The document discusses a Medium Term Integrated Activity Plan (MT IAP) for an asset. It provides an example Functional Activity Plan for the Ughelli East 8 Flowline Project. The plan shows all preparatory and design work that must be completed before execution. It also reflects the function's current early start and finish dates as input into the first draft of the asset's MT IAP.
Original Description:
Process guide for Integrated Activity Planning with specific example for functional activity plan.
The document discusses a Medium Term Integrated Activity Plan (MT IAP) for an asset. It provides an example Functional Activity Plan for the Ughelli East 8 Flowline Project. The plan shows all preparatory and design work that must be completed before execution. It also reflects the function's current early start and finish dates as input into the first draft of the asset's MT IAP.
The document discusses a Medium Term Integrated Activity Plan (MT IAP) for an asset. It provides an example Functional Activity Plan for the Ughelli East 8 Flowline Project. The plan shows all preparatory and design work that must be completed before execution. It also reflects the function's current early start and finish dates as input into the first draft of the asset's MT IAP.
Figure 5 is an example of the Functional Activity Plan for the
Ughelli East 8 Flowline Project. The plan shows all of the preparatory and design work required to be completed in advance of the execution phase. The execution window then reflects the function’s current early start and finish dates for input to the first draft asset MT IAP.