You are on page 1of 7

Irfan ullah khan

Lane #3, Quaid-i-Azam Colony, Dhamyal Road, Rawalpindi, Pakistan


ifykhan@gmail.com
+92.3134499666

Career Objective
To obtain a position in the Telecom or information technology industry utilizing my Technical/Problem
-Solving, Network/Project Management, and Customer Service/Support abilities.

Professional Experience
Employer: Rcom (CANAL Engineering Services L.L.C) on Etisalat UAE Project
Job Title: Coordinator/engineer
Duration: October 2016 – May 2017

Responsibilities:-
 Installation of all equipment
 Supervision of team
 Quality control
 Communications and Reporting

Work Detail:-
Worked on Ericsson 6000 series Alarms
Worked on HUAWEI
Worked on BBU3900, Installation of BBU3900, troubleshooting, alarms clearance.
Addition of L800, addition of cells, addition of RRU3268, addition of DCDU, addition of cards UBBPd6, LBBPd3,
UBBPe6.
Worked on Java based software for HUAWEI, commissioning, rectification, upgrading of BBU3900 internal
software packages, troubleshooting and alarms clearance.
Worked on Cleanup Project.
Recoveries of feeders, installation of feeders, installation on 2G, 3G, LTE.
Worked on Nokia Alcatel Lucent
Usage of all Nokia software 2G, 3G, LTE
D4U, SUMX, D2U installations

------------------------------------------------------------------------------
Employer: Rcom Technical Services L.L.C on Al-Ain Ericsson modernization Project
Job Title: Coordinator and BSS Engineer.
Duration: May 2016 – December2016

Responsibilities:-
 Installation of all equipment
 Supervision of teams
 Quality control
 Communications and Reporting

Work Detail:-
Managing teams and coordination with customers and teams
Worked on 2G, 3G & LTE
Installation of all types of RBS, 6201, 6102, 6101, 6301, 6601, 19” rack.
Installation of BBU 6201, 6301 and configuring alarms of BBU.
Installation of 2G equipment, DUG20 01, RRUS02 B8, RRUS02 B3, RUS B8, RUS B3, Commissioning of 2G,
loading IDB’s, loading Files for 2G.
Installation of 3G (U2100 & U900) equipment, DUW40 01, RRUS01 B1, RUS B1 for U2100, RRUS02 B8, RUS B8
for U900.
Commissioning of 3G DUW via RBS Element Manager, using SMART LAPTOP.
Commission of U900 in Mixed Mode with 2G G900, and single mode.
Installation of LTE (L1800 & L800), DUS40 02, DUS30 02, RRUS02 B3, RUS B3 for L1800, RRUS02 B20, RUS B20.
Commissioning of DUS via Element Manager.
Rectification of 3G & 4G, different issues, RSSI, Traffic issue, worked on moshell, Rectification by moshell.
Transmission Expertise: Checking VLAN, creating VLAN, Checking reachability.
Configuring TCU.
------------------------------------------------------------------------------

Employer: Ericsson (Iran)/Relacom


Job Title: Engineer.
Duration: June 2015 – December 2015

Responsibilities:-

 Installation of all equipment


 Supervision of all equipment
 Quality control
 Communications and Reporting

Work Detail:-
Irancell (IRAN) 3G, 4G project. MW links, Swap of sites from 2000 RBS to 6000 RBS. IBS sites for 3g and LTE.

------------------------------------------------------------------------------
Employer: Tellogix
Job Title: Project Manager
Duration: January 2014 – February 2015

Responsibilities:-

 Administration
 Financial Management
 Human Resources Management
 Planning
 Communications and Reporting
 Logistical Management
 Over-all Program Management

Work Detail:-
ZTE 3G project. MW links and Rollout sites.

------------------------------------------------------------------------------

Employer: LCC Pakistan


Job Title: Installation Supervisor
Duration: January 2010 – December 2013

Responsibilities:-

 Supervision of team
 Quality control
 Communications and Reporting
Work Detail.

 TELENOR PROJECT
To supervise team regarding indoor/outdoor Nokia/Siemens and FLEXI, ULTRA GSM BTS,
Power work regarding rectifiers like Power One, Delta, Eltec Indoor/outdoor Rectifier, Electrical system Installation.
Installation of Fire alarm system on sites.
Telephone and data systems (LAN and WAN cabling with routers and switches installation work.
Microwave Dish, GSM Antenna, RG and Feeder Cable installation and Microwave Link alignment.
And also to provide technical support regarding troubleshooting of Nokia GSM BTS, Microwave Link and Rectifier power issues.
To provide Technical coordination/support to Documentation Engineers regarding different issues.
To Commission and integrate sites.
To swap sites from ultra-site to flexi BTS.

 CM PAK PROJECT.
Worked on ZTE DWDM (ZXWM M900)
Worked on ZTE SDH (ZXMP S385) system.
Worked on ZTE power node.

 MOBILINK ZTE SWAP PROJECT


Worked on ZTE BTS swap project
Swap from Motorola to ZTE BTS SDR (8900)

 Mobilink-Ericsson Mega Swap.


Working as a Supervisor.
Installation, Integration and Commission Ericsson RBS Base Band Unit 6000 Series including RBS 6101 Outdoor, RBS 6301
Metro and RBS 6201 Indoor Sites.
Supervision of 2G swaps activities from Alcatel-Lucent to Ericsson RBS.
Create the IDB according site configuration using OMT Software.
Installation and configuration of Traffic Nodes Series 02p,06p , 20p and Mini-link CN 210 using software Mini-Link Craft 2.20.
Installation and Configuration of Radio Link (1+0) and (1+1).
Perform the E1 Rooting from one site to other site.
Troubleshooting of Traffic Nodes series.
Trouble Shooting of Ericsson RBS 6000 Series.
Installation and configuration of RBS 6000 Series.
Install and commission Ericsson Mini Microwave Link as per link budget from both end.
Installation of EMERSON Rectifiers. Power connections.

------------------------------------------------------------------------------

Employer: Telecommunication Services Pakistan


Job Title: Project Coordinator
Duration: August 2004 – September 2009

Responsibilities:-

 Supervision of teams
 Quality control
 Human Resources Management
 Planning
 Communications and Reporting
Work Detail.

TELENOR PROJECT
Team Management and movement on sites, Technical Support and Coordination to the BSS Engineers and Site Supervisors
regarding different issues. Also supervise Documentation Engineer regarding site documentation
Description:
Team Management:
To make plans regarding teams movement for achievement of targets in-time, to coordinate with customer, And also to
communicate with TAQ-Nokia-Warehouse for issuing of the equipment as per site plan/configuration.
To supervise TSN Warehouse guys for the issuing and movement of Nokia equipment to the site and to create/follow up SMR,
DDR and FRF etc.
To supervise TSN vehicle staff
Technical Support and Coordination:
To provide Technical Support to BSS Engineers regarding Indoor Solutions for Metro Site BTS, Feeder Testing, TRX Power
Testing, Commissioning and Integration of GSM BTS and Microwave Links.
To provide Technical Support to Site Supervisor regarding indoor/outdoor Nokia/Siemens GSM BTS, Power One Indoor/outdoor
Rectifier, Microwave Dish, GSM Antenna, RG and Feeder Cable installation and Microwave Link alignment.
And also to provide technical support to Engineers regarding troubleshooting of Nokia GSM BTS, Microwave Link and Power One
Rectifier power issues.
To provide Technical coordination/support to Documentation Engineers regarding different issues
Coordination with NOKIA & TAQ LOGISTICS for equipment.
Issuing of Nokia equipment from TAQ Warehouse.
Movement of Nokia equipment from TAQ Warehouse to the site.
Creation and follow up SMR (site material report).
Creation and follow up of DDR (Detail deficiency report).
Creation and follow up of FRF (Faulty Report Form).
Maintenance of Logistics issuance and retuning record.
Supervision of complete equipment movement and usage.
Coordination with Documentation department for BOQ (Bill of quantity).
Arrangement of Transportation for equipment

------------------------------------------------------------------------------

Employer: Wisma Dancom Pakistan PVT LTD


Job Title: Technical Supervisor
Duration: May 2000 – August 2004

Responsibilities:-

 Installation of all equipment


 Supervision of all equipment
 Quality control
 Planning
 Communications and Reporting
 Customer support

Work Detail.

DANCOM ONLINE SERVICES (DOLS) ISP & DSL PROJECT


Worked as a Technical Supervisor for the supervision of different value added services as Internet Services Provider /DSL
(Dancom online Services):-
Work in this department for one and half year as Supervisor, major responsibilities included, ISP media connectivity with PTCL
E1. LAN networking. WAN physical connectivity. Installation of DSL and DSLAM. Installation of routers, switches and firewalls.

CALLPOINT CALLING CARD AND PCO PROJECT


CALLING CARD and PAY PHONE SERVICES (CALL POINT):-
Major responsibilities included installation of Co-location at PTCL premises. Providing media for co-location equipment.
Installation of equipment at co-location. Installation of customer services center of pay phone. Maintenance & troubleshooting of
customer services center.
Education
August 2011 Graduation (B.A) Sargodha university, Pakistan
EDUCATION, SOCIALOGY

Skills
Skill Skill Level Years of Experience

MS Word, MS Excel, Typing, HTML Expert More than 2 years

COMPUTER HARD WARE Expert More than 5 years

POWER WORK AC/DC Expert More than 5 years

SMR, DDR, FRF GENERATION Expert More than 2 years

DOCUMENTION FOR SITES Intermediate 1 year or less

INSTALLATION, COMMISIONING & Expert More than 2 years


INTEGRATION OF GSM SITES

INSTALLATION, COMMISIONING & Expert More than 2 years


ALLIGNMENT OF MW DISHES

Languages
Language Skill Level Years of Experience Last Used

Pushto Expert More than 10 years 1 month or less

Urdu Expert More than 10 years 1 month or less

Punjabi Expert More than 10 years 1 month or less

English Intermediate More than 2 years 1 month or less

Persian Intermediate More than 2 years More than 1 years


References
Name Job Title Phone Number Email Address

MOHAMMAD HAROON MANAGING DIRECTOR +92.3005558131 haroon@tsnpk.com


KHAN
TELECOMMUNICATION
NETWORK SERVICES PVT
Ltd.

Abdusalam Executive officer +92.3459002181 salamfaizi@gmail.com


Telenor PAKISTAN

You might also like