables
왘 Integration and user acceptance test data
9
Project Templates
왘 Production data
왘 Approved data conversion scripts
Outcomes
왘 Approved and accurate data in test systems
왘 Approved and accurate data in production system
Training developers work closely with the process teams to identify necessary
information for that set of users. In an iterative fashion, developers prepare cur-
riculum, course outlines, and course materials to fit these requirements. Instruc-
tors are prepared to deliver the material, and administrators track attendance and
course completion.
Inputs
왘 Process definition documents (PDDs)
왘 Configuration specification rationales
왘 Change impacts documents
왘 Project charter (and other scope documents)
Tasks
The following tasks should be executed during this stage.
10
End User Training
11
Project Templates
Key Dependencies
왘 Role mapping is complete and roles are assigned to users.
왘 Training is mapped to roles.
왘 Facilities and infrastructure training requirements are complete.
왘 Instructors are available to conduct classes.
왘 End users are available to attend classes as per schedule.
Deliverables
왘 Curriculum proposal
왘 Course outlines
왘 Completed training materials
왘 Translated materials
왘 Training system
왘 Records of course attendance and completion
Outcomes
왘 Approval to issue SAP UserIDs
왘 Distribution of SAP UserIDs
Integration Testing
Integration testing begins the formal assessment of the configured SAP system. It
permits the project team to verify that system elements, including custom
12
Integration Testing
Integration test is often handled by the project systems integrator (assisted by the
core project team) and is divided into two to four separate cycles.
Inputs
왘 Completed custom objects and documentation
왘 Completed configuration and documentation
왘 Functional and unit test completion
왘 Completed string test
왘 Availability of the quality assurance system (QAS)
왘 Availability of selected testing system
Tasks
The following tasks should be executed during this stage.
Test scripts written and reviewed MS SharePoint Global process Month Ten
owners
Test scripts loaded to testing Testing System Test team Month Ten
system
Test data loaded to QAS SAP QAS Data team Month Ten
Complete integration test cycle Testing system Global process Month Eleven
one (configuration) owners
Complete integration test cycle Testing system Global process Month Twelve
two (limited custom objects) owners
13
Project Templates
Defect resolution process under- Testing system Test team Month Eleven
way
Test status tracking underway Testing system Test team Month Eleven
Key Dependencies
왘 String test of configuration and custom object must be completed and defects
resolved prior to initiation of integration test.
왘 Project sponsors and key executive must approve entrance into integration
test.
왘 Testing system, if used, must be available and configured for integration test.
왘 Integration test data must be transported to the QAS system prior to initiation
of integration testing.
Deliverables
왘 Test scenarios and test scripts
왘 Test processes
왘 Confirmed system operation
왘 Defect resolution processes
Outcomes
왘 Confirmed design or needed alterations
왘 Preparation for user acceptance test
14
User Acceptance Testing
Inputs
왘 Integration test exit review approval
왘 Completion of integration test to include resolution of defects
왘 Availability of additional test scripts and scenarios
왘 Availability of user testers
Tasks
The following tasks should be executed during this stage.
User testers trained on system and MS PowerPoint Test team and Month
on testing processes global process Thirteen
owners
15
Project Templates
Complete integration test cycle Testing system Global process Month Fifteen
two (limited custom objects) owners
Complete integration test cycle Testing system Global process Month Sixteen
three (remaining custom objects) owners
User acceptance test defect resolu- Testing system Test team Month
tion process underway Fourteen
User acceptance test tracking sta- Testing system Test team Month
tus reporting underway Fourteen
Key Dependencies
왘 The needed user acceptance test data sets are available.
왘 System training material for tester instruction is ready.
왘 Instructors are available for tester system instruction.
왘 Additional test scripts and test scenarios are available.
Deliverables
왘 Completed test scripts
왘 Requirements traceability matrix
왘 System confirmation documentation
16
Cutover
Outcomes
왘 Exit approval from user acceptance test
왘 Confirmed design to fit business processes
왘 Preparation to initiate cutover activities
Cutover
Cutover takes place during the final preparation phase. It represents the last step
prior to go-live and making the system available for general use.
Inputs
왘 Freeze period identification
왘 Site readiness plans
왘 Regional and site
Tasks
The following tasks should be executed during this stage.
17
Project Templates
Key Dependencies
왘 User acceptance test has been completed.
왘 Approval from project sponsors to move into cutover has been received.
왘 SAP production system is available.
왘 Transports for custom objects and configuration are ready.
왘 Loads of converted data to the production system are ready.
Deliverables
왘 Cutover plan
왘 Ramp-up and ramp down plan
왘 Controlled start plan
18
Cutover
Outcomes
왘 Readiness to go-live
왘 Readiness for system usage
19