Professional Documents
Culture Documents
Page 1 of 10
Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 313D2 LGP EXCAVATOR GAJ
Configuration: 313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine
i05474608
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 189-0411 Shackle As 1
350-7768 Electric Hydraulic Pump Gp (115V) 1
350-7769 Electric Hydraulic Pump Gp (230V) 1
6V-3175 Double Acting Cylinder 1
B 4C-9634 Puller Stud 1
9U-6832 Nut 1
7S-9484 Sleeve 1
231-4349 Bearing Puller Adapter 1
Start By:
NOTICE
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019
313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine(SEB... Page 2 of 10
When you are using hydraulic cylinders and puller studs, always ensure
that the rated capacity of the puller stud meets or exceeds the rated
capacity of the hydraulic cylinder. If the puller stud does not meet or
exceed the rated capacity of the hydraulic cylinder, a sudden failure of
the puller stud could occur. The sudden failure of the puller stud could
result in personal injury or death.
Personal injury can result from hydraulic oil pressure and hot oil.
Hydraulic oil pressure can remain in the hydraulic system after the
engine has been stopped. Serious injury can be caused if this pressure is
not released before any service is done on the hydraulic system.
Make sure all of the work tools have been lowered to the ground, and
the oil is cool before removing any components or lines. Remove the oil
filler cap only when the engine is stopped, and the filler cap is cool
enough to touch with your bare hand.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019
313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine(SEB... Page 3 of 10
Illustration 1 g01433782
1. Start the machine. Fully extend the stick. Fully retract the quick coupler. Lower the boom, the
stick, and the quick coupler to the ground. Position suitable cribbing under the stick, as shown.
2. Release the hydraulic system pressure. Refer to Disassembly and Assembly, "System Pressure -
Release".
Illustration 2 g01433783
3. Disconnect hose assemblies (1). Remove clip (2) and reposition hose assemblies (1).
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019
313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine(SEB... Page 4 of 10
Illustration 3 g01433784
Illustration 4 g01433785
4. Attach a suitable lifting device and Tooling (A) to quick coupler (4). The weight of quick
coupler (4) is approximately 209 kg (460 lb).
6. Slide O-ring seals (8) off the pin joints between the quick coupler and the power link and onto
the flanges of the quick coupler.
Illustration 5 g01433799
9. Remove nuts (9), bolt (11), and pin (10). Remove quick coupler (4) and O-ring seals (12) from
the stick assembly.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019
313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine(SEB... Page 5 of 10
Illustration 6 g01433800
Illustration 7 g00687381
11. Use Tooling (B) in order to remove sleeve bearings (14) from the stick assembly.
Installation Procedure
Table 2
Required Tools
Tool Part Number Part Description Qty
A 189-0411 Shackle As 1
C 350-7768 Electric Hydraulic Pump Gp (115V) 1
350-7769 Electric Hydraulic Pump Gp (230V) 1
6V-3175 Double Acting Cylinder 1
4C-9634 Puller Stud 1
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019
313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine(SEB... Page 6 of 10
9U-6832 Nut 1
231-4349 Bearing Puller Adapter 1
D 1P-0520 Driver Gp 1
E 5P-0960 Grease Cartridge 1
When you are using hydraulic cylinders and puller studs, always ensure
that the rated capacity of the puller stud meets or exceeds the rated
capacity of the hydraulic cylinder. If the puller stud does not meet or
exceed the rated capacity of the hydraulic cylinder, a sudden failure of
the puller stud could occur. The sudden failure of the puller stud could
result in personal injury or death.
Note: Make sure that the bearing bores for the sleeve bearings are free of paint and grease prior to the
installation of the sleeve bearings.
Illustration 8 g01433828
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019
313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine(SEB... Page 7 of 10
Illustration 9 g01433800
1. Lower the temperature of sleeve bearings (14). Use Tooling (C) in order to install sleeve
bearings (14). Install sleeve bearings (14) to depth of Dimension (X). Dimension (X) is
9.50 ± 0.80 mm (0.374 ± 0.032 inch).
2. Use Tooling (D) in order to install lip seals (13). Install lip seals (13).
3. Apply Tooling (E) to the sealing lip of lip seals (13) and to sleeve bearings (14).
Illustration 10 g01433799
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019
313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine(SEB... Page 8 of 10
Illustration 11 g01433832
4. Attach a suitable lifting device and Tooling (A) to quick coupler (4). The weight of quick
coupler (4) is approximately 209 kg (460 lb).
5. Position quick coupler (4) and O-ring seals (12) on the stick assembly. Apply Tooling (E) to the
surface of pin (10). Install pin (10), bolt (11), and nuts (11).
6. Tighten nuts (9), as shown. Tighten the outside nut until the nut is 0.5 mm (0.02 inch) beyond
the end of the retaining bolt. Tighten the inside nut against the outside nut to a torque of
105 ± 20 N·m (77 ± 15 lb ft).
Illustration 12 g01433784
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019
313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine(SEB... Page 9 of 10
Illustration 13 g01433785
Illustration 14 g01433838
7. Install O-ring seals (8) off the pin joints between the quick coupler and the power link and onto
the flanges of the quick coupler.
8. Position power link (3) and quick coupler (4) until the bores line up.
9. Apply Tooling (E) to the surface of pin (6). Install pin (6), bolt (7), and nuts (5).
10. Tighten nuts (5). Tighten the outside nut until the nut is 0.5 mm (0.02 inch) beyond the end of
the retaining bolt. Tighten the inside nut against the outside nut to a torque of 105 ± 20 N·m
(77 ± 15 lb ft).
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019
313D2 LGP Excavator GAJ00001-UP (MACHINE) POWERED BY 3054C Engine(S... Page 10 of 10
Illustration 15 g01433783
End By:
Copyright 1993 - 2019 Caterpillar Inc. Wed Aug 14 16:52:36 UTC+0700 2019
All Rights Reserved.
Private Network For SIS Licensees.
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2019