ACOUSTIC EMISSION EXAMINATION OF FIBER- Sensor Spacing.................................. Article 12, T-1243.4


REINFORCED PLASTIC VESSELS .............. Article 11 Multichannel Source Location... Article 12, T-1243.4.2
Calibration........................................... Article 11, T-1141(b) Zone Location ............................ Article 12, T-1243.4.1
Attenuation Characterization ......Article 11, T-1141(b)(1) System Performance Check.............. Article 12, T-1243.5
Instrument Calibration ...................................... Article 11, Documentation ......................................... Article 12, T-1290
Mandatory Appendix II Equipment and Supplies .......................... Article 12, T-1230
Sensor Locations and Spacings .......Article 11, T-1141(c) Evaluation................................................. Article 12, T-1280
System Performance Check............ Article 11, T-1141(d) Criteria.................................................. Article 12, T-1281
Documentation ......................................... Article 11, T-1190 Examination Procedure............................ Article 12, T-1244
Environmental Conditions ....................... Article 11, T-1124 Background Noise............................. Article 12, T-1244.2
Equipment and Supplies .......................... Article 11, T-1130 During Examination................... Article 12, T-1244.2.2
Evaluation................................................. Article 11, T-1180 Prior to Loading......................... Article 12, T-1244.2.1
Criteria.................................................. Article 11, T-1181 Pressurization .................................... Article 12, T-1244.3
Emissions During Load Hold.............. Article 11, T-1182 Sequence..................................... Article 12, T-1244.3.2
Felicity Ratio Determination ............... Article 11, T-1183 Test Termination............................ Article 12, T-1244.3.3
High Amplitude Events Criterion ....... Article 11, T-1184 Glossary of Terms .......Article 12, Mandatory Appendix III
Total Counts Criterion ......................... Article 11, T-1185 Instrumentation Performance Requirements ........ Article 12,
Examination Procedure............................ Article 11, T-1142 Nonmandatory Appendix I
AE Activity ..................................... Article 11, T-1142(d) Noise Reduction....................................... Article 12, T-1222
Background Noise........................... Article 11, T-1142(b) Sensor Placement Guidelines ............................... Article 12,
Stressing ...........................................Article 11, T-1142(c) Nonmandatory Appendix A
Test Termination..............................Article 11, T-1142(e) Sensors ..................................................... Article 12, T-1223
Glossary of Terms .......Article 11, Mandatory Appendix III Frequency .......................................... Article 12, T-1223.1
Instrument Settings .................................. Article 11, T-1126 Mounting ........................................... Article 12, T-1223.2
Instrumentation Performance Requirements ........ Article 11, Surface Contact................................. Article 12, T-1223.3
Mandatory Appendix I Vessel Stressing ....................................... Article 12, T-1221
Noise Elimination .................................... Article 11, T-1125 Written Procedure Requirements............. Article 12, T-1225
Sensor Placement Guidelines ............................... Article 11,
Nonmandatory Appendix A CONTINUOUS ACOUSTIC EMISSION
Sensors ..................................................... Article 11, T-1127 MONITORING ................................................... Article 13
Vessel Conditioning................................. Article 11, T-1121 AE Monitor .............................................. Article 13, T-1335
Vessel Stressing ....................................... Article 11, T-1122 Data Analysis and Display ............... Article 13, T-1335.4
Vessel Support ......................................... Article 11, T-1123 Data Storage...................................... Article 13, T-1335.3
Written Procedure Requirements............. Article 11, T-1128 Installation............................................ Article 13, T-1349
Signal Identification.......................... Article 13, T-1335.1
ACOUSTIC EMISSION EXAMINATION OF Signal Processing .............................. Article 13, T-1335.2
METALLIC VESSELS ...................................... Article 12 AE System Operation .............................. Article 13, T-1351
AE Source Location................................. Article 12, T-1224 Amplifiers................................................. Article 13, T-1334
Calibration................................................ Article 12, T-1243 Background Noise.................................... Article 13, T-1345
Attenuation Characterization ............Article 12, T-1243.2 Cables ....................................................... Article 13, T-1333
Instrument Calibration ...................................... Article 12, Calibration................................................ Article 13, T-1360
Mandatory Appendix II Intervals................................................ Article 13, T-1363
On-Site System Calibration .............. Article 12, T-1243.1 Sensors ................................................. Article 13, T-1361
Sensor Location ................................ Article 12, T-1243.3 System .................................................. Article 13, T-1362

654

COPYRIGHT American Society of Mechanical Engineers


Licensed by Information Handling Services
INDEX

Detection and Source Location .... Article 13, T-1362.1 Functional Verification ................. Article 13, T-1347.3
Function Verification .................... Article 13, T-1362.2 Mounting ............................................. Article 13, T-332.3
Component Stressing ............................... Article 13, T-1324 Source Location and Sensor Mounting... Article 13, T-1327
Coordination with Plant System Owner/Operator ..... Article Signal Lead Installation ........................... Article 13, T-1348
13, T-1326 Signal Pattern Recognition ...................... Article 13, T-1343
Data Processing, Interpretation, and Evaluation........ Article
13, T-1352 EDDY CURRENT EXAMINATION OF TUBULAR
Data Recording and Storage.................... Article 13, T-1353 PRODUCTS........................................................... Article 8
Equipment ................................................ Article 13, T-1330 Calibration.................................................... Article 8, T-860
Equipment Qualification.......................... Article 13, T-1341 Eddy Current Examination
Evaluation/Results.................................... Article 13, T-1380 Coated Ferritic Materials .................................... Article 8,
Data Processing, Interpretation, and Mandatory Appendix III
Evaluation.................................. Article 13, T-1381.2 Installed Nonferromagnetic Heat Exchanger
Data Requirements........................ Article 13, T-1381.1 Tubing ...................... Article 8, Mandatory Appendix I
Examination ............................................. Article 13, T-1370 Nonferromagnetic Heat Exchanger Tubing ........... Article
Non-Metallic Components................................ Article 13, 8, Mandatory Appendix II
Mandatory Appendix III Evaluation..................................................... Article 8, T-880
Non-Nuclear Components ................................ Article 13, Glossary of Terms .........Article 8, Mandatory Appendix IV
Mandatory Appendix II Personnel Qualification................................ Article 8, T-822
Nuclear Components......................................... Article 13, Reference Specimen..................................... Article 8, T-831
Mandatory Appendix I Written Procedure ........................................ Article 8, T-821
Glossary of Terms ..... Article 13, Mandatory Appendix VII Procedure Requirements .......................... Article 8, T-841
Hostile Environment Applications ....................... Article 13, GENERAL REQUIREMENTS............................... Article 1
Mandatory Appendix V Acceptance Standards .................................. Article 1, T-180
Leak Detection Applications ................................ Article 13, ASTM Standards and Recommended Practices .... Article 1,
Mandatory Appendix VI T-170
Limited Zone Monitoring ..................................... Article 13, Authorized Inspector/Authorized Code Inspector...... Article
Mandatory Appendix IV 1, T-170
Material Attenuation/Characterization..... Article 13, T-1344 Calibration.................................................... Article 1, T-160
Noise Interference.................................... Article 13, T-1325 Equipment .................................................... Article 1, T-130
Objectives................................................. Article 13, T-1321 Evaluation..................................................... Article 1, T-180
Personnel Qualification........Article 13, T-1323 and T-1371 Examinations and Inspections ..................... Article 1, T-170
Plant Startup............................................. Article 13, T-1372 Fabricator ..................................................... Article 1, T-150
Plant Steady-State Operation................... Article 13, T-1373 Glossary of Terms ........... Article 1, Mandatory Appendix I
AE System Function Check ......... Article 13, T-1373.2 Installer......................................................... Article 1, T-150
Data Evaluation Interval............... Article 13, T-1373.1 Limited Certification............................... Article 1, T-140(d)
Procedures ................................................ Article 13, T-1350 Manufacturer ................................................ Article 1, T-150
Relative Indications ................................. Article 13, T-1322 NDE Personnel Certification ....................... Article 1, T-140
Reports/Records ....................................... Article 13, T-1390 Procedure...................................................... Article 1, T-150
Calibration Records ............................. Article 13, T-1364 Procedures, Special ......................................Article T-150(a)
Qualification Records .......................... Article 13, T-1346 Quality Assurance/Quality Control System ........... Article 1,
Reports to Plant System Owner/Operator........ Article 13, T-150
T-1391 Records/Documentation ............................... Article 1, T-190
Senser Qualification................................. Article 13, T-1342 Referencing Code Section ........................... Article 1, T-150
Sensitivity and Frequency Response................ Article 13,
T-1342.1 LEAK TESTING .................................................... Article 10
Uniformity of Sensor Sensitivity...... Article 13, T-1342.2 Bubble Test
Sensors ..................................................... Article 13, T-1332 Direct Pressure Technique................................ Article 10,
Frequency .......................................... Article 13, T-1332.1 Mandatory Appendix I
Differential and Tuned Sensors........ Article 13, T-1332.2 Vaccum Box Technique ................................... Article 10,
Installation.............................................. Article 13, T-347 Mandatory Appendix II
Array Spacing ............................... Article 13, T-1347.2 Calibration................................................ Article 10, T-1060
Coupling ........................................ Article 13, T-1347.1 Calibration Leak Standards ................. Article 10, T-1063

655

COPYRIGHT American Society of Mechanical Engineers


Licensed by Information Handling Services
2001 SECTION V

Capillary Type Leak Standard...... Article 10, T-1063.2 MAGNETIC PARTICLE EXAMINATION ......... Article 7
Permeation Type Leak Standard .. Article 10, T-1063.1 Black Light Intensity ..........................Article 7, T-731(c)(4)
Pressure/Vaccum Gages....................... Article 10, T-1061 Calibration.................................................... Article 7, T-760
Temperature Measuring Devices......... Article 10, T-1062 Circular Magnetization Technique .............. Article 7, T-775
Cleanliness ............................................... Article 10, T-1041 Central Conductor Technique............... Article 7, T-775.2
Documentation ......................................... Article 10, T-1090 Magnetizing Current ........................ Article 7, T-775.2(b)
Evaluation................................................. Article 10, T-1080 Magnetizing Procedure .................Article 7, T-775.2(a)
Gages........................................................ Article 10, T-1031 Direct Contact Technique..................... Article 7, T-775.1
Location........................................... Article 10, T-1031(b) Magnetizing Current .................... Article 7, T-775.1(b)
Range................................................Article 10, T-1031(a) Magnetizing Procedure .................Article 7, T-775.1(a)
Glossary of Terms ..... Article 10, Mandatory Appendix VII Demagnetization........................................... Article 7, T-755
Halogen Diode Detector Probe Test .................... Article 10, Equipment .................................................... Article 7, T-730
Mandatory Appendix III Evaluation..................................................... Article 7, T-780
Helium Mass Spectrometer Test Examination ................................................. Article 7, T-770
Detector Probe Technique ................................ Article 10, Direction of Examination ........................ Article 7, T-771
Mandatory Appendix IV Examination Coverage............................. Article 7, T-772
Tracer Probe and Hood Techniques................. Article 10, Examination Medium................................... Article 7, T-731
Mandatory Appendix V Dry Particles.........................................Article 7, T-731(a)
Preliminary Leak Test ............................. Article 10, T-1051 Fluorescent Particles ............................Article 7, T-731(c)
Pressure Change Test...Article 10, Mandatory Appendix VI Wet Particles ....................................... Article 7, T-731(b)
Pressure/Vaccum (Pressure Limits)......... Article 10, T-1044 Glossary of Terms .......... Article 7, Mandatory Appendix II
Procedure/Technique................................ Article 10, T-1050 Lifting Power of Yokes ............................... Article 7, T-762
Sealing Openings ..................................... Article 10, T-1042 Longitudinal Magnetization Technique....... Article 7, T-774
Temperature ............................................. Article 10, T-1043 Magnetizing Current ............................. Article 7, T-774.3
Test ........................................................... Article 10, T-1070 Magnetizing Field Strength .................. Article 7, T-774.2
Written Procedure .................................... Article 10, T-1021 Magnetizing Procedure ......................... Article 7, T-774.1
Magnetic Particle Field Indicator................ Article 7, T-753
LIQUID PENETRANT EXAMINATION ............. Article 6 Magnetic Particle Examination of Coated
Black Light Intensity ........................... Article 6, T-676.4(d) Ferritic Materials................................................. Article 7,
Control of Contaminants ............................. Article 6, T-641 Mandatory Appendix I
Developing ................................................... Article 6, T-675 Magnetization Techniques ........................... Article 7, T-752
Dry Developer Application .................. Article 6, T-675.1 Method of Examination ............................... Article 7, T-751
Wet Developer Application .................. Article 6, T-675.2 Multidirectional Magnetization
Documentation/Records ............................... Article 6, T-690 Technique ................................................. Article 7, T-777
Drying After Excess Penetrant Removal .... Article 6, T-674 Magnetizing Field Strength .................. Article 7, T-777.2
Drying After Preparation ............................. Article 6, T-643 Magnetizing Procedure ......................... Article 7, T-777.1
Evaluation..................................................... Article 6, T-680 Procedure/Technique.................................... Article 7, T-750
Excess Penetrant Removal........................... Article 6, T-673 Prod Technique ............................................ Article 7, T-773
Post Emulsifying Penetrants................. Article 6, T-673.2 Magnetizing Current ............................. Article 7, T-773.2
Solvent Removable Penetrants ............. Article 6, T-673.3 Magnetizing Procedure ......................... Article 7, T-773.1
Water Washable Penetrants .................. Article 6, T-673.1 Prod Spacing ......................................... Article 7, T-773.3
Glossary of Terms ...........Article 6, Mandatory Appendix 1 Records......................................................... Article 7, T-790
Interpretation ................................................ Article 6, T-676 Rectified Current.......................................... Article 7, T-754
Liquid Penetrant Comparator ................... Article 6, T-653.2 Surface Conditioning ................................... Article 7, T-741
Procedure...................................................... Article 6, T-621 Yoke Technique ........................................... Article 7, T-776
Penetrant Application................................... Article 6, T-671 Application ............................................ Article 7, T-776.1
Penetrant Materials ...................................... Article 6, T-631 Magnetizing Procedure ......................... Article 7, T-776.2
Penetration Time.......................................... Article 6, T-672
Surface Preparation...................................... Article 6, T-642 RADIOGRAPHIC EXAMINATION...................... Article 2
Techniques ................................................... Article 6, T-651 Backscatter Radiation .................................. Article 2, T-223
Nonstandard Temperature........................ Article 6, T-653 Excessive Backscatter.............................. Article 2, T-284
Standard Temperature.............................. Article 6, T-653 Castings (Examination)............................................ Article 3
Restrictions............................................... Article 6, T-654 Densitometer Calibration ............................. Article 2, T-262

656

COPYRIGHT American Society of Mechanical Engineers


Licensed by Information Handling Services
INDEX

Density Limitations................................... Article 2, T-282.1 Film Side Markers ....................... Article 2, T-275.1(b)
Monitoring Density Limitations .............. Article 2, T-225 Source Side Markers.....................Article 2, T-275.1(a)
Density Variation ...................................... Article 2, T-282.2 Penetrameters (see Image Quality Indicators)
Digital Image Acquisition, Display, and Storage ...... Article Pipe or Tube Weld Technique Sketches................ Article 2,
2, Mandatory Appendix III Nonmandatory Appendix A
Interpretation, Evaluation, and Disposition........ Article 2, Procedure Requirements .............................. Article 2, T-281
Mandatory Appendix IV Quality of Radiographs................................ Article 2, T-281
Direction of Radiation ................................. Article 2, T-273 Radiographic Technique .............................. Article 2, T-271
Documentation ............................................. Article 2, T-290 Real-Time Radioscopic Examination..................... Article 2,
Double-Wall Technique............................ Article 2, T-271.2 Mandatory Appendix II
Double-Wall Viewing...................... Article 2, T-271.2(b) Sensitivity..................................................... Article 2, T-283
Single-Wall Viewing ........................Article 2, T-271.2(a) Single-Wall Technique ............................. Article 2, T-271.1
Energy of Radiation..................................... Article 2, T-272 Source Size Determination ....................... Article 2, T-261.2
Gamma Radiation ................................. Article 2, T-272.2 Source Size Verification........................... Article 2, T-261.1
X-Radiation ........................................... Article 2, T-272.1 Step Wedge Film Density Verification....... Article 2, T-262
Equipment and Materials............................. Article 2, T-230 Surface Preparation...................................... Article 2, T-222
Evaluation..................................................... Article 2, T-280 Materials................................................ Article 2, T-222.1
By Manufacturer ...................................... Article 2, T-292 Surface Finish ....................................... Article 2, T-222.3
Film Processing......................................... Article 2, T-231.2 Welds..................................................... Article 2, T-222.2
Film Selection ........................................... Article 2, T-231.1
Film Viewing Facilities ............................... Article 2, T-234
ULTRASONIC EXAMINATION METHODS FOR
Geometric Unsharpness ............................... Article 2, T-274
INSERVICE INSPECTION ................................ Article 4
Limitations ............................................... Article 2, T-285
Amplitude Control Lenearity.................... Article 4, T-461.2
Glossary of Terms ..........Article 2, Mandatory Appendix V
and Mandatory Appendix II
Identification System ................................... Article 2, T-224
Angle Beam Calibrations (General
Image Quality Indicators (Penetrameters)
Techniques) ......................................................... Article 4,
Design....................................................... Article 2, T-233
Nonmandatory Appendix B
Equivalent Sensitivity ......................................... Article 2,
Basic Calibration Block............................... Article 4, T-435
Nonmandatory Appendix B
and Nonmandatory Appendix J
Number.................................................. Article 2, T-277.2
Multiple Penetrameters .................Article 2, T-277.2(a) Block Selection ..........................Article 4, Nonmandatory
Special Cases ............................... Article 2, T-277.2(b) Appendix J, J-10(a)
Placement .............................................. Article 2, T-277.1 Block Quality .............................Article 4, Nonmandatory
Film Side...................................... Article 2, T-277.1(b) Appendix J, J-10(e)
Hole-Type Penetrameters..............Article 2, T-277.1(c) Clad ............................................Article 4, Nonmandatory
Materials Other Than Welds ........Article 2, T-277.1(e) Appendix J, J-10(b)
Sketches.............Article 2, Nonmandatory Appendix C Heat Treatment...........................Article 4, Nonmandatory
Source Side ...................................Article 2, T-277.1(a) Appendix J, J-10(c)
Wire Type Penetrameters ............ Article 2, T-277.1(d) Reflectors ...................................Article 4, Nonmandatory
Selection ................................................... Article 2, T-276 Appendix J, J-20
Dissimilar Material Welds................ Article 2, T-276.3 Diameters Greater Than 20 Inches ................ Article 4,
Material ............................................. Article 2, T-276.1 Nonmandatory Appendix J, J-10(e)
Size .................................................... Article 2, T-276.2 Diameters 20 Inches and Less........................ Article 4,
Shims Under Hole-Type Penetrameters............. Article 2, Nonmandatory Appendix J, J-10(f)
T-277.3 Surface Finish ............................Article 4, Nonmandatory
In-Motion Radiography .......................................... Article 2, Appendix J, J-10(d)
Mandatory Appendix I Beam Angle ...................................Article 4, Nonmandatory
Intensifying Screens..................................... Article 2, T-232 Appendix I, I-20
Location Markers ......................................... Article 2, T-275 Beam Spread Measurements .................... Article 4, T-434.1
Double-Wall Viewing........................... Article 2, T-275.2 Bolts and Studs (Inservice Examination)............... Article 4,
Maps ...................................................... Article 2, T-275.3 Nonmandatory Appendix L
Single-Wall Viewing ............................ Article 2, T-275.1 Calibration.................................................... Article 4, T-460
Either side Markers.......................Article 2, T-275.1(c) System ...................................................... Article 4, T-462

657

COPYRIGHT American Society of Mechanical Engineers


Licensed by Information Handling Services
2001 SECTION V

Computerized Imaging Techniques........................ Article 4, T-542.3.4


T-436 and Nonmandatory Appendix E Diameters 20 Inches and Less....... Article 5, T-542.3.5
Equipment .................................................... Article 4, T-430 Pipe.............................................. Article 5, T-542.8.1.2
Evaluation..................................................... Article 4, T-480 Surface Finish ............................ Article 5, T-542.2.1.1(d)
Examination Coverage.............................. Article 4, T-424.1 Beam Angle .............Article 5, T-542.6.1.4 and T-542.8.2.2
Glossary of Terms .........Article 5, Mandatory Appendix III Bolts and Studs (Inservice Examination)............... Article 5,
Instrument Requirements ............................. Article 4, T-431 T-541.5.3
Nozzle Examination.. Article 4, Nonmandatory Appendix F Bolting Material (Examination)................ Article 5, T-541.5
Nozzle Inner Radius and Inner Corner Region Calibration (General) ................................... Article 5, T-534
Examinations............................................ Article 4, T-442 Calibration (Welds).................................... Article 5,T-542.2
Personnel Requirements............................... Article 4, T-422 Calibration Check ........ Article 5, T-542.4.6 to T-542.4.8
Pumps and Valves (Including Welds)......... Article 4, T-444 DAC Correction ................................. Article 5, T-542.5.2
Rate of Search Unit Movements .............. Article 4, T-424.2 Pipe..................................................... Article 5, T-542.8.1
Scanning Sensitivity Level ....................... Article 4, T-424.3 Angle Beam ................................... Article 5, T-542.8.2
Records......................................................... Article 4, T-490 Straight Beam.............................. Article 5, T-542.8.2.5
Planar Reflectors System ................................................... Article 5, T-542.4
Data Record Example..................................... Article 4, Angle Beam ................................... Article 5, T-542.4.4
Nonmandatory Appendix D Straight Beam................................. Article 5, T-542.4.5
Recording Angle Beam Examination Data.... Article 4, Sweep Range Correction ................... Article 5, T-542.5.1
Nonmandatory Appendix H Cladding (Examination)............................... Article 5, T-543
Recording Straight Beam Examination Data..... Article Equipment and Supplies .............................. Article 5, T-530
4, Nonmandatory Appendix K Evaluation..................................................... Article 5, T-580
Screen Height Linearity............................ Article 4, T-461.1 Examination Coverage.............................. Article 5, T-523.1
and Mandatory Appendix I Forgings and Bars (Examination) ............ Article 5, T-541.2
Straight Beam Calibrations (General Frequency (Instrument)................................ Article 5, T-531
Techniques) ......................................................... Article 4, Search Unit...........Article 5, T-542.6.1.3 and T-542.8.2.1
Nonmandatory Appendix C Glossary of Terms .........Article 5, Mandatory Appendix III
Vessel Examinations.................................... Article 4, T-441 Plate (Examination) .................................. Article 5, T-541.1
Rate of Search Unit Movement................ Article 5, T-523.2
Welds........................................................ Article 4, T-471
Recording Sensitivity Level ..................... Article 5, T-523.3
Examination Using Angle Beam Search
Reports and Records.................................... Article 5, T-590
Units ............................................................ Article 4,
Screen Height Linearity............................... Article 5, T-532
Nonmandatory Appendix I
and Mandatory Appendix I
Surface Preparation........................ Article 4, T-471.1.2
Search Units ................................................. Article 5, T-535
Vessel Reference Points (Layout) .......................... Article 4,
Thickness Measurement............................... Article 5, T-544
Nonmandatory Appendix A
Tubular Products (Examination) .............. Article 5, T-541.3
Written Procedure Requirements................. Article 4, T-450
Welds (Examination) ................................... Article 5, T-542
Austenitic and High Nickel Alloy Welds .......... Article 5,
ULTRASONIC EXAMINATION METHODS FOR T-542.8.5
MATERIALS AND FABRICATION................. Article 5 Ferritic Welds in Ferritic Pipe.............. Article 5, T-542.8
Alternate Calibration Block Configuration ............ Article 5, Evaluation.................................... Article 5, T-542.8.4.3
Nonmandatory Appendix II Scanning ......................................... Article 5, T-542.8.4
Amplitude Control Linearity ....................... Article 5, T-533 Surface Preparation..................... Article 5, T-542.8.3.1
and Mandatory Appendix A Wrought and Cast Ferritic Product Forms (Excluding
Basic Calibration Block (Welds)........... Article 5, T-542.2.1 Pipe) .................................................. Article 5, T-542.6
Block Selection ..............................Article 5, T-542.2.1(a) Evaluation.................................... Article 5, T-542.7.2.5
Block Quality ..............................Article 5, T-542.2.1.1(e) Scanning ......................................... Article 5, T-542.7.2
Clad ............................................ Article 5, T-542.2.1.1(b) Surface Preparation........................ Article 5, T-542.7.1
Heat Treatment............................Article 5, T-542.2.1.1(c) Written Procedure Requirements............. Article 5, T-522
Material ........................................... Article 5, T-542.2.1.1
Pipe.................................................. Article 5, T-542.8.1.1 VISUAL EXAMINATION....................................... Article 9
Reflectors .............................................. Article 5, T-542.3 Applications ................................................. Article 9, T-951
Diameters Greater Than 20 Inches ................ Article 5, Direct Visual Examination .......................... Article 9, T-952

658

COPYRIGHT American Society of Mechanical Engineers


Licensed by Information Handling Services
INDEX

Evaluation..................................................... Article 9, T-980


Glossary of Terms ........... Article 9, Mandatory Appendix I
Personnel Requirements............................... Article 9, T-942
Procedure Technique ................................... Article 9, T-950
Records/Reports ........................................... Article 9, T-990
Remote Visual Examination........................ Article 9, T-953
Translucent Visual Examination ................. Article 9, T-954
Written Procedure Requirements................. Article 9, T-941

659

COPYRIGHT American Society of Mechanical Engineers


Licensed by Information Handling Services
COPYRIGHT American Society of Mechanical Engineers
Licensed by Information Handling Services

You might also like