You are on page 1of 5
Specification Material Purchase | Doc. No. MPS-BMCT-RMQ-H.TBOLT-01 HIGH TENSION BOLT ASSEMBLY FOR RAIL MOUNTED QUAY CRANE OF 40F5 BHARAT MUMBAI CONTAINER TERMINALS PRIVATE LIMITED (BMCTPL) (JNPT / INDIA) (J) This Document is'the property of Doosan Heavy Industries Vietnam Co., Ltd., (DOOSAN VINA), and is to be used only for the purpose of the agreement with DOOSAN VINA pursuant to which itis furnished. 0 | 17.06.16 First Issue N:T.VINH S.H.AN D.W.SEO Rev DATE DESCRIPTION Prepared by | Reviewed by | Approved by No. Paen Material Purchase | Doc. No. | MPS-BMCT-RMQ-H.TBOLT-01 ‘yeecon tes athe Specification Page. 20F5 CONTENTS 1, GENERAL 2. SCOPE OF SUPPLY CODE AND STANDARD ww REQUIREMENT INSPECTION AND TEST 3. 4. 5. 6. PACKING AND TRANSPORTATION 7. SUBMITTALS 8. QUALITY CONTROL REQUIREMENT 9. WARRANTY 10. APPENDICES |2ZZI earns | Material Purchase Doc. No, | MPS-BMCT-RMQ-H.TBOLT-01 Specification Page. 30F5 1.0 GENERAL This specification shall apply the supply of the High Tension Bolt Assembly for Rail Mounted Quay Crane (RMQC), which is operating in a marine environment. 2.0 SCOPE OF SUPPLY 2.4 High Tension Bolt List Quantity No. | DWENo. Description erave | po, pr] Remarks crane | rn2cranes © Fs J eaetso00: | wteour.wurezxw | rior | 126 14616 | DAGRO a0x160Ls6s 2 | aaasoo | HTeour,nuTezww | rior | 470 2040 DACRO w30x"25L-55S 3 | aaztsoo | Hreournurezww | rior | 470 2040 DACRO esx 1846S @ | a2tsc001 | wreouT,nuTeanw | ror | 1008 2008 | _DACRO M24xcoL-s0s : TOTAL zee | s0re2 2.2 Delivery date u Items Delivery Date 1st Batch (for 6 Cranes) 30Sep.2016 2nd Batch (for 6 Cranes} 30,May.2017 © DOOSAN may change delivery schedule during project execution, 3.0 CODE AND STANDARD Materials and design and construction will conform to the most applicable standards as follows JIS Japanese Industrial Standards (JIS B 1486 latest version In the event of conflict between this specification and the codes or standards listed above, this specification will govern. Pom Material Purchase | Doc.No. | MPS-BMCT-RMQ-H.TBOLT-01 seesenu asin on Spe Page. 40F5 4.0 REQUIREMENTS 4.1 All bolts assemblies shall be dacrotized 4.2 Nuts shall be delivered after post processing (torque stabilling process). 4.3 Bolt assemblies shall be delivered after packing per lot and size, 4.4 Before delivery, all bolt assemblies are to be thoughly dried and cleaned internally. 4.5 All bolts assemblies shall be delivered after putting steel cans. 4.6 Moisture absorbent materials shall be used for prevention of penetration of moisture. 4,7 All bolts shall be tested for measuring torque coefficient per lots and size and test results shall be submitted. 5.0 INSPECTION AND TEST Maker standard (To be submitted for approval) 6.0 PACKING AND TRANSPORTATION Contractor shall pack the equipment according to maker standard packing(export packing), rigidly ‘enough protect the equipment during transportation and storage. 1.0 SUBMITTALS (Legend : m Required CI Not Required) Description “| Remarks 1) Material Test Report. 2) Test Report for Torque coefficient. 3) Certificates of Heat Treatment : POF 4) ClO Certificate of Origin & C/Q Certificate of Quality 6) Packing list, _ | Note: All submittal documents shall be provided in metric system, third angle projection and in English language. 8.0 QUALITY CONTROL REQUIREMENT The supplier shall establish for this project, a quality management system that meets the requirements of ISO 9001 The supplier shall appoint a management representative for the purpose of implementing the Quality system throughout the duration of the project. Material Purchase | Doc. No. | MPS-BMCT-RMQ-H.TBOLT-01 ae Ss ition pecificatio! Page. 5OF5 9.0WARRANTY 9.1 Warranty: 1 year from the commercial operation of the crane 9.2 Re-supply: With regard to production, assembly and quality, when welding omissions, working poor, poor dimensions, corrosion caused by improper painting and etc. are occurred, the Contractor shalll be re-supply them with urgent condition. 10. APPENDICES #1: FRAME BOLTING FLANGE DRAWING

You might also like