Air System Sizing Summary for AHU.T1.B.

01
Project Name: BSH Terminal1 05/22/2017
Prepared by: Dadan Sejahtera Engineering 06:37PM

Air System Information


Air System Name AHU.T1.B.01 Number of zones 1
Equipment Class CW AHU Floor Area 5166.7 ft²
Air System Type SZCAV Location Jakarta, Indonesia

Sizing Calculation Information


Zone and Space Sizing Method:
Zone CFM Peak zone sensible load Calculation Months Jan to Dec
Space CFM Individual peak space loads Sizing Data Calculated

Central Cooling Coil Sizing Data


Total coil load 33.0 Tons Load occurs at Jan 1400
Total coil load 396.3 MBH OA DB / WB 89.6 / 79.9 °F
Sensible coil load 309.7 MBH Entering DB / WB 79.0 / 65.9 °F
Coil CFM at Jan 1400 13139 CFM Leaving DB / WB 57.1 / 56.0 °F
Max block CFM at Jan 1600 13409 CFM Coil ADP 54.7 °F
Sum of peak zone CFM 13545 CFM Bypass Factor 0.100
Sensible heat ratio 0.781 Resulting RH 47 %
ft²/Ton 156.5 Design supply temp. 58.0 °F
BTU/(hr-ft²) 76.7 Zone T-stat Check 1 of 1 OK
Water flow @ 10.0 °F rise 79.29 gpm Max zone temperature deviation 0.0 °F

Supply Fan Sizing Data


Actual max CFM at Jan 1600 13409 CFM Fan motor BHP 2.95 BHP
Standard CFM 13397 CFM Fan motor kW 2.20 kW
Actual max CFM/ft² 2.60 CFM/ft²

Outdoor Ventilation Air Data


Design airflow CFM 1424 CFM CFM/person 14.83 CFM/person
CFM/ft² 0.28 CFM/ft²