Existing Design Location/ Total C/W Proposed Span Total Length of Total Length of Length of
Sl Type of Span Arrangement Recommendation of No's of
Chainage Chainage Stream Length Width Arrangement Length each Bore Length of Bore in Bore in
No Bridge (m) Existing Bridge Bore
(km) (km) Name (m) (m) (m) (m) (m) Bore (m) Rock (m) soil (m)
4x6.7+4x8.5+6x7.62+2
1 MJBR 192+435 176+600 Hasdeo x13.21+2x16.76+4x30.4 288.38 7.5 New Bridge on Bypass 20x35.0 700.0 21 30 630 612 18
8
2 MJBR 211+380 188+333 Sone 6x13.4 80.4 7.3 Retain & Repair 6x13.4 80.4 0 0 0 0
3 MNBR 215+502 192+370 3x5.0 15.0 7.0 Widening 3x5.0 15.0 2 10 20 14 6
4 MNBR 223+540 200+940 6x9.0 54.0 7.0 Reconstruction 3x19.0 57.0 4 30 120 108 12
5 MNBR 223+940 201+335 1x3.0+6x1.2 10.2 7.5 Reconstruction 1x18.0 18.0 2 30 60 54 6
6 MNBR - 162+510 New Bridge 1x22.0 22.0 2 30 60 54 6
7 MNBR - 164+334 New Bridge 1x10.0 10.0 1 10 10 7 3
8 MNBR - 165+730 New Bridge 1x8.0 8.0 1 10 10 7 3
9 MNBR - 168+014 New Bridge 1x7.0 7.0 1 10 10 7 3
10 MNBR - 168+947 New Bridge 1x22.0 22.0 2 30 60 54 6
11 MNBR - 170+130 New Bridge 1x10.0 10.0 1 10 10 7 3
12 MNBR - 174+708 New Bridge 1x18.0 18.0 2 30 60 54 6
13 MNBR - 178+923 New Bridge 1x18.0 18.0 2 30 60 54 6
14 MNBR - 189+590 New Bridge 2x7.0 14.0 2 10 20 14 6
15 MNBR - 205+390 New Bridge 1x18.0 18.0 2 30 60 54 6
16 MNBR - 206+220 New Bridge 1x7.0 7.0 1 10 10 7 3
17 MNBR - 206+960 New Bridge 1x8.0 8.0 1 10 10 7 3
18 MNBR - 208+800 New Bridge 1x8.0 8.0 1 10 10 7 3
19 MNBR - 215+118 New Bridge 2x20.0 40.0 3 30 90 81 9
20 L/C 219+125 Sakreli ROB 502.0 4 30 120 108 12
55 1430 1310 120
Proposal of Bridges (Package-III)
Existing Design Total C/W Proposed Span Total Length of Total Length of Length of
Sl Type of Span Arrangement Recommendation of No's of
Chainage Chainage Length Width Arrangement Length each Bore Length of Bore in Bore in soil
No Bridge (m) Existing Bridge Bore
(km) (km) (m) (m) (m) (m) (m) Bore (m) Rock (m) (m)
1 MJBR 268+250 240+782 9x31.5 283.5 7.5 New Bridge on Bypass 9x31.4 282.6 10 30 300 250 50
2 MNBR 217+385 New Bridge on Realignment 2x25.0 50.0 3 30 90 75 15
3 MNBR 226+300 New Bridge on Realignment 1x10.0 10.0 1 10 10 7 3
4 MNBR 249+918 223+930 3x4.5 13.5 8.0 Widening 3x4.5 13.5 2 10 20 14 6
5 MNBR 229+000 New Bridge on Realignment 1x14.0 14.0 2 10 20 14 6
6 MNBR 230+300 New Bridge on Realignment 1x10.0 10.0 1 10 10 7 3
7 MNBR 230+454 New Bridge on Realignment 1x10.0 10.0 1 10 10 7 3
8 MNBR 258+853 231+000 3x6.0 18.0 8.5 Widening 3x6.0 18.0 2 10 20 14 6
9 MNBR 231+423 New Bridge on Realignment 1x20.0 20.0 2 30 60 54 6
10 MNBR 261+554 233+480 2x3.0 6.0 12.0 Widening 1x6.0 6.0 1 10 10 7 3
11 MNBR 263+821 235+746 3x7.4 22.2 8.5 Reconstruction 1x25.0 25.0 2 30 60 54 6
12 MNBR 240+209 New Bridge on Bypass 2x6.0 12.0 2 10 20 14 6
13 MNBR 245+367 New Bridge on Bypass 1x15.0 15.0 2 10 20 14 6
14 MNBR 247+267 New Bridge on Bypass 1x10.0 10.0 1 10 10 7 3
15 MNBR 249+167 New Bridge on Bypass 1x10.0 10.0 1 10 10 7 3
16 MNBR 250+167 New Bridge on Bypass 1x10.0 10.0 1 10 10 7 3
17 MNBR 251+460 New Bridge on Bypass 1x20 20.0 2 30 60 54 6
18 MNBR 253+500 New Bridge on Bypass 1x15.0 15.0 2 10 20 14 6
19 MNBR 255+800 New Bridge on Bypass 1x10.0 10.0 1 10 10 7 3
20 MNBR 256+900 New Bridge on Bypass 1x10.0 10.0 1 10 10 7 3
21 MNBR 258+852 New Bridge on Bypass 1x15.0 15.0 2 10 20 14 6
22 MNBR 299+790 263+315 3x8.0 24.0 8.4 Widening 3x8.0 24.0 2 10 20 14 6
23 L/C 255+550 232+276 New Constrution 584.0 4 30 120 102 18
48 940 764 176
Culverts - 168 No's
Reconstruction - 12 No's
Widening - 49 No's
New - 62 no's
DAILY PROGRESS REPORT
26/7/2019
27/7/2019
28/7/2019
29/7/2019
30/7/2019
31/7/2019
TERMINATION
WATER TABLE
1/8/2019
2/8/2019
CONDUCTED
PLATE LOAD
DEPTH (m)
CHAINAGE
LOCATION
TRIAL PIT
BORING
BH. NO.
TEST
(m)
ON
EASTING NORTHING