The document is a concrete pour card from SS Infratech Pvt Ltd that contains fields for the date, card number, customer name, name of the work, worksite location, grade of concrete, location of concreting, reference drawing, and sections to record inspection details of reinforcement, shuttering, and items during concreting such as the commencement time. The card is used to document the details of a concrete pour for a construction project.
The document is a concrete pour card from SS Infratech Pvt Ltd that contains fields for the date, card number, customer name, name of the work, worksite location, grade of concrete, location of concreting, reference drawing, and sections to record inspection details of reinforcement, shuttering, and items during concreting such as the commencement time. The card is used to document the details of a concrete pour for a construction project.
The document is a concrete pour card from SS Infratech Pvt Ltd that contains fields for the date, card number, customer name, name of the work, worksite location, grade of concrete, location of concreting, reference drawing, and sections to record inspection details of reinforcement, shuttering, and items during concreting such as the commencement time. The card is used to document the details of a concrete pour for a construction project.
DATE............................................. CARD NO.................................... NAME OF CUSTOMER............................. NAME OF WORK................................... WORKSITE........................................... GRADE OF CONCRETE................................. LOCATION OF CONCRETING......................... REFERENCE DRAWING................................
APPROVING AUTHORITY ENGINEER CONSULTANT CLIENT
INSPECTION ITEMS PIOR TO CONCRETEING NT SS INFRATECH Pvt Ltd
CONCRETE POUR CARD
DATE............................................. CARD NO.................................... NAME OF CUSTOMER............................. NAME OF WORK................................... WORKSITE........................................... GRADE OF CONCRETE.................................. LOCATION OF CONCRETING........................... REFERENCE DRAWING..................................
APPROVING AUTHORITY ENGINEER CONSULTANT CLIENT
RATECH Pvt Ltd
ETE POUR CARD
SS INFRATECH Pvt Ltd
CONCRETE POUR CARD
DATE............................................ CARD NO...................................... NAME OF CUSTOMER............................... NAME OF WORK.................................... WORKSITE........................................... GRADE OF CONCRETE............................... LOCATION OF CONCRETING.......................... REFERENCE DRAWING.................................
APPROVING AUTHORITY ENGINEER CONSULTANT
INSPECTION ITEMS PIOR TO CONCRETING REINFORCEMENT 1)SPACING 2)BAR DIA 3)FREE FROM RUSTING 4)SATISFYING THE DRAWING SHUTTERING 1)OILED AND READY TO USE 2)POSITIONING 3)MINIMUM COVER MAINTAINED 4)LEVEL