The document is a casting summary for Phase 2 of a pier construction project as of July 21, 2019. It shows the required and driven pile quantities by size, along with the remaining piles available for casting from two plants. For piles between 26 to 38 meters, the required quantities have been met. For 39 meter piles, 101 piles remain to be cast out of the required 177, with 48 piles available from Townsite and 70 piles available from Orion Plant.
The document is a casting summary for Phase 2 of a pier construction project as of July 21, 2019. It shows the required and driven pile quantities by size, along with the remaining piles available for casting from two plants. For piles between 26 to 38 meters, the required quantities have been met. For 39 meter piles, 101 piles remain to be cast out of the required 177, with 48 piles available from Townsite and 70 piles available from Orion Plant.
The document is a casting summary for Phase 2 of a pier construction project as of July 21, 2019. It shows the required and driven pile quantities by size, along with the remaining piles available for casting from two plants. For piles between 26 to 38 meters, the required quantities have been met. For 39 meter piles, 101 piles remain to be cast out of the required 177, with 48 piles available from Townsite and 70 piles available from Orion Plant.