Professional Documents
Culture Documents
RELATED TITLES
2.3KDownload
views 1 1 3 of 30 Search document
SAIC-A-2001 Rev 2
Uploaded by Ramesh Palakkad on Sep 20, 2013
Specification3 Full description
Save Embed Share Print Saudi Aramco SAIC-A-2001 Rev 3 SAIC-A-2003 Rev 0 satip
Piping Qc Review Procedure
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Pressure Testing (All Applications) SAIC-A-2001 1-Dec-06 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
Related titles
Search Upload EN
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005) Rev 2 31-Dec-05
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Procedure - Pressure Testing (All Applications)
PROJECT TITLE
SAUDI ARAMCO INSPECTION
SAIC-A-2001
WBS / BI / JO NUMBER
1-Dec-06
CONTRACTOR / SUBCONTRACTOR
MECH-
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DA
No.
General Requirements
B Note 1: Use SAIC-A-2003 for specific Test package responsibilities & instructions
Note 2: Use SAIC-A-2009 for specific Testing Equipment requirements including Safety Inspections
ITEM
No.
A Special Proces
Procedure Sco
Continuing Pro
quality goals
When made ev
requested by S
awareness corr
Continuing Proc
Related titles
A1
Search
Goals such as C
Upload EN
Download 3
of 30
•Savings
Pressure
Test D
through Search document
(including
deficiencies,testom
m
pressureadequa
provide test, hi
SAUDI ARAMCO ID/PID -
gauges, test pref
Best Practices
SAUDI ARAMC
&Alternative:
safety precaut QP
Review •deficiencies
Relief
Procedvalve cap fo
PROJECT •TITLE
Pressure gages
B1 • SA Safety Instr
• Copies of P&ID
Procedure is pr
ITEM
A2 • Piping spools c
Number, Contra
No. • Pre-pressure te
•Procedure
Re-instatemen state
•toFlange
start-upset comw
date
A) An approval
• Identification of
commissioning t
A3 •B) Revision
Lay-up method con
B6 shall be designe
•(ISO 9001:2000
Verification of c
Inspection strate
• Test manifold h
commencing fab
You're reading a preview. Unlock full access with a free trial. Download With Free Trial
Pages 4 to 30 are not shown in this preview.
considerations s
Procedure
An attachment (elem
Related titles
Search
•Definitions
A5
Pressure
(ISO Test
9001:2000of vD
Upload EN
Download 3 of 30
A)
• Test Hydrostatic
manifold
Ta Search document
Service
• Location Test, Str
of blin
B7 B)• Check If Valve Field
Valve &
Valve
•OtherTest Shell Test
lisections
miting fac f
A6 Test
•references,& Backseat
Location of resp
test
Procedure
• Relief Valve clearl
c
B2 • Test medium (w
You're Reading a Preview
C Pipeline Pre
Scribd members can read and download full documents.
Your first 30 days are free!
• Test pressure d
Continue Reading With Trial
•Pipeline
Special Streng
suppor
•andSpecial
Test Process
sequence
conducted a
A) •system
Detailed
Strength used for
Inspec
Test
A) Production
•B)Safeguards
Strength (Pe
Test w
PMI,
C1 •Specified
Staged PWHT,and BH
saf
Minimu
•
C)B) Can identify
Additional
Strength pers
Test
A7
need
•D)Safety forInstructi
Strength follow-
test
C)Strength
E) Detailedtest step
Procedure
items Equi
(controls)
Procedure deta
•Contractor
Relief Valve i
shal
Pipeline
•&Relief Tightn
fillet welds ha
valve in
Related titles immediately afte
Search • No
A) block
The valves
tightness
Upload EN
Download 3 of 30
• Relief valve
is l
Search document
B3 inspector
• Two or mtooreexamca
C2
B) A 24-hour
• Pressure re
gauge
buried/insulated
• Pressure gage
You're Reading a Preview
D On-Plot Piping
Related titles
Procedure has
Search
See Attachmen
Upload EN
D1
Your first 30 days are free!
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related titles
Search Upload EN
Related Interests
Saudi Aramco Piping SAIC-A-2001 Rev 3 SAIC-A-2003 Rev 0 satip SAEP-381 Hydrotest Method
Qc Inspector Review Procedure UPLOADED BY UPLOADED BY UPLOADED BY Statement 12th Mar
UPLOADED BY UPLOADED BY bluelions_19 Muhammad Abdul… Sunny Thundil UPLOADED BY
Syed M. Imran Ali imrankhan22 sethu1091
Related titles
Search Upload EN
Contact Us Publishers
Invite Friends
Gifts
Copyright © 2019 Scribd Inc. . Browse Books . Site Directory . Site Language: English
Related titles