You are on page 1of 1

TOP ( PYRAMIDION )

GROUND LINE

4 - 12mmØ VERTICAL BARS with 10mmØ


TIES, 2@50mm, 3@75, 5@100,REST @ 150
O.C.

5 - 12mm Ø
MATTING BARS
SPACED AS SHOWN BOTH WAYS

4 - 12mmØ VERTICAL BARS with 9mmØ


TIES,
2@50mm, 3@75, 5@100,REST @ 150 O.C.
0.05mm thk. GRAVEL BEDDING 0.05mm thk.
GRAVEL BEDDING

5 - 12mm Ø
MATTING BARS
SPACED AS SHOWN BOTH WAYS

ELEVATION PLAN

ELECTRICAL SERVICE
ENTRANCE PEDESTAL DETAIL
SCALE 1:40 M

ARIANNA

FROM THE OFFICE OF: CIVIL ENGINEER NOTE: THESE DRAWINGS AND SPECIFICATIONS AND PROJECT TITLE OWNER REVISIONS SHEET CONTENTS SHEET NO.
OTHER CONTRACT DOCUMENTS DULY SIGNED, STAMPED
OR SEALED AS INSTRUMENT OF SERVICES, ARE THE
INTELLECTUAL PROPERTY AND DOCUMENT OF THE
RAFAELAHOMES ITEM DRAWN DATE SERVICE ENTRANCE
ARCHITECT,WHETHER THE OBJECT FOR WHICH THEY
ARE MADE EXECUTED OR NOT, IT SHALL BE UNLAWFUL
PRIMEWORLD
S
T
1
ORE
R
Y
ED
S
E
IN
A
B
T
L
ID
G. PLAN
PRC:
PTR:
DATE:
DATE:
FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES
OF SAID DOCUMENTS FOR USE IN THE REPETITION OF
AND FOR OTHER PROJECTS OR THE BUILDINGS,
WHETHER EXECUTED PARTLY OR IN WHOLE, WITHOUT LOCATION
LAND HOLDINGS, INC.
ELEVATION S-4
PLACE: TIN: THE WRITTEN CONSENT OF THE ARCHITECT OR AUTHOR
OF SAID DOCUMENTS. BRGY. MAKINABANG, BALIUAG, BULACAN APPROVAL
REPUBLIC ACT. 9266 SEC. 33 DATE

You might also like