Professional Documents
Culture Documents
Index: Licensed by Information Handling Services Licensed by Information Handling Services
Index: Licensed by Information Handling Services Licensed by Information Handling Services
654
Detection and Source Location .... Article 13, T-1362.1 Functional Verification ................. Article 13, T-1347.3
Function Verification .................... Article 13, T-1362.2 Mounting ............................................. Article 13, T-332.3
Component Stressing ............................... Article 13, T-1324 Source Location and Sensor Mounting... Article 13, T-1327
Coordination with Plant System Owner/Operator ..... Article Signal Lead Installation ........................... Article 13, T-1348
13, T-1326 Signal Pattern Recognition ...................... Article 13, T-1343
Data Processing, Interpretation, and Evaluation........ Article
13, T-1352 EDDY CURRENT EXAMINATION OF TUBULAR
Data Recording and Storage.................... Article 13, T-1353 PRODUCTS........................................................... Article 8
Equipment ................................................ Article 13, T-1330 Calibration.................................................... Article 8, T-860
Equipment Qualification.......................... Article 13, T-1341 Eddy Current Examination
Evaluation/Results.................................... Article 13, T-1380 Coated Ferritic Materials .................................... Article 8,
Data Processing, Interpretation, and Mandatory Appendix III
Evaluation.................................. Article 13, T-1381.2 Installed Nonferromagnetic Heat Exchanger
Data Requirements........................ Article 13, T-1381.1 Tubing ...................... Article 8, Mandatory Appendix I
Examination ............................................. Article 13, T-1370 Nonferromagnetic Heat Exchanger Tubing ........... Article
Non-Metallic Components................................ Article 13, 8, Mandatory Appendix II
Mandatory Appendix III Evaluation..................................................... Article 8, T-880
Non-Nuclear Components ................................ Article 13, Glossary of Terms .........Article 8, Mandatory Appendix IV
Mandatory Appendix II Personnel Qualification................................ Article 8, T-822
Nuclear Components......................................... Article 13, Reference Specimen..................................... Article 8, T-831
Mandatory Appendix I Written Procedure ........................................ Article 8, T-821
Glossary of Terms ..... Article 13, Mandatory Appendix VII Procedure Requirements .......................... Article 8, T-841
Hostile Environment Applications ....................... Article 13, GENERAL REQUIREMENTS............................... Article 1
Mandatory Appendix V Acceptance Standards .................................. Article 1, T-180
Leak Detection Applications ................................ Article 13, ASTM Standards and Recommended Practices .... Article 1,
Mandatory Appendix VI T-170
Limited Zone Monitoring ..................................... Article 13, Authorized Inspector/Authorized Code Inspector...... Article
Mandatory Appendix IV 1, T-170
Material Attenuation/Characterization..... Article 13, T-1344 Calibration.................................................... Article 1, T-160
Noise Interference.................................... Article 13, T-1325 Equipment .................................................... Article 1, T-130
Objectives................................................. Article 13, T-1321 Evaluation..................................................... Article 1, T-180
Personnel Qualification........Article 13, T-1323 and T-1371 Examinations and Inspections ..................... Article 1, T-170
Plant Startup............................................. Article 13, T-1372 Fabricator ..................................................... Article 1, T-150
Plant Steady-State Operation................... Article 13, T-1373 Glossary of Terms ........... Article 1, Mandatory Appendix I
AE System Function Check ......... Article 13, T-1373.2 Installer......................................................... Article 1, T-150
Data Evaluation Interval............... Article 13, T-1373.1 Limited Certification............................... Article 1, T-140(d)
Procedures ................................................ Article 13, T-1350 Manufacturer ................................................ Article 1, T-150
Relative Indications ................................. Article 13, T-1322 NDE Personnel Certification ....................... Article 1, T-140
Reports/Records ....................................... Article 13, T-1390 Procedure...................................................... Article 1, T-150
Calibration Records ............................. Article 13, T-1364 Procedures, Special ......................................Article T-150(a)
Qualification Records .......................... Article 13, T-1346 Quality Assurance/Quality Control System ........... Article 1,
Reports to Plant System Owner/Operator........ Article 13, T-150
T-1391 Records/Documentation ............................... Article 1, T-190
Senser Qualification................................. Article 13, T-1342 Referencing Code Section ........................... Article 1, T-150
Sensitivity and Frequency Response................ Article 13,
T-1342.1 LEAK TESTING .................................................... Article 10
Uniformity of Sensor Sensitivity...... Article 13, T-1342.2 Bubble Test
Sensors ..................................................... Article 13, T-1332 Direct Pressure Technique................................ Article 10,
Frequency .......................................... Article 13, T-1332.1 Mandatory Appendix I
Differential and Tuned Sensors........ Article 13, T-1332.2 Vaccum Box Technique ................................... Article 10,
Installation.............................................. Article 13, T-347 Mandatory Appendix II
Array Spacing ............................... Article 13, T-1347.2 Calibration................................................ Article 10, T-1060
Coupling ........................................ Article 13, T-1347.1 Calibration Leak Standards ................. Article 10, T-1063
655
Capillary Type Leak Standard...... Article 10, T-1063.2 MAGNETIC PARTICLE EXAMINATION ......... Article 7
Permeation Type Leak Standard .. Article 10, T-1063.1 Black Light Intensity ..........................Article 7, T-731(c)(4)
Pressure/Vaccum Gages....................... Article 10, T-1061 Calibration.................................................... Article 7, T-760
Temperature Measuring Devices......... Article 10, T-1062 Circular Magnetization Technique .............. Article 7, T-775
Cleanliness ............................................... Article 10, T-1041 Central Conductor Technique............... Article 7, T-775.2
Documentation ......................................... Article 10, T-1090 Magnetizing Current ........................ Article 7, T-775.2(b)
Evaluation................................................. Article 10, T-1080 Magnetizing Procedure .................Article 7, T-775.2(a)
Gages........................................................ Article 10, T-1031 Direct Contact Technique..................... Article 7, T-775.1
Location........................................... Article 10, T-1031(b) Magnetizing Current .................... Article 7, T-775.1(b)
Range................................................Article 10, T-1031(a) Magnetizing Procedure .................Article 7, T-775.1(a)
Glossary of Terms ..... Article 10, Mandatory Appendix VII Demagnetization........................................... Article 7, T-755
Halogen Diode Detector Probe Test .................... Article 10, Equipment .................................................... Article 7, T-730
Mandatory Appendix III Evaluation..................................................... Article 7, T-780
Helium Mass Spectrometer Test Examination ................................................. Article 7, T-770
Detector Probe Technique ................................ Article 10, Direction of Examination ........................ Article 7, T-771
Mandatory Appendix IV Examination Coverage............................. Article 7, T-772
Tracer Probe and Hood Techniques................. Article 10, Examination Medium................................... Article 7, T-731
Mandatory Appendix V Dry Particles.........................................Article 7, T-731(a)
Preliminary Leak Test ............................. Article 10, T-1051 Fluorescent Particles ............................Article 7, T-731(c)
Pressure Change Test...Article 10, Mandatory Appendix VI Wet Particles ....................................... Article 7, T-731(b)
Pressure/Vaccum (Pressure Limits)......... Article 10, T-1044 Glossary of Terms .......... Article 7, Mandatory Appendix II
Procedure/Technique................................ Article 10, T-1050 Lifting Power of Yokes ............................... Article 7, T-762
Sealing Openings ..................................... Article 10, T-1042 Longitudinal Magnetization Technique....... Article 7, T-774
Temperature ............................................. Article 10, T-1043 Magnetizing Current ............................. Article 7, T-774.3
Test ........................................................... Article 10, T-1070 Magnetizing Field Strength .................. Article 7, T-774.2
Written Procedure .................................... Article 10, T-1021 Magnetizing Procedure ......................... Article 7, T-774.1
Magnetic Particle Field Indicator................ Article 7, T-753
LIQUID PENETRANT EXAMINATION ............. Article 6 Magnetic Particle Examination of Coated
Black Light Intensity ........................... Article 6, T-676.4(d) Ferritic Materials................................................. Article 7,
Control of Contaminants ............................. Article 6, T-641 Mandatory Appendix I
Developing ................................................... Article 6, T-675 Magnetization Techniques ........................... Article 7, T-752
Dry Developer Application .................. Article 6, T-675.1 Method of Examination ............................... Article 7, T-751
Wet Developer Application .................. Article 6, T-675.2 Multidirectional Magnetization
Documentation/Records ............................... Article 6, T-690 Technique ................................................. Article 7, T-777
Drying After Excess Penetrant Removal .... Article 6, T-674 Magnetizing Field Strength .................. Article 7, T-777.2
Drying After Preparation ............................. Article 6, T-643 Magnetizing Procedure ......................... Article 7, T-777.1
Evaluation..................................................... Article 6, T-680 Procedure/Technique.................................... Article 7, T-750
Excess Penetrant Removal........................... Article 6, T-673 Prod Technique ............................................ Article 7, T-773
Post Emulsifying Penetrants................. Article 6, T-673.2 Magnetizing Current ............................. Article 7, T-773.2
Solvent Removable Penetrants ............. Article 6, T-673.3 Magnetizing Procedure ......................... Article 7, T-773.1
Water Washable Penetrants .................. Article 6, T-673.1 Prod Spacing ......................................... Article 7, T-773.3
Glossary of Terms ...........Article 6, Mandatory Appendix 1 Records......................................................... Article 7, T-790
Interpretation ................................................ Article 6, T-676 Rectified Current.......................................... Article 7, T-754
Liquid Penetrant Comparator ................... Article 6, T-653.2 Surface Conditioning ................................... Article 7, T-741
Procedure...................................................... Article 6, T-621 Yoke Technique ........................................... Article 7, T-776
Penetrant Application................................... Article 6, T-671 Application ............................................ Article 7, T-776.1
Penetrant Materials ...................................... Article 6, T-631 Magnetizing Procedure ......................... Article 7, T-776.2
Penetration Time.......................................... Article 6, T-672
Surface Preparation...................................... Article 6, T-642 RADIOGRAPHIC EXAMINATION...................... Article 2
Techniques ................................................... Article 6, T-651 Backscatter Radiation .................................. Article 2, T-223
Nonstandard Temperature........................ Article 6, T-653 Excessive Backscatter.............................. Article 2, T-284
Standard Temperature.............................. Article 6, T-653 Castings (Examination)............................................ Article 3
Restrictions............................................... Article 6, T-654 Densitometer Calibration ............................. Article 2, T-262
656
Density Limitations................................... Article 2, T-282.1 Film Side Markers ....................... Article 2, T-275.1(b)
Monitoring Density Limitations .............. Article 2, T-225 Source Side Markers.....................Article 2, T-275.1(a)
Density Variation ...................................... Article 2, T-282.2 Penetrameters (see Image Quality Indicators)
Digital Image Acquisition, Display, and Storage ...... Article Pipe or Tube Weld Technique Sketches................ Article 2,
2, Mandatory Appendix III Nonmandatory Appendix A
Interpretation, Evaluation, and Disposition........ Article 2, Procedure Requirements .............................. Article 2, T-281
Mandatory Appendix IV Quality of Radiographs................................ Article 2, T-281
Direction of Radiation ................................. Article 2, T-273 Radiographic Technique .............................. Article 2, T-271
Documentation ............................................. Article 2, T-290 Real-Time Radioscopic Examination..................... Article 2,
Double-Wall Technique............................ Article 2, T-271.2 Mandatory Appendix II
Double-Wall Viewing...................... Article 2, T-271.2(b) Sensitivity..................................................... Article 2, T-283
Single-Wall Viewing ........................Article 2, T-271.2(a) Single-Wall Technique ............................. Article 2, T-271.1
Energy of Radiation..................................... Article 2, T-272 Source Size Determination ....................... Article 2, T-261.2
Gamma Radiation ................................. Article 2, T-272.2 Source Size Verification........................... Article 2, T-261.1
X-Radiation ........................................... Article 2, T-272.1 Step Wedge Film Density Verification....... Article 2, T-262
Equipment and Materials............................. Article 2, T-230 Surface Preparation...................................... Article 2, T-222
Evaluation..................................................... Article 2, T-280 Materials................................................ Article 2, T-222.1
By Manufacturer ...................................... Article 2, T-292 Surface Finish ....................................... Article 2, T-222.3
Film Processing......................................... Article 2, T-231.2 Welds..................................................... Article 2, T-222.2
Film Selection ........................................... Article 2, T-231.1
Film Viewing Facilities ............................... Article 2, T-234
ULTRASONIC EXAMINATION METHODS FOR
Geometric Unsharpness ............................... Article 2, T-274
INSERVICE INSPECTION ................................ Article 4
Limitations ............................................... Article 2, T-285
Amplitude Control Lenearity.................... Article 4, T-461.2
Glossary of Terms ..........Article 2, Mandatory Appendix V
and Mandatory Appendix II
Identification System ................................... Article 2, T-224
Angle Beam Calibrations (General
Image Quality Indicators (Penetrameters)
Techniques) ......................................................... Article 4,
Design....................................................... Article 2, T-233
Nonmandatory Appendix B
Equivalent Sensitivity ......................................... Article 2,
Basic Calibration Block............................... Article 4, T-435
Nonmandatory Appendix B
and Nonmandatory Appendix J
Number.................................................. Article 2, T-277.2
Multiple Penetrameters .................Article 2, T-277.2(a) Block Selection ..........................Article 4, Nonmandatory
Special Cases ............................... Article 2, T-277.2(b) Appendix J, J-10(a)
Placement .............................................. Article 2, T-277.1 Block Quality .............................Article 4, Nonmandatory
Film Side...................................... Article 2, T-277.1(b) Appendix J, J-10(e)
Hole-Type Penetrameters..............Article 2, T-277.1(c) Clad ............................................Article 4, Nonmandatory
Materials Other Than Welds ........Article 2, T-277.1(e) Appendix J, J-10(b)
Sketches.............Article 2, Nonmandatory Appendix C Heat Treatment...........................Article 4, Nonmandatory
Source Side ...................................Article 2, T-277.1(a) Appendix J, J-10(c)
Wire Type Penetrameters ............ Article 2, T-277.1(d) Reflectors ...................................Article 4, Nonmandatory
Selection ................................................... Article 2, T-276 Appendix J, J-20
Dissimilar Material Welds................ Article 2, T-276.3 Diameters Greater Than 20 Inches ................ Article 4,
Material ............................................. Article 2, T-276.1 Nonmandatory Appendix J, J-10(e)
Size .................................................... Article 2, T-276.2 Diameters 20 Inches and Less........................ Article 4,
Shims Under Hole-Type Penetrameters............. Article 2, Nonmandatory Appendix J, J-10(f)
T-277.3 Surface Finish ............................Article 4, Nonmandatory
In-Motion Radiography .......................................... Article 2, Appendix J, J-10(d)
Mandatory Appendix I Beam Angle ...................................Article 4, Nonmandatory
Intensifying Screens..................................... Article 2, T-232 Appendix I, I-20
Location Markers ......................................... Article 2, T-275 Beam Spread Measurements .................... Article 4, T-434.1
Double-Wall Viewing........................... Article 2, T-275.2 Bolts and Studs (Inservice Examination)............... Article 4,
Maps ...................................................... Article 2, T-275.3 Nonmandatory Appendix L
Single-Wall Viewing ............................ Article 2, T-275.1 Calibration.................................................... Article 4, T-460
Either side Markers.......................Article 2, T-275.1(c) System ...................................................... Article 4, T-462
657
658
659