Professional Documents
Culture Documents
Method Statement of Concreting Work PDF
Method Statement of Concreting Work PDF
OF
CONCRETE CASTING IN-SITU
1. Cut of Pile Head
After finished of driving pile down to design level accordance with the specifications
and drawings, cutting of pile will be execute.
• Steel Bracket
• Wood & Plywood 9 mm
• Tie Rod
• Tools Set
Concreting Tools :
• Pot Mixer
• Concrete bucket
• Pouring tools & support
• Concrete Vibrator
• Curing compound sprayer
3. Concreting Work
Pile cap, beam and slab will be cast in situ concrete, concrete grade as per
specification. Concreting works will be execute on 2 (two) stage, low level and
high level (as shown on attached drawing). Bracket structure will be fixing on steel
pile as a base of form work.
After installation of bracket done, laying of timber installation will be execute as a
frame for form work for pile cap, beam and slab. Scheme of bracket, timber staging
installation and form work as shown on attached drawing.
The pouring work will be done ect.:
• Stage 1 : Concrete pouring of Pile Cap & Beam
• Stage 2 : Concrete pouring of Slab
A. Concreting Scheme for Pile Cap & Beam
B. Bracket and Timber Staging Installation
C. Flowchart for Formwork
Marking Dimension of Drawing
Formwork for Plat Slab
Checking & Approval
Concrete Casting
Inspection