4. Mixing Process. Assume that the tank is empty at the start. MV2 is closed. When start push button pressed
valve MV1 is open. When the level in the tank reaches level transmitter LT2, the water supply is shut off and the
motor for the conveyor belt starts at the same time that the agitator (stir) starts. When the level comes up to
transmitter LT3, the motor will stop and the magnetic valve MV2 on the outlet is opened (the agitator will continue
to run). When the level comes below LT2, the agitator is also stopped. When the level come below LT1, the valve
MV2 is closed. The sequence can now be started anew by activating the start button.
5. This process requires that boxes moving on a conveyor be automatically positioned and filled. The sequence of
operation for the continuous filling operation is as follows:
• Start the conveyor when the start button is momentarily pressed.
• Stop the conveyor when the stop button is momentarily pressed.
• Energize the run status light when the process is operating.
• Energize the standby status light when the process is stopped.
• Stop the conveyor when the right edge of the box is first sensed by the photosensor.
• With the box in position and the conveyor stopped, open the solenoid valve and allow the box to fill. Filling
should stop when the level sensor goes true.
• Energize the full light when the box is full. The full light should remain energized until the box is moved clear
of the photosensor.