CONTROL DE AVANCE ALCANTARILLADO SANITARIO TUBERIAS CONTROL DE AVANCE A

Fecha: 10-10-2018 Fecha: 10-10-2018

PROVISION Y TENDIDO DE TUBERIA PVC SDR 41 D=8"


UNIDAD LONGITUD AVANCE PORCENTAJE OBSERVACIONES NUMERO
T 1-2 ML 54.65 54.65 100.00 Primer alcantarillado 1
T 2-3 ML 59.91 59.91 100.00 Primer alcantarillado 2
T 3-4 ML 12.31 0.00 3
T 4-5 ML 27.32 0.00 4
T 5-6 ML 9.6 0.00 5
T 6-7 ML 20.73 0.00 6
T 7-8 ML 21.12 0.00 7
T 8-9 ML 5.2 0.00 8
T 9-10 ML 52.64 0.00 9
T 10-11 ML 51.72 0.00 10
T 11-12 ML 51.72 0.00 11
T 12-13 ML 59.99 0.00 12
T 13-14 ML 32.84 0.00 13
T 14-15 ML 60.01 0.00 14
T 15-16 ML 42.8 0.00 15
T 16-17 ML 69 0.00 16
T 17-18 ML 24.21 0.00 17
T 18-19 ML 77.85 0.00 18
T 19-20 ML 60.44 0.00 19
T 20-21 ML 60.43 0.00 20
T 1-22 ML 50 0.00 21
T 22-23 ML 57.32 57.32 100.00 Primer alcantarillado 22
T 23-24 ML 57.32 0.00 23
T 24-3 ML 50.41 0.00 24
T 25-24 ML 40.7 0.00 25
T 27-26 ML 36.28 0.00 26
T 26-5 ML 50.47 0.00 27
T 29-28 ML 37.24 0.00 28
T 28-9 ML 24.35 0.00 29
T 30-31 ML 50 50 100.00 30
T 31-32 ML 50 50 100.00 31
T 32-33 ML 41.8 41.8 100.00 32
T 33-34 ML 41.81 41.81 100.00 33
T 34-10 ML 47.2 0.00 34
T 30-35 ML 85 85 100.00 35
T 35-36 ML 50 50 100.00 36
T 36-37 ML 14.94 14.94 100.00 37
T 37-38 ML 50 50 100.00 38
T 38-39 ML 55.01 55.01 100.00 39
T 39-40 ML 59.41 59.41 100.00 40
T 40-12 ML 59.42 59.42 100.00 41
T 31-37 ML 70.06 70.06 100.00 42
T 32-38 ML 70.44 70.44 100.00 43
T 41-42 ML 65 65 100.00 44
T 42-43 ML 66.73 66.73 100.00 45
T 43-44 ML 11.5 11.5 100.00 46
T 44-45 ML 53 53 100.00 47
T 45-13 ML 53 53 100.00 48
T 46-47 ML 51.99 0.00 49
T 47-48 ML 52.21 0.00 50
T 48-14 ML 50.76 0.00 51
T 49-50 ML 61.82 0.00 52
T 50-51 ML 70.41 0.00 53
T 51-17 ML 41.1 0.00 54
T 52-53 ML 70 0.00 55
T 53-54 ML 53.54 0.00 56
T 54-55 ML 21.04 0.00 57
T 55-56 ML 28.88 0.00 TOTAL
T 56-18 ML 21.61 0.00
TOTAL ML 2776.26 1119 40.31
CONTROL DE AVANCE ALCANTARILLADO SANITARIO CAMARAS DE INSPECCION

Fecha: 10-10-2018

UNIDAD EJECUCIÓN PORCENTAJE OBSERVACIONES


PZA SI 90 falta tapa, primer alcantarillado
PZA SI 90 falta tapa, primer alcantarillado
PZA SI 90 falta tapa, primer alcantarillado
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA SI 90 falta tapa, primer alcantarillado
PZA SI 90 falta tapa, primer alcantarillado
PZA
PZA
PZA
PZA
PZA
PZA
PZA SI 100
PZA SI 100
PZA SI 100
PZA
PZA
PZA SI 100
PZA SI 100
PZA SI 100
PZA SI 100
PZA SI 85 falta tapa y afinar
PZA
PZA SI 100
PZA SI 100
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
PZA
57 15 26.32
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
1
0
0
0
0
0
0
1
1
1
0
0
1
1
1
1
1
0
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
15

You might also like