GEO ENGINEERING COMPANY PVT. LTD.

, BANGALORE
An ISO 9001:2015 Company
ANNEXURE II
The Dy. Chief Engineer (East),
Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 01
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Brownish silty Sand

0.5 -0.50 DS

Brownish silty Sand with


gravel

1.5 -1.50 SPT 8 11 15 26 200


DS

Brownish yellow sandy Silt

3.0 -3.00 SPT 20 25 32 57 230


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock

HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

9
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 02
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Brownish silty Sand

0.5 -0.50 DS

Brownish silty Sand with


gravel

1.5 -1.50 SPT 6 9 12 21 180


DS

Brownish yellow sandy Silt

3.0 -3.00 SPT 18 26 30 56 220


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

10
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 03
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

0.5 -0.50 DS

Brownish red sandy Silt

1.5 -1.50 SPT 4 6 10 16 150


DS

3.0 -3.00 SPT 17 23 31 54 220


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

11
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 04
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Brownish red sandy Silt

0.5 -0.50 DS

Brownish red silty Sand

1.5 -1.50 SPT 7 9 11 20 180


DS

Brownish red sandy Silt

3.0 -3.00 SPT 19 25 30 55 220


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

12
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 05
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Yellowish brown sandy Silt

0.5 -0.50 DS

1.5 -1.50 SPT 4 8 9 17 150


Grayish sandy Silt DS

3.0 -3.00 SPT 17 24 33 57 230


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

13
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 06
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Brownish sandy Silt

0.5 -0.50 DS

Brownish sandy Silt wih


mica

1.5 -1.50 SPT 6 9 14 23 200


DS

Brownish pink sandy Silt


with mica
3.0 -3.00 SPT 17 25 37 62 240
DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

14
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 07
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Brownish sandy Silt

0.5 -0.50 DS

Yellowish brown silty Sand

1.5 -1.50 SPT 4 5 8 13 150


DS

Brownish yellow silty Sand

3.0 -3.00 SPT 16 25 32 57 210


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

15
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 08
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Brownish red sandy Silt

0.5 -0.50 DS

Yellowish brown silty Sand

1.5 -1.50 SPT 3 5 9 14 150


DS

Brownish yellow silty Sand

3.0 -3.00 SPT 18 25 36 61 230


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

16
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 09
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

0.5 -0.50 DS

Brownish sandy Silt

1.5 -1.50 SPT 3 5 8 13 140


DS

3.0 -3.00 SPT 16 23 35 58 210


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

17
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 10
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Brownish sandy Silt

0.5 -0.50 DS

Brownish silty Sand

1.5 -1.50 SPT 6 7 8 15 140


DS

Yellowish brown silty Sand

3.0 -3.00 SPT 16 25 33 58 220


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

18
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 11
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Brownish silty Sand

0.5 -0.50 DS

Brownish silty Sand with


gravel

1.5 -1.50 SPT 7 9 13 22 200


DS

Yellowish pink sandy Silt

3.0 -3.00 SPT 19 25 34 59 230


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level

19
GEO ENGINEERING COMPANY PVT. LTD., BANGALORE
An ISO 9001:2015 Company

The Dy. Chief Engineer (East),


Client Size of Borehole 150mm
Constructions, South Western Railway
Job No 767 Ground water table Nil
BOREHOLE - 12
Project Construction works at SBC's Stores Yard Commenced 05.10.18

Location Binny Mill Completed 05.10.18

N Value = N2+N3

Core Recovery,
SPT TEST, number of blows

Depth (m)
recorded

RQD, %
Sample
Legend
Description of Sub-soil

NGL
NET SBC, kN/m2

%
stratum 1st 15cm 2nd15cm 3rd15cm

N1 N2 N3

0.0 0.00

Brownish silty Sand

0.5 -0.50 DS

Brownish silty Sand with


gravel

1.5 -1.50 SPT 6 8 11 19 180


DS

Yellowish brown sandy Silt

3.0 -3.00 SPT 17 25 35 60 240


DS

SPT=Standard Penetration test Refusal means SPT N>50 B= No. of blows R=Rebound SR: Soft Rock
HR:Hard Rock DS=Disturbed Sample CWR: completely weathered rock MWR: Moderately weathered rock

Bore hole was terminated at 3.0m depth blow existing ground level