Check which part of the CSSR KPI causes the low value: RRC Setup or RAB Setup or Both.
Problem
Classification Measurement Item Sub Items
VS.RRC.Rej.ULIUBBand.Cong,
VS.RRC.Rej.DLIUBBand.Cong
VS.RRC.Rej.ULPower.Cong,
Congestion RRC.FailConnEstab.Cong VS.RRC.Rej.DLPower.Cong
VS.RRC.Rej.ULCE.Cong, VS.RRC.Rej.DLCE.Cong
VS.RRC.Rej.Code.Cong
RRC.FailConnEstab.NoReply
VS.RRC.Rej.Redir.Dist
RF Problem VS.RRC.Rej.Redir.InterRat
VS.RRC.Rej.Redir.IntraRat
VS.RRC.Rej.Redir.Service
Transmission VS.RRC.Rej.RL.Fail
Problem VS.RRC.Rej.TNL.Fail
Analysis Process:
Transmission Problem:
Relative alarms to identify faults on the transmission path or the transmission boards of
RNC/NodeB.
Congestion Problem:
RF Problem:
Problem
Classification Measurement Item Sub Items Sub Items
VS.RAB.FailEstPs.ULPower.Cong
VS.RAB.FailEstPs.Code.Cong
VS.RAB.FailEstab.PS.DLIUBBand.Cong
Congestion VS.RAB.FailEstPS.RNL VS.RAB.FailEstPS.Unsp VS.RAB.FailEstab.PS.ULIUBBand.Cong
VS.RAB.FailEstPs.ULCE.Cong
VS.RAB.FailEstPs.DLCE.Cong
VS.RAB.FailEstPs.DLPower.Cong
VS.RAB.FailEstabPS.UuFail
RF Problem
VS.RAB.FailEstabPS.IubFail
Transmission VS.RAB.FailEstPS.TNL
Analysis Process:
Transmission Problem:
Check transmission issue on Iu-CS interface; check relative alarms and its history.
RF Problem:
Congestion Problem:
Check which part of the CSSR KPI causes the low value: RRC Setup or RAB Setup or Both
Problem
Classification Measurement Item Sub Items
VS.RRC.Rej.ULIUBBand.Cong,
VS.RRC.Rej.DLIUBBand.Cong
VS.RRC.Rej.ULPower.Cong,
Congestion RRC.FailConnEstab.Cong VS.RRC.Rej.DLPower.Cong
VS.RRC.Rej.ULCE.Cong, VS.RRC.Rej.DLCE.Cong
VS.RRC.Rej.Code.Cong
RRC.FailConnEstab.NoReply
VS.RRC.Rej.Redir.Dist
RF Problem VS.RRC.Rej.Redir.InterRat
VS.RRC.Rej.Redir.IntraRat
VS.RRC.Rej.Redir.Service
Transmission VS.RRC.Rej.RL.Fail
Problem VS.RRC.Rej.TNL.Fail
Analysis Process:
Transmission Problem:
Relative alarms to identify faults on the transmission path or the transmission boards of
RNC/NodeB.
Congestion Problem:
RF Problem:
Analysis Process:
Transmission Problem:
RF Problem:
Check coverage in the failure points. Check if it is in cell border (most probably it is).
Congestion Problem:
Check the distribution of call drops in the network; happens in specific areas or whole area.
Check the traffic distribution in the problematic areas. Check if there was an abnormal increase of the
traffic due to some event.
External interference will appear randomly throughout the day. Its direction will be
specific and it will affect more than one sites in the area.
Problem
Classification Failure Indicator Note
TRELOCalloc expiry (the timer that
waits for the “RELOCATION
COMMAND” after the “REOCATION
VS.IRATHO.FailRelocPrepOutCS.TAlExp.GCell
REQUIRED” expires; check if the RNC-
MSC links are normal; check CN
transmission parameters)
Relocation Failure in target CN/RNC or
target system (check the CN
VS.IRATHO.FailRelocPrepOutCS.TgtFail.GCell
configuration; check if the BSS
supports the relocation)
Preparation Relocation not supported in target
phase IRATHO.FailRelocPrepOutCS.ReloNoSup
RNC or target system
No Resource Available (the BSC has no
resources for the UE access or the 2G
IRATHO.FailRelocPrepOutCS.NoResAvail
MSC has no information about the
target cell)
Preparation phase
Execution phase
Problem
Classification Failure Indicator Note
TRELOCalloc expiry (the timer that
waits for the “RELOCATION
COMMAND” after the “REOCATION
VS.IRATHO.FailRelocPrepOutPS.TAlExp.GCell
REQUIRED” expires; check if the RNC-
MSC links are normal; check CN
transmission parameters)
Relocation Failure in target CN/RNC or
target system (check the CN
VS.IRATHO.FailRelocPrepOutPS.TgtFail.GCell
configuration; check if the BSS
supports the relocation)
Preparation Relocation not supported in target
phase IRATHO.FailRelocPrepOutPS.ReloNoSup
RNC or target system
No Resource Available (the BSC has no
resources for the UE access or the 2G
IRATHO.FailRelocPrepOutPS.NoResAvail
MSC has no information about the
target cell)
Preparation phase
Execution phase
Analysis Process: