You are on page 1of 28

Search   Upload  EN  

RELATED TITLES
2.3KDownload
views 1 1 3 of 30    Search document 
SAIC-A-2001 Rev 2
Uploaded by Ramesh Palakkad on Sep 20, 2013 
Specification3 Full description

   
Save Embed Share Print Saudi Aramco SAIC-A-2001 Rev 3 SAIC-A-2003 Rev 0 satip
Piping Qc Review Procedure

Download 3 of 30    Search document 

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Pressure Testing (All Applications) SAIC-A-2001 1-Dec-06 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Pressure Testing (All Applications)
PROJECT TITLE
SAUDI ARAMCO INSPECTION
SAIC-A-2001
WBS / BI / JO NUMBER
1-Dec-06
CONTRACTOR / SUBCONTRACTOR
MECH-

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DA
No.
General Requirements
B Note 1: Use SAIC-A-2003 for specific Test package responsibilities & instructions
Note 2: Use SAIC-A-2009 for specific Testing Equipment requirements including Safety Inspections

Procedure lists Pressure Test Package contents as follows:

ITEM
No.

A Special Proces

Procedure Sco
Continuing Pro
quality goals
When made ev
requested by S
awareness corr
Continuing Proc
Related titles
A1
Search
Goals such as C
  Upload  EN  

Download 3  
of 30
•Savings
Pressure 
Test D
through  Search document

(including
deficiencies,testom
m
pressureadequa
 provide test, hi
SAUDI ARAMCO ID/PID -
gauges, test pref
Best Practices
SAUDI ARAMC
&Alternative:
safety precaut QP
Review •deficiencies
Relief
Procedvalve cap fo
PROJECT •TITLE
Pressure gages
B1 • SA Safety Instr
• Copies of P&ID
Procedure is pr
ITEM
A2 • Piping spools c
Number, Contra
No. • Pre-pressure te
•Procedure
Re-instatemen state
•toFlange
start-upset comw
date
 A) An approval
• Identification of
commissioning t
A3 •B) Revision
Lay-up method con
B6 shall be designe
•(ISO 9001:2000
Verification of c
Inspection strate
• Test manifold h
commencing fab
You're reading a preview. Unlock full access with a free trial. Download With Free Trial
Pages 4 to 30 are not shown in this preview.
considerations s
Procedure
 An attachment (elem
Related titles
Search
•Definitions
A5
 Pressure
(ISO Test
9001:2000of vD
 Upload  EN  

Download 3 of 30  
 A)
• Test Hydrostatic
manifold

Ta  Search document

Service
• Location Test, Str
of blin
B7 B)• Check If Valve Field
Valve &
Valve
•OtherTest Shell Test
lisections
miting fac f
A6 Test
•references,& Backseat
Location of resp
test
Procedure
• Relief Valve clearl
c
B2 • Test medium (w
You're Reading a Preview

C Pipeline Pre
Scribd members can read and download full documents.
Your first 30 days are free!

• Test pressure d
Continue Reading With Trial

•Pipeline
Special Streng
suppor
•andSpecial
Test Process
sequence
conducted a
 A) •system
Detailed
Strength used for
Inspec
Test
 A) Production
•B)Safeguards
Strength (Pe
Test w
PMI,
C1 •Specified
Staged PWHT,and BH
saf
Minimu

C)B) Can identify
Additional
Strength pers
Test
A7
need
•D)Safety forInstructi
Strength follow-
test
C)Strength
E) Detailedtest step
Procedure
items Equi
(controls)
Procedure deta
•Contractor
Relief Valve i
shal
Pipeline
•&Relief Tightn
fillet welds ha
valve in
Related titles immediately afte
Search  • No
 A)  block
The valves
tightness
Upload  EN  

Download 3 of 30  
• Relief valve

is l
 Search document

B3 inspector
• Two or mtooreexamca
C2
B) A 24-hour
• Pressure re
gauge
buried/insulated
• Pressure gage
You're Reading a Preview

of its total length


• Blowdown
Scribd members can read and download full documents.
Your first 30 days are free!
& Is
Continue Reading With Trial Procedure
• Blowdown deta
area
• Manifold is cert
Revalidation Pr
procedure
Proceduresandfor cb
 A) Test pressure
precautions prov
•Procedure
minimum states
of 1.2
C3
B4 • minimum sh
of 1.4
 procedure
B) Actual wall th
responsible for p
Work is p er late
 procedural re
& Maintenance
Procedure Equ
Procedure deta
B5
C4 inspections & ma
Facility, & consid

D On-Plot Piping

Related titles
Procedure has
Search 
See Attachmen
 Upload  EN  

Download 3 of 30     Search document


You're Reading a Preview when reviewed w
Scribd members can read and download full documents.

D1
Your first 30 days are free!

Continue Reading With Trial


adequate instruc
testing & other re
water), Firewate
Provide clear O
Procedure state
newly construc
D2
applicable SA re
noted. (Detail E
Vessel Trim rec
D3 services tested a
Clearly identify

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

You're Reading a Preview


Scribd members can read and download full documents.
Your first 30 days are free!

Continue Reading With Trial

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Related titles
Search   Upload  EN  

Download 3 of 30    Search document 

Reward Your Curiosity


Everything you want to read.
Anytime. Anywhere. Any device.

Read Free For 30 Days

No Commitment. Cancel anytime.

Share this document


    

Related Interests

Pipe (Fluid Conveyance) Valve Leak Strength Of Materials Pressure

Documents Similar To SAIC-A-2001 Rev 2

Saudi Aramco Piping SAIC-A-2001 Rev 3 SAIC-A-2003 Rev 0 satip SAEP-381 Hydrotest Method
Qc Inspector Review Procedure UPLOADED BY UPLOADED BY UPLOADED BY Statement 12th Mar
UPLOADED BY UPLOADED BY bluelions_19 Muhammad Abdul… Sunny Thundil UPLOADED BY
Syed M. Imran Ali imrankhan22 sethu1091

More From Ramesh Palakkad


Related titles 



Search   Upload  EN  

Download 3 of 30    Search document 

ABOUT SUPPORT LEGAL


   
About Scribd Help / FAQ Terms

Press Accessibility Privacy

Our blog Purchase help Copyright

Join our team! AdChoices

Contact Us Publishers

Invite Friends

Gifts

Copyright © 2019 Scribd Inc. . Browse Books . Site Directory . Site Language: English

Related titles

You might also like