• Take into consideration the pertinent provisions of the Anti-Red Tape Act and monitor pending
applications particularly on timelines, for future reference;
ü Policy Guidelines thru Joint Memorandum Circular between DILG and DPWH
ü Encourage co-location/connectivity of concerned NGAs within the
designated area for Building Permit Application
- NGAs such as BFP for FSEC and FSIC
- LRA to connect to the Office of the Building Official for real-time database
of owners and geospatial information for all land plots
1. Obtain CTC of Land Title from 9. Receive inspection from BFP 17. Receive final inspection for the
Registry of Deeds (LRA-RD) 4 during Construction 1 day certificate of occupancy from the
days OBO 1 day
10. Apply for FSIC at the BFP
2. Obtain Lot plan with Site map 1 day
from Geodetic Engineer 3 days 18. Obtain the certificate of
occupancy from the OBO 18 days
11. Receive final inspection for
3. Obtain Barangay Clearance 1day the FSIC from the BFP 1 day 19.Apply for water and sewage
connection. Manila Water 1 day
4. Apply for Locational Clearance 12. Obtain the FSIC from the
(CPDO) 1 day BFP 5 days 20. Receive inspection for water and
sewage connection. Manila Water 1
5. Receive Inspection for 13. Apply for the Certificate of day
Locational Clearance(CPDO) 1 Final Electrical Inspection 21. Obtain water and sewage
day (CFEI) at the OBO 1 day connection from Manila Water 21 days
6. Obtain Locational Clearance
(CPDO) 5 day 14. Receive final inspection for 22. Apply for the tax declaration of
the CFEI from the OBO 1 day improvement at CAO 1 day
7. Apply and Obtain FSEC form
BFP Fire Mashall (BFP) 7 days 15. Obtain the CFEI from the 23. Receive inspection from the
OBO 3 days appraiser of CAO 1 day
8. Apply and obtain Building
permit and ancillary permits 16. Apply for the certificate of 24. Obtain tax declaration of
from OBO 21 days occupancy at the OBO 1 day improvement from the CAO 3 days
DEALING WITH CONSTRUCTION PERMITS
NEW
PROCEDURES
(16
Steps,
61
Days)
1. Obtain CTC of Land 6. Submit pre-approved 9 Receive the following 12. Receive inspection
Title from Registry of and complete inspections: for water and sewage
Deeds (LRA-RD) 4 days documentary - Final inspection for the connection. Manila
requirements for the FSIC from the BFP Water 1 day
Building Permit and - Final inspection for the
2. Obtain Lot plan with
Ancillary Permits at the CFEI from the OBO
Site map from Geodetic
OBO - Final inspection for the
Engineer 3 days 13. Obtain water and
certificate of occupancy
sewage connection from
from the OBO
3. Obtain Barangay 7. Obtain the following Manila Water 21 days
Clearance 1day clearance and permits
at the OBO 10. Obtain the
4. Apply for the following - Fire Safety Evaluation following certificates 14. Apply for the tax
at the City Planning and Clearance - at the OBO declaration of
Locational Clearance - Fire Safety Inspection improvement at CAO 1
Development Office - Building Permit and Certificate FSIC day
(CPDO) Ancillary Permits - Certificate of Final
- Locational Clearance Electrical Inspection 15. Receive inspection
- Fire Safety Evaluation CFEI from the appraiser of CAO
Clearance 8. Apply for the
- Certificate of 1 day
- Pre-approval of following at the OBO:
Occupancy
Architectural plans - Fire Safety Inspection
Certificate 16. Obtain tax declaration
- Certificate of Final
11.Apply for water and
sewage connection. of improvement from the
5. Get the Pre-approved Electrical Inspection
documents from the CPDO - Certificate of Occupancy Manila Water 1 day CAO 3 days
DEALING WITH CONSTRUCTION PERMITS
REFORMS
START 1 2 3
4,5 6 , 7 , 8, 9 &
CPDO 10 OBO BFP
City
Planning
and
Office
of
the
Building
Official
Development
Office
Bureau
of
Fire
Protection