The same procedure documented in the In-Touch ticket (4020983) will be followed,
Except of building trajectories it should be pointed out that the default option (Measured depth
zero at grid entry) gives shifting in the exported Events (i.e. leads the events to start from the
top of the grid as shown in screenshot to the right), and this obviously is not correct to be
generalized over all cases.