T-code you used for create packing instructions is POP1. First you give external name for your packing instruction.
The combination of your packing instruction can be: one packaging material with one material or one packaging material
with many materials.
Furthermore, you can also maintain the dimension of this packing instruction.
Basically, the process of create packing instruction is done till this step. The next step is assign your packing instruction to
your packing instruction determination.
First, determination type that contains key combination should be set up through customizing.
In the entry provided, for material and customer set up here I assign the packing instruction that already made before.
If we have another option to pack this material thus thus the other packing instruction could be assign as an alternative
packing instruction.
Standard SAP provide additional 4 alternative packing instruction.
AUTOMATIC PACKING
Master packing instruction and determination that already created in previous step then will be used in automatic packing
process. If you familiar with delivery processing, when you create packing in Outbound Delivery Document (ODO) you can
do automatic packing there.
As for example in screenshot below, the material to be packed will be listed down in bottom section. To do automatic
packing, click on button
System then will searching the appropriate packing instruction that already mapping in packing instruction determination.
If suitable packing found, the material will be packed into packaging material based on the rule of quantity defined.
Share this:
From <https://monicaradytia.wordpress.com/2013/07/04/packing-instructions-determination/>
>> On returnable packaging shipment, here will record the shipment of the packaging to customer.
Steps:
To ship returnable packaging using a standard sales order, for example, proceed as follows:
Here I create a sales order, the order type is “OR” which is used for standard order. I filled customer, material, and
quantity that customer ordered. Since, I use packing functionality, I don’t add packaging material as a item in sales order. I
will add the item when do delivery order.
Also make sure movement type for ItCa TAL that is used in packaging material is 621 GI ret.pack.:lending.
After finished creating delivery order, then post goods issue will be done.
From <https://monicaradytia.wordpress.com/2013/06/27/returnable-packaging-part-1/>
>> This process is used when the packaging material that exist in customer’s warehouse will be returned back to our stock.
Steps:
After GR the process of Returnable Packaging Pick Up is done. No billing document creation is needed.
From <https://monicaradytia.wordpress.com/2013/06/27/returnable-packaging-part-2/>
Your customer rent your pallet again and they want to have your stock as their own. Thus we will create issue document
and billing document.
Stock Overview of Packaging Material that is rent by customer
To process the issuing of your customer returnable packaging stock therefore, you will process it using sales order too.
Like returnable packaging pick up process, system will check the availability of returnable packaging stock that is exist in
customer warehouse.