You are on page 1of 1

A.

COMMERCIAL
SCHEDULE OF NO. OF AREA PER FLOOR CONSTRUCTION COST TOTAL CONSTRUCTION LIFE CYCLE COST ADMINISTRATIVE COST OPERATIONAL COST EQUIPMENT FURNITURE TOTAL COST
ACCOMMODATION UNITS (SQ.M) COST
GROUND FLOOR 1 10338.98 30,000 200,000
SECOND FLOOR 1 9518.87 30,000 200,000
THIRD FLOOR 1 8597.64 30,000 200,000
FOURTH FLOOR 1 7263.54 30,000 1,200,000
3,500,000
COMMERCIAL Total Cost

You might also like