This document provides a schedule for the completion of plumbing work for units in the North Tower of the Lumiere Residences building. It includes tasks such as drywall layout, formwork and concrete pouring for plumbing pipe stub-outs from units, installation of precast water meter boxes, and notes a column for remarks. The schedule is for work on the 9th floor and includes sign-off sections to track completion of each task by date and signature.
This document provides a schedule for the completion of plumbing work for units in the North Tower of the Lumiere Residences building. It includes tasks such as drywall layout, formwork and concrete pouring for plumbing pipe stub-outs from units, installation of precast water meter boxes, and notes a column for remarks. The schedule is for work on the 9th floor and includes sign-off sections to track completion of each task by date and signature.
This document provides a schedule for the completion of plumbing work for units in the North Tower of the Lumiere Residences building. It includes tasks such as drywall layout, formwork and concrete pouring for plumbing pipe stub-outs from units, installation of precast water meter boxes, and notes a column for remarks. The schedule is for work on the 9th floor and includes sign-off sections to track completion of each task by date and signature.
DRYWALL LAYOUT OUT FORM & DRY PACK FOR STUB OUT ZOCALLO WITH BUTONES WATER METER PRECAST UNIT REMARKS DATE SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE SIGNATURE FOR BRANCHLINE FOR BRANCHLINE FOR BRANCHLINE FOR BRANCHLINE FOR BRANCHLINE